CONSTRUCT FENCE TO ENCLOSE AND SECURE HAZARDOUS WASTE SITE FACILITIES. IN ADDITION, CONSTRUCT AN OPEN LOT ON THE EAST SIDE OF B9243 FOR PARKING.Department of Defense$128.9K obligationsEnds Oct 2, 2026
REPAIR ROADS ON FORT CARSON.Department of Defense$326.0K obligationsEnds Sep 15, 2026
MORALE, WELFARE, AND RECREATION (MWR) PROJECT 25-024 REPAIR PLAYGROUND AND CONCRETE B6058 AND 6060Department of Defense$2.4M obligationsEnds Nov 5, 2026
DPW24-009 IMP, CLOVER DITCH TRAIL: REPAIR WORK ON OVERLORD ROAD, INSTALL NEW CONCRETE ON STAIRS AND WALKWAYS OF FOOT BRIDGES, AND DEMO OLD FOOT BRIDGES.Department of Defense$529.4K obligationsEnds Oct 10, 2026
THE PRIMARY SCOPE IS TO GRADE, PREPARE, AMEND SOIL, SOD AND/OR SEED THE STIE IN AND AROUND THE MCKIBBEN GYM TRACK. INCLUDING LANDSCAPING ROCK, TREES, SIDEWALKS, AND…Department of Defense$1.7M obligationsEnds Jul 2, 2026
JOINT FORCES PAVING FOR COLORADO DEPARTMENT OF DEFENSE INSTALLATIONSDepartment of Defense$3.4M obligationsEnds Oct 16, 2026
DPW19-067 INVOLVES REPAIRING THE PARKING LOTS, CURBS, GUTTERS, SIDEWALKS, ADA RAMPS AT BUILDINGS 7494 AND 7493. CONSTRUCTION WILL ALSO ADDRESS SUBGRADE AND DRAINAGE ISSUES. SEE…Department of Defense$526.4K obligationsEnds Jun 27, 2026
PROJECT DPW24-050 SCOPE OF WORK INCLUDES: LANDSCAPE ROCK, FENCING, TREES, GRASS SEED, AND AN IRRIGATION SYSTEM.Department of Defense$388.5K obligationsEnds May 16, 2026
COMPLETE ALL WORK IAW THE SOW DATED 01/28/2025, AND ALL ATTACHMENTS.Department of Defense$1.7M obligationsEnds May 31, 2027
PROJECT DPW25-004 CONSISTS OF REPAIR AND REPLACE FENCES ON THE PROPERTY OF B8030 ON BEHALF OF (DPW) AT FORT CARSON, COLORADO SPRINGS.Department of Defense$651.4K obligationsEnds Apr 24, 2026
PROJECT TEN23-011 INVOLVES REPAIRING THE PARKING LOT AT BUILDING 1140. THE SCOPE OF WORK INCLUDES REMOVING AND REPLACING THE CONCRETE PARKING LOT AND SIDEWALK ON THE NORTH SIDE…Department of Defense$895.2K obligationsEnds Feb 12, 2026
DPW25-002 RPR, FY25 PW CRACK SEALS PARKING: EXTEND THE SERVICE LIFE OF ASPHALT PAVEMENT THROUGHOUT FORT CARSON BY SEALING EXISTING CRACKS IN SPECIFIED ROADS AND PARKING AREAS…Department of Defense$336.2K obligationsEnds Feb 5, 2026
DPW23-043 RPR, BOLLARDS B1552/B1554Department of Defense$196.0K obligationsEnds Oct 25, 2025
ASPEN ST. REHAB: ASPHALT OVERLAY, CRACK REPAIR, FULL-DEPTH AND CURB/GUTTER WORK. MULTIPLE SEGMENTS (KEYSTONE-STEAMBOAT, ETC.). INCLUDES GEO-MEMBRANE. SEE SOW 7/3/25 FOR…Department of Defense$3.1M obligationsEnds Oct 8, 2026
DPW20-040 INSTALL PAVEMENTDepartment of Defense$1.4M obligationsEnds Nov 8, 2025
MILL AND OVERLAY OF ASPHALT PAVEMENT. DEEP STRENGTHENING, CURB AND GUTTER REPLACEMENT, AND DRAINAGE STRUCTURE ADJUSTMENTS IN SELECT AREAS. THE CONTRACTOR SHALL ADHERE TO…Department of Defense$505.7K obligationsEnds Oct 1, 2025
FT CARSON CHAPEL SIDEWALK REPAIR.Department of Defense$448.0K obligationsEnds Jun 20, 2025
POTHOLE REPAIR AND PAVING FOR PETERSON SPACE FORCE BASEDepartment of Defense$2.7M obligationsEnds Dec 6, 2024
REPAIR STORMWATER PONDS BASEWIDEDepartment of Defense$1.4M obligationsEnds May 15, 2025
DPW24-003 CRACK SEAL ROADS POST WIDEDepartment of Defense$183.0K obligationsEnds May 5, 2025
REPAIR PARKING LOT, BUILDING B1364 (DPW 24-015), FORT CARSON, COLORADO. FULL DEPTH REPAIR OF ASPHALT PARKING LOT PAVEMENT. REMOVE VAULT, REPAIR SUBGRADE, REPLACE CURB AND GUTTER…Department of Defense$779.0K obligationsEnds Feb 24, 2025
DPW23-008 RPR, SEC GRAVEL PARKING LOT B1Department of Defense$486.0K obligationsEnds Dec 23, 2024