Federal contract award

0001

IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RI
NAICS561210 — Facilities Support Services
PSCR799 — Other Management Support Services
Parent award / vehicleW52P1J14G0023
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$175.9M
Current contract value$194.3M
Potential contract value / ceiling$207.1M
Start dateSep 18, 2014
Current end dateJun 1, 2027
Potential end dateJun 1, 2027
Latest award activityMay 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 201 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 12, 2026E3$0EAGLE APS-4 JAPAN WATERCRAFT / EXTENSION OF TS-23 PONTOON REPAIR CLINS
May 29, 2026E2$2.2MEAGLE APS-4 JAPAN WATERCRAFT / EXTENSION OF ODF26 AND TS23 CLINS INTO BRIDGE POP
May 14, 2026DZ$0APS-4 JAPAN WATERCRAFT / EXTEND TS-23 CLINS
May 14, 2026E1$5.3MEAGLE APS-4 JAPAN WATERCRAFT / CONTRACT BRIDGE EXTENSION AND ADDITION OF CJLOTS EXERCISE
Mar 25, 2026DY$-2.2MEAGLE APS-4 JAPAN WATERCRAFT / DEOBLIGATION MODIFICATION
Mar 5, 2026DX$0APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF ODF26 AND FUNDING REALIGNMENTS.
Jan 28, 2026DW$2.7MEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION
Dec 22, 2025DV$1.7MAPS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MOD
Dec 10, 2025DU$2.9MFUNDING MODIFICATION
Dec 3, 2025DS$564.3KEAGLE APS-4 JAPAN WATERCRAFT / CREATING OPERATION DEEP FREEZE 2026 CLINS AND FULLY FUNDING UCO.
Dec 3, 2025DT$-22.1KEAGLE APS-4 JAPAN WATERCRAFT / DELETING OLD ODF 2026 CLINS
Nov 19, 2025DR$1.5MEAGLE APS-4 JAPAN WATERCRAFT / EXERCISE OPTION PERIOD 2 AND OBLIGATE INCREMENTAL FUNDING
Nov 14, 2025DQ$22.1KAPS-4 JAPAN WATERCRAFT / ADDITION OF OPERATION DEEP FREEZE REQUIREMENT VIA UCO
Oct 1, 2025DP$0EAGLE APS-4 JAPAN WATERCRAFT / REALIGNMENT OF FUNDS
Sep 17, 2025DN$1.6MAPS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING TO FULLY FUND CURRENT OPTION PERIOD.
Aug 27, 2025DM$6.0KEAGLE APS-4 JAPAN WATERCRAFT / REALIGNMENT OF FUNDS BASED ON CONTRACTOR'S REQUEST AND ADDITION OF INCREMENTAL FUNDING FOR OPERATION DEEP FREEZE FOR THE ORDERING OF REPAIR PARTS.
Aug 20, 2025DL$260.0KAPS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION
Jul 22, 2025DK$3.4MAPS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION
Jun 26, 2025DJ$1.5MEAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING
Jun 12, 2025DH$663.2KEAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING
Jun 10, 2025DG$2.8MEAGLE APS-4 JAPAN WATERCRAFT / ADDING FUNDING FOR TS-23 PONTOON REPAIRS
May 7, 2025DF$-50.0KEAGLE APS-4 JAPAN WATERCRAFT / FUNDING REALIGNMENT AND DEOBLIGATION OF FUNDS TO ORDER PARTS DIRECTED FROM G-ARMY.
Apr 17, 2025DE$835.0KEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION
Apr 8, 2025DD$0EAGLE APS-4 JAPAN WATERCRAFT - UPDATING OF PWS, WORKLOAD DOCUMENTS, TECHNICAL EXHIBITS, CDRLS AND REALIGNMENT OF FUNDS.
Mar 6, 2025DC$0EAGLE APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF OPERATION DEEP FREEZE MISSION REQUIREMENT.
Mar 4, 2025DB$-161.1KEAGLE APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF DEFPAC-20 REQUIREMENT AND REMOVE EXCESS FUNDING.
Feb 19, 2025DA$1.8MAPS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING AND ADDING DFARS CLAUSE 252.245-7005
Nov 26, 2024D9$6.2MEAGLE APS-4 JAPAN WATERCRAFT INCREMENTAL FUNDING AND CD-02 UPDATE.
Nov 14, 2024D8$750.0KAPS-4 JAPAN WATERCRAFT / ADDITION OF OPERATION DEEP FREEZE REQUIREMENT VIA UCO
Nov 5, 2024D7$1.3MAPS-4 JAPAN WATERCRAFT / EXERCISE OPTION PERIOD 1
Oct 9, 2024D6$0EAGLE ASP-2 JAPAN WATERCRAFT REALIGNMENT OF FUNDS FROM CLINS 9403AG TO 9403AE.
Sep 19, 2024D5$1.9MTO ADD INCREMENTAL FUNDING TO CURRENT YEAR CLINS.
Sep 4, 2024D4$115.0KTO INCREMENTALLY FUND CLIN 9402AC.
Sep 3, 2024D3$-762.8KTO DEOBLIGATE FY 23 AND FY 24 EXCESS FUNDING.
Aug 15, 2024D2$1.0MAPS-4 JAPAN WATERCRAFT / DEFINITIZATION OF 8-MONTH UCA EXTENSION.
Aug 1, 2024D1$0APS-4 JAPAN WATERCRAFT TO INCORPORATE DFARS CLAUSE 252.245-7005 MANAGEMENT AND REPORTING OF GOVERNMENT PROPERTY INTO W52P1J-14-G-0023 0001.
Jul 15, 2024CZ$2.7MEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING.
Jun 17, 2024CY$1.9MEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING.
Jun 7, 2024CX$0EAGLE ASP-4 JAPAN WATERCRAFT / FUNDING REALIGNMENT.
Jun 5, 2024CW$0EAGLE APS-4 JAPAN WATERCRAFT/ INCREASE IN CONTRACT VALUE AND CHANGE OF CLIN 9404AB FROM A COST CLIN TO A CPFF CLIN.
May 21, 2024CV$889.0KEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING FFP CLINS.
May 6, 2024CU$-2.5MEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING TS-23, CLIN FUNDING REALIGNMENT, AND PRIOR FISCAL YEAR DEOBLIGATIONS.
Apr 25, 2024CT$1.0MEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING.
Apr 12, 2024CS$1.0MAPS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS.
Mar 28, 2024CR$1.6MAPS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS AND ADDITIONAL CLIN FUNDING.
Mar 18, 2024CQ$200.0KAPS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS, CLIN RENUMBERING, AND CHANGES TO PWS.
Mar 13, 2024CP$600.0KEAGLE APS-4 JAPAN WATERCRAFT / UCA MODIFICATION TO EXECUTE CONTRACT BRIDGE FOR AN 8-MONTH PERIOD OF PERFORMANCE.
Feb 13, 2024CN$1.6MEAGLE APS-4 JAPAN WATERCRAFT / FUNDING REALIGNMENT AND INCREMENTAL FUNDING
Jan 30, 2024CM$945.5KAPS-4 JAPAN WATERCRAFT / DEFINITIZATION OF 10-MONTH UCA EXTENSION.
Jan 17, 2024CL$169.1KAPS-4 JAPAN WATERCRAFT - ADDITION OF LCU-2032 BOW THRUSTER REPAIR REQUIREMENT
Dec 18, 2023CK$903.5KEAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING
Dec 7, 2023CJ$0APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF TS-23 REQUIREMENT
Nov 21, 2023CH$797.2KEAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING
Oct 23, 2023CG$861.5KAPS-4 JAPAN WATERCRAFT / INCREMENT FUNDING TO CURRENT POP CLINS
Sep 19, 2023CF$100.0KAPS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS.
Aug 21, 2023CE$0APS-4 JAPAN WATERCRAFT / OBLIGATION OF FUNDS TO COVER NEGATIVE ULO.
Aug 8, 2023CD$3.2MAPS-4 JAPAN WATERCRAFT / DEOBLIGATION OF FY22 & F23 FUNDS. ADDITION OF INCREMENTAL FUNDING TO CURRENT POP CLINS.
Jul 27, 2023CC$1.1MAPS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION
Jul 7, 2023CB$0EAGLE APS-4 JAPAN WATERCRAFT / CAPTURE OF EXECUTED NOVATION AGREEMENT AND A REALIGNMENT OF FUNDS
Jun 20, 2023CA$1.9MEAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION.
May 26, 2023C8$0APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF THE TS-23 REQUIREMENT WHICH WAS PLACED ON CONTRACT VIA UCO ON MOD C5.
May 16, 2023C9$2.0MEAGLE APS-4 JAPAN WATERCRAFT / UCA MODIFICATION TO EXECUTE CONTRACT BRIDGE FOR A 10-MONTH PERIOD OF PERFORMANCE.
Apr 20, 2023C7$80.0KEAGLE APS-4 JAPAN WATERCRAFT / MODIFICATION TO ADD INCREMENTAL FUNDING FOR REPAIR PARTS.
Apr 6, 2023C6$0EAGLE APS-4 JAPAN WATERCRAFT. DEFINITIZE MWT WATERJET REPAIRS AND LCU MAST REPAIRS UCOS.
Mar 27, 2023C5$704.6KEAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF THE TS-23 MISSION REQUIREMENTS.
Mar 9, 2023C4$80.0KEAGLE APS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR REPAIR PARTS.
Mar 7, 2023C3$145.9KEAGLE APS-4 JAPAN WATERCRAFT - ADDITION OF THE MWT-6 WATERJET SEAL REPAIR REQUIREMENT.
Feb 13, 2023C2$3.8MAPS-4 JAPAN WATERCRAFT / EXERCISE OF OPTION PERIOD 2 UNDER THE CONTRACT BRIDGE EXTENSION / DEFINITIZATION OF OPERATION DEEP FREEZE / PLACING LCU-2032 MAST REPAIR UCO ON CONTRACT.
Jan 30, 2023C1$279.5KEAGLE APS-4 JAPAN WATERCRAFT - ADDED MISSION TO REPAIR MWT WATERJETS.
Dec 21, 2022BZ$-711.1KEAGLE APS-4 JAPAN WATERCRAFT / DEOBLIGATION AND FUNDING REALIGNMENT.
Nov 29, 2022BY$929.2KEAGLE APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION
Nov 2, 2022BX$-21.5KEAGLE APS-4 JAPAN WATERCRAFT - DEFINITIZATION OF THE LCU-2022 TURN-IN REQUIREMENT.
Oct 31, 2022BW$2.3MEAGLE APS-4 JAPAN WATERCRAFT - ADDITION OF THE OPERATION DEEP FREEZE REQUIREMENT ALONG WITH FY23 INCREMENTAL FUNDS.
Oct 13, 2022BV$1.8MEAGLE APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION TO OBLIGATE FY23 FUNDS. ALSO UPDATE CDRL AU "CD-02" AND WAWF INVOICING INSTRUCTIONS.
Sep 12, 2022BU$50.0KAPS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION
Sep 7, 2022BT$232.0KEAGLE APS-4 JAPAN WATERCRAFT - ADDITION OF PULSE-W LCU-2022 TURN-IN REQUIREMENT. ACTION IS WITHIN THE CURRENT SCOPE/PWS ON CONTRACT.
Aug 31, 2022BS$0EAGLE APS-4 JAPAN WATERCRAFT - DEFINITIZATION OF BRIDGE CONTRACT EXTENSION AND OPTION PERIOD 1.
Aug 10, 2022BR$2.4MEAGLE APS-4 JAPAN WATERCRAFT / EXERCISE OF OPTION PERIOD 1 UNDER THE BRIDGE EXTENSION CONTRACT
Jul 8, 2022BQ$0APS-4 JAPAN WATERCRAFT - LABOR/FIXED FEE REALIGNMENT.
Jun 23, 2022BP$605.1KAPS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION
May 19, 2022BN$2.3MAPS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION
May 11, 2022BM$60.0KAPS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION
May 3, 2022BL$-3.1KAPS-4 JAPAN WATERCRAFT DEOBLIGATION OF EXCESS PRIOR YEAR FUNDING.
Apr 12, 2022BK$1.1MAPS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING
Mar 21, 2022BJ$2.3MAPS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING
Mar 9, 2022BH$323.0KAPS-4 JAPAN WATERCRAFT - ADDITIONAL INCREMENTAL FUNDING.
Feb 28, 2022BG$200.0KAPS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING OF FY22 CPFF CLINS
Feb 24, 2022BF$797.0KAPS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING FOR FY22 CLINS
Feb 10, 2022BE$360.0KAPS-4 WATERCRAFT - INCREMENTAL FUNDING FOR ODC CLINS.
Jan 27, 2022BD$-863APS-4 JAPAN WATERCRAFT - DEOBLIGATION OF CANCELLING ULOS (FY17 FUNDS).
Jan 21, 2022BC$500.0KAPS-4 JAPAN - REALIGNMENT AND INCREMENTAL FUNDING
Jan 7, 2022BB$800.0KAPS-4 WATERCRAFT (JAPAN) - ADDITION OF INCREMENTAL FUNDING
Dec 28, 2021BA$-34.5KAPS-4 JAPAN / EXPIRING FUNDS DEOBLIGATIONS
Dec 14, 2021B9$800.0KAPS-4 JAPAN - INCREMENTAL FUNDING (FY22 FUNDS)
Dec 1, 2021B8$0APS-4 JAPAN / REALIGNMENT OF FUNDING
Nov 15, 2021B7$740.0KAPS-4 JAPAN - INCREMENTAL FUNDING (FY22 FUNDS) FOR BRIDGE MODIFICATION BASE PERIOD.
Nov 10, 2021B6$-10.3KAPS-4 JAPAN - MODIFICATION TO DEOBLIGATE PREVIOUS YEAR FUNDING AND CORRECT CLINS 9002AL AND 9002LA.
Oct 27, 2021B5$1.8MTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH VARIOUS CLINS TO OBLIGATE FISCAL YEAR 2022 FUNDS TO THE FOLLOWING CLINS:9002BA, 9002BB, 9002BC, 9002BE, 9003BB, 9003BD, 9003BE, 9003BF, 9003BG. THESE CLINS WILL SERVE AS CONTINUATION CLINS AND SHALL NOT BE INVOICED UNTIL THE RESPECTIVE FUNDS ON CORRESPONDING CLINS ARE EXPENDED.
Oct 4, 2021B4$0THE PURPOSE OF THIS MODIFICATION IS TO: SECTION A - ON MOD B1 CHANGE VERBIAGE FROM "THE TOTAL OBLIGATED AMOUNT OF THIS TASK ORDER IS INCREASED BY $655,374.45 FROM $90,336,358.10 TO $90,901,732.55" TO "THE TOTAL OBLIGATED AMOUNT OF THIS TASK ORDER IS INCREASED BY $655,374.45 FROM $90,336,358.10 TO$90,991,732.55." SECTION J - DELETE EXHIBIT AT CDRL CD-02 WORK BREAKDOWN BURN RATE REPORT, DATED 2019APR15 AND INCORPORATE EXHIBIT AU CDRL CD-02 WORK BREAKDOWN BURN RATE REPORT, DATED 2021MAR23.
Sep 27, 2021B3$799.7KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING ON THE FOLLOWING CLINS 9002AA AND 9002AB.
Sep 23, 2021B2$817.6KTHE PURPOSE OF THIS MODIFICATION IS TO DELETE CLIN 2002AF AND ADD FUNDS TO CLIN 9002AL,9003AN, 9003AP, AND 9002LA (CONTINUATION)
Sep 16, 202197$-1.9MDE-OBLIGATE AND RETURN EXCESS FUNDS TO THE REIMBURSABLE CUSTOMER AND REALIGN EXISTING FUNDING.
Aug 20, 2021B1$655.4KDELETE CLINS 9002AK, 9003AL, AND 9003AM AND CREATE CLINS 9002AL, 9003AN AND 9003AP
Aug 13, 202199$1.0MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS) -4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UCA FOR THE BRIDGE EXTENSION FOR APS-4 JAPAN WATERCRAFT
May 18, 202196$2.8MPROVIDE INCREMENTAL FUNDING AND INCORPORATE DEFPAC21
Apr 30, 202195$1.3MBRIDGE OP2 AND PULSE-W VALUE CORRECTION
Apr 21, 202194$176.1KINCORPORATE THE PULSE-W MISSION
Feb 16, 202193$3.8MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE POINT OF THIS MODIFICATION IS TO EXERCISE OP1 TO THE BRIDGE CONTRACT.
Jan 14, 202192$1.8MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE POINT OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING.
Jan 6, 202191$200.0KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE BRIDGE UCA.
Dec 9, 202090$375.0KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY DEFINITIZE THE BRIDGE UCA AND INCORPORATE INCREMENTAL FUNDING.
Sep 30, 202089$-179.9KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO DEOB FY15 CANCELLING FUNDS.
Sep 21, 202088$2.3MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING.
Sep 14, 202087$-330.5KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING.
Sep 2, 202086$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 86 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO UPDATE SECTION I TO INCORPORATE FEDERAL ACQUISITION REGULATION (FAR) 52.204-25 - PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT, DATED AUGUST 2020, IN ACCORDANCE WITH FAR 1.108(D).
Jul 31, 202085$2.0MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING.
Jul 21, 202084$397.1KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A UCO FOR DEFENDER PACIFIC 2020 MISSION (USARPAC).
May 31, 202083$351.3KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN.
Mar 16, 202082$6.0MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UCA #20-22 TO BRIDGE CURRENT APS-4 WATERCRAFT OPERATIONS.
Nov 19, 201981$0MAINTENANCE&SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN.THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE PULSE-W DIVESTITURE MISSION THAT WAS PLACED ON CONTRACT AS AN UCO VIA MOD 75.
Oct 31, 201980$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING.
Sep 25, 201979$4.5MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE INTENT OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING.
Aug 28, 201978$-912.1KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING AND DE-OBLIGATE EXCESS FY14 AND FY18 FUNDS.
Aug 13, 201977$1.0MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE THE OPTION TO EXTEND SERVICES.
Jul 18, 201976$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN PREVIOUSLY EXISTING FUNDING.
Jul 15, 201975$151.7KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UNPRICED CHANGE ORDER (UCO) FOR THE PACIFIC UTILITY AND LOGISTICS SUPPORT ENABLERS - WATERCRAFT (PULSE-W) DIVESTITURE MISSION.
Jun 24, 201974$1.3MMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 74 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO INCORPORATE INCREMENTAL FUNDING.
Jun 5, 201973$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING.
May 14, 201972$60.2KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 72 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO DEFINITIZE THE REPAIR OF THE BARGE DERRICK (BD-6802) THAT WAS PLACED ON CONTRACT AS AN UNPRICED CHANGE ORDER (UCO) VIA MODIFICATION 67.
Apr 18, 201971$140.7KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 71 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO INCORPORATE SUPPORT OF THE PACIFIC REACH 19 (PR-19) EXERCISE UNDER THE AUTHORITY OF FAR CLAUSE 52.243-2, CHANGES COST REIMBURSEMENT - ALTERNATE II.
Apr 10, 201970$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING.
Mar 27, 201969$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO PROCESS A REALIGNMENT OF EXISTING FUNDING IN SECTION B. THIS FUNDING REALIGNMENT WAS DOCUMENTED IN SECTION A OF MODIFICATION 68 TO THE SUBJECT TASK ORDER, BUT WAS INADVERTENTLY OMITTED FROM SECTION B.
Mar 18, 201968$-25.8KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 68 IS TO REALIGN EXISTING FUNDING AND DE-OBLIGATE EXCESS FUNDS TO BE RETURNED TO THE REIMBURSABLE CUSTOMER.
Dec 18, 201867$204.1KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UNPRICED CHANGE ORDER (UCO) FOR THE REPAIR OF THE BARGE DERRICK (BD-6802) UNDER THE AUTHORITY OF FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.243-2, CHANGES COST REIMBURSEMENT - ALTERNATE II. THE NEED FOR REPAIR OF THE BD-6802 WAS DISCOVERED DURING QUARTERLY CARE OF SUPPLIES IN STORAGE MAINTENANCE.
Nov 28, 201866$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 66 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO REALIGN EXISTING FUNDING.
Nov 15, 201865$294.5KMAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE NEGOTIATED PULSE-W 2019 MISSION INTO THE SUBJECT TASK ORDER.
Sep 10, 201864$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE NEGOTIATED ENVIRONMENTAL AND SAFETY COMPLIANCE MANAGER INTO THE TASK ORDER.
Aug 29, 201863$0THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING AMONGST PREVIOUSLY EXISTING CLINS. MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN.
Jul 31, 201862$12.0MIGF::OT::IGF EXERCISE OP4 - MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN.
Jul 23, 201861$68.3KINCORPORATION OF THE PULSE W 2018 MISSION TO APS-4 KOREA
Jun 25, 201860$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. REALIGNMENT OF PREVIOUSLY EXISTING FUNDING.
May 30, 201859$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. REALIGNMENT OF PREVIOUSLY EXISTING FUNDING.
Apr 24, 201858$0IGF::OT::IGF MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. REALIGNMENT OF PREVIOUSLY EXISTING FUNDING.
Apr 17, 201857$0IGF: :OT: :IGF APS-4 JAPAN
Apr 4, 201856$0IGF: :OT: :IGF APS-4 JAPAN
Mar 29, 201855$0IGF: :OT: :IGF
Mar 19, 201854$0IGF: :OT: :IGF APS-4 JAPAN - INCORPERATE CD-02
Feb 26, 201853$0IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT
Feb 14, 201852$0IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT
Feb 8, 201851$0IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT
Jan 22, 201850$0IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT
Dec 18, 201749$0MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. MOD: REALIGNMENT OF PREVIOUSLY EXISTING FUNDING.
Nov 21, 201748$0IGF::OT::IGF
Oct 30, 201747$0IGF::OT::IGF
Oct 11, 201746$0IGF::OT::IGF
Sep 29, 201745$2.0MIGF::OT::IGF
Sep 15, 201743$2.5MIGF::OT::IGF
Sep 15, 201744$-157.0KIGF::OT::IGF
Sep 1, 201742$0IGF::OT::IGF
Aug 10, 201740$-0IGF::OT::IGF
Aug 10, 201741$35.0KIGF::OT::IGF
Jul 20, 201739$0IGF::OT::IGF APS-4 WATERCRAFT - THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING.
Jun 29, 201738$10.0MIGF::OT::IGF
Mar 20, 201737$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING.
Mar 7, 201736$0IGF::OT::IGF THE PURPOSE OF MODIFICATION 36 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO ADMINISTRATIVELY CORRECT THE PAYMENT OFFICE CODE. THE PAYMENT OFFICE CODE WAS ERRONEOUSLY CHANGED BY DCMA ON MODIFICATION 35 TO THE SUBJECT TASK ORDER.
Mar 1, 201735$850.0KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UNPRICED CHANGE ORDER (UCO) FOR SUPPORT OF THE PACIFIC REACH 17 (PR-17) EXERCISE UNDER THE AUTHORITY OF FAR CLAUSE 52.243-2, CHANGES COST REIMBURSEMENT - ALTERNATE II.
Feb 21, 201734$-23.6KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE UNPRICED CHANGE ORDER (UCO) FOR THE PACIFIC UTILITY AND LOGISTICS SUPPORT ENABLERS - WATERCRAFT (PULSE-W) 3&4 MISSIONS THAT WAS PLACED ON CONTRACT UNDER MODIFICATION 32.
Feb 1, 201733$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACTOR'S ADDRESS AND REALIGN EXISTING FUNDING.
Dec 21, 201632$341.5KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A UCO FOR THE PULSE-W 3&4 MISSIONS. THIS MISSION IS DEEMED TO BE WITHIN SCOPE OF THE CURRENT PWS.
Nov 23, 201631$0IGF::OT::IGF REALIGNMENT OF PREVIOUSLY EXISTING FUNDING - NO CHANGE TO THE TOTAL OBLIGATED VALUE.
Nov 7, 201630$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDS, THERE WILL BE NO CHANGE TO THE TOTAL OBLIGATED AMOUNT OF THE TASK ORDER.
Oct 6, 201628$0IGF::OT::IGF REALIGNMENT OF EXISTING FUNDING, NO CHANGE TO OBLIGATED VALUE.
Oct 6, 201629$0IGF::OT::IGF
Sep 22, 201627$0IGF::OT::IGF REALIGNMENT OF EXISTING FUNDS - NO CHANGE TO TOTAL OBLIGATION.
Sep 16, 201626$11.4MIGF::OT::IGF EXERCISE OP2, CARRY FORWARD OP1 CAPGAP INTO OP2, DEFINITIZE C4ISR UCO, AND ADD BUILDING 500 STORAGE FACILITY MISSION.
Sep 9, 201625$0IGF::OT::IGF REALIGNMENT OF EXISTING FUNDING - NO CHANGE TO OBLIGATED AMOUNT.
Aug 31, 201624$0IGF::OT::IGF REALIGNMENT OF FUNDING BETWEEN TWO EXISTING CLINS.
Aug 3, 201623$0IGF::OT::IGF PURPOSE IS TO REALIGN EXISTING FUNDING AMONGST TWO CLINS. NO CHANGE IN OBLIGATED AMOUNT.
Jul 29, 201622$53.8KIGF::OT::IGF INCORPORATE A UCO FOR THE C4ISR MODERNIZATION PROJECT.
May 19, 201621$0IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING TO PROVIDE ADDED SUPPORT FOR PURCHASE OF GFE.
Mar 30, 201620$0IGF::OT::IGF ARMY PRE-POSITIONED STOCKS-4, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING TO PROVIDE ADDED SUPORT FOR PURCHASE OF REPAIR PARTS, TRAVEL ODCS AND MISC ODCS.
Mar 8, 201619$0IGF::OT::IGF ARMY PRE-POSITIONED STOCKS-4, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR ASSOCIATED WITH THE UNIT OF MEASURE (U/I) ON FOUR CLINS. THE U/I CALLED OUT AS LT SHOULD HAVE BEEN LO.
Feb 9, 201618$0IGF::OT::IGF ARMY PRE-POSITIONED STOCKS-4, JAPAN. THE PURPOSE OF THIS MOD IS TO REALIGN FUNDING TO SUPPORT PURCHASES OF GFE AND REPAIR PARTS.
Jan 28, 201617$1.4MIGF::OT::IGF
Jan 19, 201616$0IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING ON OPTION YEAR ONE CLINS.
Jan 6, 201615$0IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING ON OPTION YEAR ONE CLINS.
Dec 16, 201514$225.0KIGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND EXTEND THE PERIOD OF PERFORMANCE FOR CLINS 0002AC AND 0003AA.
Nov 10, 201513$225.0KIGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO ACCEPT MLL'S CAP-GAP PROPOSAL AND REALIGN BY FUNDING ON TWO CLINS.
Oct 15, 201512$0IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT -- PURPOSE OF THIS MOD IS TO DELETE CLIN 0004AJ AND ESTABLISH AND FUND CLIN 1004AJ.
Sep 18, 201511$1.0MIGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO REPROGRAM UNUSED FUNDS FOR THE CJLOTS-15 MISSION.
Sep 16, 201510$-704.9KIGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO DEOBLIGATE FUNDS FROM THE CJLOTS CLIN.
Sep 9, 20159$0IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO REALIGN FUNDING.
Jul 30, 20158$8.9MIGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO AWARD OPTION PERIOD ONE (OP1). OP1 WAS EVALUATED AT TIME OF BASIC AWARD.
Jun 29, 20157$0IGF::OT::IGF CARE OF SUPPLIES IN STORAGE (COSIS) SERVICES IN YOKOHAMA, JAPAN. THE PURPOSE OF MOD 07 IS TO REALIGN FUNDING.
Jun 3, 20156$0IGF::OT::IGF CARE OF SUPPLIES IN STORAGE SERVICES AT YOKOHAMA NORTH DOCK, YOKOHAMA, JAPAN. THE PURPOSE OF THIS MOD IS TO INCORPORATE THE ACC-RI CONTRACTING POC ATTACHMENT 2015 V1 DOCUMENT.
May 6, 20155$800.0KIGF::OT::IGF MOD 05 IS FOR AWARD OF THE COMBINED JOINT LOGISTICS OVER THE SHORE (CJLOTS) MISSION. ESTABLISHED AND PARTIALLY FUNDED CLIN 0002AJ. FUNDING = $800,000.00.
Apr 14, 20154$0IGF::OT::IGF REALIGNMENT OF FUNDING FROM CLIN 0001AB TO CLINS 0002AC, 0002AE, 0003AA, AND 0003AB.
Mar 31, 20153$235.5KIGF::OT::IGF PURPOSE OF MOD IS TO ACCEPT MLL'S PROPOSAL FOR THE PULSE-W2&W3 MISSIONS. NEW CLINS 0002AG-PULSE-W2 AND 0002AH-PULSE-W3 ESTABLISHED AND FUNDED. TOTAL VALUE OF ACTION = $$235,539.39.
Jan 29, 20152$0IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT 1. ADDITION AND DELETION OF CLAUSES 2. REALIGNMENT OF FUNDING
Sep 23, 20141$0IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2027-06-01 (219 days from calculation)
+35 points
3 historical awards in this buyer and category group
+10 points
201 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.