Federal contract award
0001
IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RI |
| NAICS | 561210 — Facilities Support Services |
| PSC | R799 — Other Management Support Services |
| Parent award / vehicle | W52P1J14G0023 |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $175.9M |
| Current contract value | $194.3M |
| Potential contract value / ceiling | $207.1M |
| Start date | Sep 18, 2014 |
| Current end date | Jun 1, 2027 |
| Potential end date | Jun 1, 2027 |
| Latest award activity | May 29, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 201 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | E3 | $0 | EAGLE APS-4 JAPAN WATERCRAFT / EXTENSION OF TS-23 PONTOON REPAIR CLINS |
| May 29, 2026 | E2 | $2.2M | EAGLE APS-4 JAPAN WATERCRAFT / EXTENSION OF ODF26 AND TS23 CLINS INTO BRIDGE POP |
| May 14, 2026 | DZ | $0 | APS-4 JAPAN WATERCRAFT / EXTEND TS-23 CLINS |
| May 14, 2026 | E1 | $5.3M | EAGLE APS-4 JAPAN WATERCRAFT / CONTRACT BRIDGE EXTENSION AND ADDITION OF CJLOTS EXERCISE |
| Mar 25, 2026 | DY | $-2.2M | EAGLE APS-4 JAPAN WATERCRAFT / DEOBLIGATION MODIFICATION |
| Mar 5, 2026 | DX | $0 | APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF ODF26 AND FUNDING REALIGNMENTS. |
| Jan 28, 2026 | DW | $2.7M | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION |
| Dec 22, 2025 | DV | $1.7M | APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MOD |
| Dec 10, 2025 | DU | $2.9M | FUNDING MODIFICATION |
| Dec 3, 2025 | DS | $564.3K | EAGLE APS-4 JAPAN WATERCRAFT / CREATING OPERATION DEEP FREEZE 2026 CLINS AND FULLY FUNDING UCO. |
| Dec 3, 2025 | DT | $-22.1K | EAGLE APS-4 JAPAN WATERCRAFT / DELETING OLD ODF 2026 CLINS |
| Nov 19, 2025 | DR | $1.5M | EAGLE APS-4 JAPAN WATERCRAFT / EXERCISE OPTION PERIOD 2 AND OBLIGATE INCREMENTAL FUNDING |
| Nov 14, 2025 | DQ | $22.1K | APS-4 JAPAN WATERCRAFT / ADDITION OF OPERATION DEEP FREEZE REQUIREMENT VIA UCO |
| Oct 1, 2025 | DP | $0 | EAGLE APS-4 JAPAN WATERCRAFT / REALIGNMENT OF FUNDS |
| Sep 17, 2025 | DN | $1.6M | APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING TO FULLY FUND CURRENT OPTION PERIOD. |
| Aug 27, 2025 | DM | $6.0K | EAGLE APS-4 JAPAN WATERCRAFT / REALIGNMENT OF FUNDS BASED ON CONTRACTOR'S REQUEST AND ADDITION OF INCREMENTAL FUNDING FOR OPERATION DEEP FREEZE FOR THE ORDERING OF REPAIR PARTS. |
| Aug 20, 2025 | DL | $260.0K | APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION |
| Jul 22, 2025 | DK | $3.4M | APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION |
| Jun 26, 2025 | DJ | $1.5M | EAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING |
| Jun 12, 2025 | DH | $663.2K | EAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING |
| Jun 10, 2025 | DG | $2.8M | EAGLE APS-4 JAPAN WATERCRAFT / ADDING FUNDING FOR TS-23 PONTOON REPAIRS |
| May 7, 2025 | DF | $-50.0K | EAGLE APS-4 JAPAN WATERCRAFT / FUNDING REALIGNMENT AND DEOBLIGATION OF FUNDS TO ORDER PARTS DIRECTED FROM G-ARMY. |
| Apr 17, 2025 | DE | $835.0K | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION |
| Apr 8, 2025 | DD | $0 | EAGLE APS-4 JAPAN WATERCRAFT - UPDATING OF PWS, WORKLOAD DOCUMENTS, TECHNICAL EXHIBITS, CDRLS AND REALIGNMENT OF FUNDS. |
| Mar 6, 2025 | DC | $0 | EAGLE APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF OPERATION DEEP FREEZE MISSION REQUIREMENT. |
| Mar 4, 2025 | DB | $-161.1K | EAGLE APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF DEFPAC-20 REQUIREMENT AND REMOVE EXCESS FUNDING. |
| Feb 19, 2025 | DA | $1.8M | APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING AND ADDING DFARS CLAUSE 252.245-7005 |
| Nov 26, 2024 | D9 | $6.2M | EAGLE APS-4 JAPAN WATERCRAFT INCREMENTAL FUNDING AND CD-02 UPDATE. |
| Nov 14, 2024 | D8 | $750.0K | APS-4 JAPAN WATERCRAFT / ADDITION OF OPERATION DEEP FREEZE REQUIREMENT VIA UCO |
| Nov 5, 2024 | D7 | $1.3M | APS-4 JAPAN WATERCRAFT / EXERCISE OPTION PERIOD 1 |
| Oct 9, 2024 | D6 | $0 | EAGLE ASP-2 JAPAN WATERCRAFT REALIGNMENT OF FUNDS FROM CLINS 9403AG TO 9403AE. |
| Sep 19, 2024 | D5 | $1.9M | TO ADD INCREMENTAL FUNDING TO CURRENT YEAR CLINS. |
| Sep 4, 2024 | D4 | $115.0K | TO INCREMENTALLY FUND CLIN 9402AC. |
| Sep 3, 2024 | D3 | $-762.8K | TO DEOBLIGATE FY 23 AND FY 24 EXCESS FUNDING. |
| Aug 15, 2024 | D2 | $1.0M | APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF 8-MONTH UCA EXTENSION. |
| Aug 1, 2024 | D1 | $0 | APS-4 JAPAN WATERCRAFT TO INCORPORATE DFARS CLAUSE 252.245-7005 MANAGEMENT AND REPORTING OF GOVERNMENT PROPERTY INTO W52P1J-14-G-0023 0001. |
| Jul 15, 2024 | CZ | $2.7M | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING. |
| Jun 17, 2024 | CY | $1.9M | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING. |
| Jun 7, 2024 | CX | $0 | EAGLE ASP-4 JAPAN WATERCRAFT / FUNDING REALIGNMENT. |
| Jun 5, 2024 | CW | $0 | EAGLE APS-4 JAPAN WATERCRAFT/ INCREASE IN CONTRACT VALUE AND CHANGE OF CLIN 9404AB FROM A COST CLIN TO A CPFF CLIN. |
| May 21, 2024 | CV | $889.0K | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING FFP CLINS. |
| May 6, 2024 | CU | $-2.5M | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING TS-23, CLIN FUNDING REALIGNMENT, AND PRIOR FISCAL YEAR DEOBLIGATIONS. |
| Apr 25, 2024 | CT | $1.0M | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING. |
| Apr 12, 2024 | CS | $1.0M | APS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS. |
| Mar 28, 2024 | CR | $1.6M | APS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS AND ADDITIONAL CLIN FUNDING. |
| Mar 18, 2024 | CQ | $200.0K | APS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS, CLIN RENUMBERING, AND CHANGES TO PWS. |
| Mar 13, 2024 | CP | $600.0K | EAGLE APS-4 JAPAN WATERCRAFT / UCA MODIFICATION TO EXECUTE CONTRACT BRIDGE FOR AN 8-MONTH PERIOD OF PERFORMANCE. |
| Feb 13, 2024 | CN | $1.6M | EAGLE APS-4 JAPAN WATERCRAFT / FUNDING REALIGNMENT AND INCREMENTAL FUNDING |
| Jan 30, 2024 | CM | $945.5K | APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF 10-MONTH UCA EXTENSION. |
| Jan 17, 2024 | CL | $169.1K | APS-4 JAPAN WATERCRAFT - ADDITION OF LCU-2032 BOW THRUSTER REPAIR REQUIREMENT |
| Dec 18, 2023 | CK | $903.5K | EAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING |
| Dec 7, 2023 | CJ | $0 | APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF TS-23 REQUIREMENT |
| Nov 21, 2023 | CH | $797.2K | EAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF INCREMENTAL FUNDING |
| Oct 23, 2023 | CG | $861.5K | APS-4 JAPAN WATERCRAFT / INCREMENT FUNDING TO CURRENT POP CLINS |
| Sep 19, 2023 | CF | $100.0K | APS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR TS-23 REPAIR PARTS. |
| Aug 21, 2023 | CE | $0 | APS-4 JAPAN WATERCRAFT / OBLIGATION OF FUNDS TO COVER NEGATIVE ULO. |
| Aug 8, 2023 | CD | $3.2M | APS-4 JAPAN WATERCRAFT / DEOBLIGATION OF FY22 & F23 FUNDS. ADDITION OF INCREMENTAL FUNDING TO CURRENT POP CLINS. |
| Jul 27, 2023 | CC | $1.1M | APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION |
| Jul 7, 2023 | CB | $0 | EAGLE APS-4 JAPAN WATERCRAFT / CAPTURE OF EXECUTED NOVATION AGREEMENT AND A REALIGNMENT OF FUNDS |
| Jun 20, 2023 | CA | $1.9M | EAGLE APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION. |
| May 26, 2023 | C8 | $0 | APS-4 JAPAN WATERCRAFT / DEFINITIZATION OF THE TS-23 REQUIREMENT WHICH WAS PLACED ON CONTRACT VIA UCO ON MOD C5. |
| May 16, 2023 | C9 | $2.0M | EAGLE APS-4 JAPAN WATERCRAFT / UCA MODIFICATION TO EXECUTE CONTRACT BRIDGE FOR A 10-MONTH PERIOD OF PERFORMANCE. |
| Apr 20, 2023 | C7 | $80.0K | EAGLE APS-4 JAPAN WATERCRAFT / MODIFICATION TO ADD INCREMENTAL FUNDING FOR REPAIR PARTS. |
| Apr 6, 2023 | C6 | $0 | EAGLE APS-4 JAPAN WATERCRAFT. DEFINITIZE MWT WATERJET REPAIRS AND LCU MAST REPAIRS UCOS. |
| Mar 27, 2023 | C5 | $704.6K | EAGLE APS-4 JAPAN WATERCRAFT / ADDITION OF THE TS-23 MISSION REQUIREMENTS. |
| Mar 9, 2023 | C4 | $80.0K | EAGLE APS-4 JAPAN WATERCRAFT / ADDITIONAL FUNDING FOR REPAIR PARTS. |
| Mar 7, 2023 | C3 | $145.9K | EAGLE APS-4 JAPAN WATERCRAFT - ADDITION OF THE MWT-6 WATERJET SEAL REPAIR REQUIREMENT. |
| Feb 13, 2023 | C2 | $3.8M | APS-4 JAPAN WATERCRAFT / EXERCISE OF OPTION PERIOD 2 UNDER THE CONTRACT BRIDGE EXTENSION / DEFINITIZATION OF OPERATION DEEP FREEZE / PLACING LCU-2032 MAST REPAIR UCO ON CONTRACT. |
| Jan 30, 2023 | C1 | $279.5K | EAGLE APS-4 JAPAN WATERCRAFT - ADDED MISSION TO REPAIR MWT WATERJETS. |
| Dec 21, 2022 | BZ | $-711.1K | EAGLE APS-4 JAPAN WATERCRAFT / DEOBLIGATION AND FUNDING REALIGNMENT. |
| Nov 29, 2022 | BY | $929.2K | EAGLE APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION |
| Nov 2, 2022 | BX | $-21.5K | EAGLE APS-4 JAPAN WATERCRAFT - DEFINITIZATION OF THE LCU-2022 TURN-IN REQUIREMENT. |
| Oct 31, 2022 | BW | $2.3M | EAGLE APS-4 JAPAN WATERCRAFT - ADDITION OF THE OPERATION DEEP FREEZE REQUIREMENT ALONG WITH FY23 INCREMENTAL FUNDS. |
| Oct 13, 2022 | BV | $1.8M | EAGLE APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION TO OBLIGATE FY23 FUNDS. ALSO UPDATE CDRL AU "CD-02" AND WAWF INVOICING INSTRUCTIONS. |
| Sep 12, 2022 | BU | $50.0K | APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION |
| Sep 7, 2022 | BT | $232.0K | EAGLE APS-4 JAPAN WATERCRAFT - ADDITION OF PULSE-W LCU-2022 TURN-IN REQUIREMENT. ACTION IS WITHIN THE CURRENT SCOPE/PWS ON CONTRACT. |
| Aug 31, 2022 | BS | $0 | EAGLE APS-4 JAPAN WATERCRAFT - DEFINITIZATION OF BRIDGE CONTRACT EXTENSION AND OPTION PERIOD 1. |
| Aug 10, 2022 | BR | $2.4M | EAGLE APS-4 JAPAN WATERCRAFT / EXERCISE OF OPTION PERIOD 1 UNDER THE BRIDGE EXTENSION CONTRACT |
| Jul 8, 2022 | BQ | $0 | APS-4 JAPAN WATERCRAFT - LABOR/FIXED FEE REALIGNMENT. |
| Jun 23, 2022 | BP | $605.1K | APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION |
| May 19, 2022 | BN | $2.3M | APS-4 JAPAN WATERCRAFT / INCREMENTAL FUNDING MODIFICATION |
| May 11, 2022 | BM | $60.0K | APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING MODIFICATION |
| May 3, 2022 | BL | $-3.1K | APS-4 JAPAN WATERCRAFT DEOBLIGATION OF EXCESS PRIOR YEAR FUNDING. |
| Apr 12, 2022 | BK | $1.1M | APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING |
| Mar 21, 2022 | BJ | $2.3M | APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING |
| Mar 9, 2022 | BH | $323.0K | APS-4 JAPAN WATERCRAFT - ADDITIONAL INCREMENTAL FUNDING. |
| Feb 28, 2022 | BG | $200.0K | APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING OF FY22 CPFF CLINS |
| Feb 24, 2022 | BF | $797.0K | APS-4 JAPAN WATERCRAFT - INCREMENTAL FUNDING FOR FY22 CLINS |
| Feb 10, 2022 | BE | $360.0K | APS-4 WATERCRAFT - INCREMENTAL FUNDING FOR ODC CLINS. |
| Jan 27, 2022 | BD | $-863 | APS-4 JAPAN WATERCRAFT - DEOBLIGATION OF CANCELLING ULOS (FY17 FUNDS). |
| Jan 21, 2022 | BC | $500.0K | APS-4 JAPAN - REALIGNMENT AND INCREMENTAL FUNDING |
| Jan 7, 2022 | BB | $800.0K | APS-4 WATERCRAFT (JAPAN) - ADDITION OF INCREMENTAL FUNDING |
| Dec 28, 2021 | BA | $-34.5K | APS-4 JAPAN / EXPIRING FUNDS DEOBLIGATIONS |
| Dec 14, 2021 | B9 | $800.0K | APS-4 JAPAN - INCREMENTAL FUNDING (FY22 FUNDS) |
| Dec 1, 2021 | B8 | $0 | APS-4 JAPAN / REALIGNMENT OF FUNDING |
| Nov 15, 2021 | B7 | $740.0K | APS-4 JAPAN - INCREMENTAL FUNDING (FY22 FUNDS) FOR BRIDGE MODIFICATION BASE PERIOD. |
| Nov 10, 2021 | B6 | $-10.3K | APS-4 JAPAN - MODIFICATION TO DEOBLIGATE PREVIOUS YEAR FUNDING AND CORRECT CLINS 9002AL AND 9002LA. |
| Oct 27, 2021 | B5 | $1.8M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH VARIOUS CLINS TO OBLIGATE FISCAL YEAR 2022 FUNDS TO THE FOLLOWING CLINS:9002BA, 9002BB, 9002BC, 9002BE, 9003BB, 9003BD, 9003BE, 9003BF, 9003BG. THESE CLINS WILL SERVE AS CONTINUATION CLINS AND SHALL NOT BE INVOICED UNTIL THE RESPECTIVE FUNDS ON CORRESPONDING CLINS ARE EXPENDED. |
| Oct 4, 2021 | B4 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: SECTION A - ON MOD B1 CHANGE VERBIAGE FROM "THE TOTAL OBLIGATED AMOUNT OF THIS TASK ORDER IS INCREASED BY $655,374.45 FROM $90,336,358.10 TO $90,901,732.55" TO "THE TOTAL OBLIGATED AMOUNT OF THIS TASK ORDER IS INCREASED BY $655,374.45 FROM $90,336,358.10 TO$90,991,732.55." SECTION J - DELETE EXHIBIT AT CDRL CD-02 WORK BREAKDOWN BURN RATE REPORT, DATED 2019APR15 AND INCORPORATE EXHIBIT AU CDRL CD-02 WORK BREAKDOWN BURN RATE REPORT, DATED 2021MAR23. |
| Sep 27, 2021 | B3 | $799.7K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING ON THE FOLLOWING CLINS 9002AA AND 9002AB. |
| Sep 23, 2021 | B2 | $817.6K | THE PURPOSE OF THIS MODIFICATION IS TO DELETE CLIN 2002AF AND ADD FUNDS TO CLIN 9002AL,9003AN, 9003AP, AND 9002LA (CONTINUATION) |
| Sep 16, 2021 | 97 | $-1.9M | DE-OBLIGATE AND RETURN EXCESS FUNDS TO THE REIMBURSABLE CUSTOMER AND REALIGN EXISTING FUNDING. |
| Aug 20, 2021 | B1 | $655.4K | DELETE CLINS 9002AK, 9003AL, AND 9003AM AND CREATE CLINS 9002AL, 9003AN AND 9003AP |
| Aug 13, 2021 | 99 | $1.0M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS) -4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UCA FOR THE BRIDGE EXTENSION FOR APS-4 JAPAN WATERCRAFT |
| May 18, 2021 | 96 | $2.8M | PROVIDE INCREMENTAL FUNDING AND INCORPORATE DEFPAC21 |
| Apr 30, 2021 | 95 | $1.3M | BRIDGE OP2 AND PULSE-W VALUE CORRECTION |
| Apr 21, 2021 | 94 | $176.1K | INCORPORATE THE PULSE-W MISSION |
| Feb 16, 2021 | 93 | $3.8M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE POINT OF THIS MODIFICATION IS TO EXERCISE OP1 TO THE BRIDGE CONTRACT. |
| Jan 14, 2021 | 92 | $1.8M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE POINT OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING. |
| Jan 6, 2021 | 91 | $200.0K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE BRIDGE UCA. |
| Dec 9, 2020 | 90 | $375.0K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY DEFINITIZE THE BRIDGE UCA AND INCORPORATE INCREMENTAL FUNDING. |
| Sep 30, 2020 | 89 | $-179.9K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO DEOB FY15 CANCELLING FUNDS. |
| Sep 21, 2020 | 88 | $2.3M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING. |
| Sep 14, 2020 | 87 | $-330.5K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING. |
| Sep 2, 2020 | 86 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 86 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO UPDATE SECTION I TO INCORPORATE FEDERAL ACQUISITION REGULATION (FAR) 52.204-25 - PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT, DATED AUGUST 2020, IN ACCORDANCE WITH FAR 1.108(D). |
| Jul 31, 2020 | 85 | $2.0M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING. |
| Jul 21, 2020 | 84 | $397.1K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A UCO FOR DEFENDER PACIFIC 2020 MISSION (USARPAC). |
| May 31, 2020 | 83 | $351.3K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. |
| Mar 16, 2020 | 82 | $6.0M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UCA #20-22 TO BRIDGE CURRENT APS-4 WATERCRAFT OPERATIONS. |
| Nov 19, 2019 | 81 | $0 | MAINTENANCE&SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN.THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE PULSE-W DIVESTITURE MISSION THAT WAS PLACED ON CONTRACT AS AN UCO VIA MOD 75. |
| Oct 31, 2019 | 80 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING. |
| Sep 25, 2019 | 79 | $4.5M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE INTENT OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING. |
| Aug 28, 2019 | 78 | $-912.1K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING AND DE-OBLIGATE EXCESS FY14 AND FY18 FUNDS. |
| Aug 13, 2019 | 77 | $1.0M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE THE OPTION TO EXTEND SERVICES. |
| Jul 18, 2019 | 76 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN PREVIOUSLY EXISTING FUNDING. |
| Jul 15, 2019 | 75 | $151.7K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UNPRICED CHANGE ORDER (UCO) FOR THE PACIFIC UTILITY AND LOGISTICS SUPPORT ENABLERS - WATERCRAFT (PULSE-W) DIVESTITURE MISSION. |
| Jun 24, 2019 | 74 | $1.3M | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 74 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO INCORPORATE INCREMENTAL FUNDING. |
| Jun 5, 2019 | 73 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING. |
| May 14, 2019 | 72 | $60.2K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 72 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO DEFINITIZE THE REPAIR OF THE BARGE DERRICK (BD-6802) THAT WAS PLACED ON CONTRACT AS AN UNPRICED CHANGE ORDER (UCO) VIA MODIFICATION 67. |
| Apr 18, 2019 | 71 | $140.7K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 71 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO INCORPORATE SUPPORT OF THE PACIFIC REACH 19 (PR-19) EXERCISE UNDER THE AUTHORITY OF FAR CLAUSE 52.243-2, CHANGES COST REIMBURSEMENT - ALTERNATE II. |
| Apr 10, 2019 | 70 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING. |
| Mar 27, 2019 | 69 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO PROCESS A REALIGNMENT OF EXISTING FUNDING IN SECTION B. THIS FUNDING REALIGNMENT WAS DOCUMENTED IN SECTION A OF MODIFICATION 68 TO THE SUBJECT TASK ORDER, BUT WAS INADVERTENTLY OMITTED FROM SECTION B. |
| Mar 18, 2019 | 68 | $-25.8K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 68 IS TO REALIGN EXISTING FUNDING AND DE-OBLIGATE EXCESS FUNDS TO BE RETURNED TO THE REIMBURSABLE CUSTOMER. |
| Dec 18, 2018 | 67 | $204.1K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UNPRICED CHANGE ORDER (UCO) FOR THE REPAIR OF THE BARGE DERRICK (BD-6802) UNDER THE AUTHORITY OF FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.243-2, CHANGES COST REIMBURSEMENT - ALTERNATE II. THE NEED FOR REPAIR OF THE BD-6802 WAS DISCOVERED DURING QUARTERLY CARE OF SUPPLIES IN STORAGE MAINTENANCE. |
| Nov 28, 2018 | 66 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF MODIFICATION 66 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO REALIGN EXISTING FUNDING. |
| Nov 15, 2018 | 65 | $294.5K | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE NEGOTIATED PULSE-W 2019 MISSION INTO THE SUBJECT TASK ORDER. |
| Sep 10, 2018 | 64 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE NEGOTIATED ENVIRONMENTAL AND SAFETY COMPLIANCE MANAGER INTO THE TASK ORDER. |
| Aug 29, 2018 | 63 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING AMONGST PREVIOUSLY EXISTING CLINS. MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. |
| Jul 31, 2018 | 62 | $12.0M | IGF::OT::IGF EXERCISE OP4 - MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. |
| Jul 23, 2018 | 61 | $68.3K | INCORPORATION OF THE PULSE W 2018 MISSION TO APS-4 KOREA |
| Jun 25, 2018 | 60 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. REALIGNMENT OF PREVIOUSLY EXISTING FUNDING. |
| May 30, 2018 | 59 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. REALIGNMENT OF PREVIOUSLY EXISTING FUNDING. |
| Apr 24, 2018 | 58 | $0 | IGF::OT::IGF MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. REALIGNMENT OF PREVIOUSLY EXISTING FUNDING. |
| Apr 17, 2018 | 57 | $0 | IGF: :OT: :IGF APS-4 JAPAN |
| Apr 4, 2018 | 56 | $0 | IGF: :OT: :IGF APS-4 JAPAN |
| Mar 29, 2018 | 55 | $0 | IGF: :OT: :IGF |
| Mar 19, 2018 | 54 | $0 | IGF: :OT: :IGF APS-4 JAPAN - INCORPERATE CD-02 |
| Feb 26, 2018 | 53 | $0 | IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT |
| Feb 14, 2018 | 52 | $0 | IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT |
| Feb 8, 2018 | 51 | $0 | IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT |
| Jan 22, 2018 | 50 | $0 | IGF: :OT: :IGF APS-4 JAPAN - FUNDING REALIGNMENT |
| Dec 18, 2017 | 49 | $0 | MAINTENANCE AND SUPPLY FUNCTIONS IN SUPPORT OF ARMY PREPOSITIONED STOCK (APS)-4 WATERCRAFT IN NORTH DOCK YOKOHAMA, JAPAN. MOD: REALIGNMENT OF PREVIOUSLY EXISTING FUNDING. |
| Nov 21, 2017 | 48 | $0 | IGF::OT::IGF |
| Oct 30, 2017 | 47 | $0 | IGF::OT::IGF |
| Oct 11, 2017 | 46 | $0 | IGF::OT::IGF |
| Sep 29, 2017 | 45 | $2.0M | IGF::OT::IGF |
| Sep 15, 2017 | 43 | $2.5M | IGF::OT::IGF |
| Sep 15, 2017 | 44 | $-157.0K | IGF::OT::IGF |
| Sep 1, 2017 | 42 | $0 | IGF::OT::IGF |
| Aug 10, 2017 | 40 | $-0 | IGF::OT::IGF |
| Aug 10, 2017 | 41 | $35.0K | IGF::OT::IGF |
| Jul 20, 2017 | 39 | $0 | IGF::OT::IGF APS-4 WATERCRAFT - THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING. |
| Jun 29, 2017 | 38 | $10.0M | IGF::OT::IGF |
| Mar 20, 2017 | 37 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDING. |
| Mar 7, 2017 | 36 | $0 | IGF::OT::IGF THE PURPOSE OF MODIFICATION 36 TO CONTRACT W52P1J-14-G-0023, TASK ORDER 0001 IS TO ADMINISTRATIVELY CORRECT THE PAYMENT OFFICE CODE. THE PAYMENT OFFICE CODE WAS ERRONEOUSLY CHANGED BY DCMA ON MODIFICATION 35 TO THE SUBJECT TASK ORDER. |
| Mar 1, 2017 | 35 | $850.0K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UNPRICED CHANGE ORDER (UCO) FOR SUPPORT OF THE PACIFIC REACH 17 (PR-17) EXERCISE UNDER THE AUTHORITY OF FAR CLAUSE 52.243-2, CHANGES COST REIMBURSEMENT - ALTERNATE II. |
| Feb 21, 2017 | 34 | $-23.6K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE UNPRICED CHANGE ORDER (UCO) FOR THE PACIFIC UTILITY AND LOGISTICS SUPPORT ENABLERS - WATERCRAFT (PULSE-W) 3&4 MISSIONS THAT WAS PLACED ON CONTRACT UNDER MODIFICATION 32. |
| Feb 1, 2017 | 33 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACTOR'S ADDRESS AND REALIGN EXISTING FUNDING. |
| Dec 21, 2016 | 32 | $341.5K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A UCO FOR THE PULSE-W 3&4 MISSIONS. THIS MISSION IS DEEMED TO BE WITHIN SCOPE OF THE CURRENT PWS. |
| Nov 23, 2016 | 31 | $0 | IGF::OT::IGF REALIGNMENT OF PREVIOUSLY EXISTING FUNDING - NO CHANGE TO THE TOTAL OBLIGATED VALUE. |
| Nov 7, 2016 | 30 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING FUNDS, THERE WILL BE NO CHANGE TO THE TOTAL OBLIGATED AMOUNT OF THE TASK ORDER. |
| Oct 6, 2016 | 28 | $0 | IGF::OT::IGF REALIGNMENT OF EXISTING FUNDING, NO CHANGE TO OBLIGATED VALUE. |
| Oct 6, 2016 | 29 | $0 | IGF::OT::IGF |
| Sep 22, 2016 | 27 | $0 | IGF::OT::IGF REALIGNMENT OF EXISTING FUNDS - NO CHANGE TO TOTAL OBLIGATION. |
| Sep 16, 2016 | 26 | $11.4M | IGF::OT::IGF EXERCISE OP2, CARRY FORWARD OP1 CAPGAP INTO OP2, DEFINITIZE C4ISR UCO, AND ADD BUILDING 500 STORAGE FACILITY MISSION. |
| Sep 9, 2016 | 25 | $0 | IGF::OT::IGF REALIGNMENT OF EXISTING FUNDING - NO CHANGE TO OBLIGATED AMOUNT. |
| Aug 31, 2016 | 24 | $0 | IGF::OT::IGF REALIGNMENT OF FUNDING BETWEEN TWO EXISTING CLINS. |
| Aug 3, 2016 | 23 | $0 | IGF::OT::IGF PURPOSE IS TO REALIGN EXISTING FUNDING AMONGST TWO CLINS. NO CHANGE IN OBLIGATED AMOUNT. |
| Jul 29, 2016 | 22 | $53.8K | IGF::OT::IGF INCORPORATE A UCO FOR THE C4ISR MODERNIZATION PROJECT. |
| May 19, 2016 | 21 | $0 | IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING TO PROVIDE ADDED SUPPORT FOR PURCHASE OF GFE. |
| Mar 30, 2016 | 20 | $0 | IGF::OT::IGF ARMY PRE-POSITIONED STOCKS-4, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING TO PROVIDE ADDED SUPORT FOR PURCHASE OF REPAIR PARTS, TRAVEL ODCS AND MISC ODCS. |
| Mar 8, 2016 | 19 | $0 | IGF::OT::IGF ARMY PRE-POSITIONED STOCKS-4, JAPAN. THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR ASSOCIATED WITH THE UNIT OF MEASURE (U/I) ON FOUR CLINS. THE U/I CALLED OUT AS LT SHOULD HAVE BEEN LO. |
| Feb 9, 2016 | 18 | $0 | IGF::OT::IGF ARMY PRE-POSITIONED STOCKS-4, JAPAN. THE PURPOSE OF THIS MOD IS TO REALIGN FUNDING TO SUPPORT PURCHASES OF GFE AND REPAIR PARTS. |
| Jan 28, 2016 | 17 | $1.4M | IGF::OT::IGF |
| Jan 19, 2016 | 16 | $0 | IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING ON OPTION YEAR ONE CLINS. |
| Jan 6, 2016 | 15 | $0 | IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING ON OPTION YEAR ONE CLINS. |
| Dec 16, 2015 | 14 | $225.0K | IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND EXTEND THE PERIOD OF PERFORMANCE FOR CLINS 0002AC AND 0003AA. |
| Nov 10, 2015 | 13 | $225.0K | IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MODIFICATION IS TO ACCEPT MLL'S CAP-GAP PROPOSAL AND REALIGN BY FUNDING ON TWO CLINS. |
| Oct 15, 2015 | 12 | $0 | IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT -- PURPOSE OF THIS MOD IS TO DELETE CLIN 0004AJ AND ESTABLISH AND FUND CLIN 1004AJ. |
| Sep 18, 2015 | 11 | $1.0M | IGF::OT::IGF ARMY PREPOSITIONED STOCK (APS)-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO REPROGRAM UNUSED FUNDS FOR THE CJLOTS-15 MISSION. |
| Sep 16, 2015 | 10 | $-704.9K | IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO DEOBLIGATE FUNDS FROM THE CJLOTS CLIN. |
| Sep 9, 2015 | 9 | $0 | IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO REALIGN FUNDING. |
| Jul 30, 2015 | 8 | $8.9M | IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT - PURPOSE OF THIS MOD IS TO AWARD OPTION PERIOD ONE (OP1). OP1 WAS EVALUATED AT TIME OF BASIC AWARD. |
| Jun 29, 2015 | 7 | $0 | IGF::OT::IGF CARE OF SUPPLIES IN STORAGE (COSIS) SERVICES IN YOKOHAMA, JAPAN. THE PURPOSE OF MOD 07 IS TO REALIGN FUNDING. |
| Jun 3, 2015 | 6 | $0 | IGF::OT::IGF CARE OF SUPPLIES IN STORAGE SERVICES AT YOKOHAMA NORTH DOCK, YOKOHAMA, JAPAN. THE PURPOSE OF THIS MOD IS TO INCORPORATE THE ACC-RI CONTRACTING POC ATTACHMENT 2015 V1 DOCUMENT. |
| May 6, 2015 | 5 | $800.0K | IGF::OT::IGF MOD 05 IS FOR AWARD OF THE COMBINED JOINT LOGISTICS OVER THE SHORE (CJLOTS) MISSION. ESTABLISHED AND PARTIALLY FUNDED CLIN 0002AJ. FUNDING = $800,000.00. |
| Apr 14, 2015 | 4 | $0 | IGF::OT::IGF REALIGNMENT OF FUNDING FROM CLIN 0001AB TO CLINS 0002AC, 0002AE, 0003AA, AND 0003AB. |
| Mar 31, 2015 | 3 | $235.5K | IGF::OT::IGF PURPOSE OF MOD IS TO ACCEPT MLL'S PROPOSAL FOR THE PULSE-W2&W3 MISSIONS. NEW CLINS 0002AG-PULSE-W2 AND 0002AH-PULSE-W3 ESTABLISHED AND FUNDED. TOTAL VALUE OF ACTION = $$235,539.39. |
| Jan 29, 2015 | 2 | $0 | IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT 1. ADDITION AND DELETION OF CLAUSES 2. REALIGNMENT OF FUNDING |
| Sep 23, 2014 | 1 | $0 | IGF::OT::IGF ARMY PREPOSITIONED STOCK-4 JAPAN WATERCRAFT |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2027-06-01 (219 days from calculation)
- +35 points
- 3 historical awards in this buyer and category group
- +10 points
- 201 recorded award transactions
- +10 points
- Latest award action: 2026-05-29
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.