0003
IGF::OT::IGF REMEDIATION SERVICES AT BARC
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W0DA US ARMY SUSTAINMENT CMD |
| NAICS | 562910 — Remediation Services |
| PSC | F108 — Hazardous Substance Removal, Cleanup, and Disposal Services and Operational Support |
| Parent award / vehicle | W52P1J11D0001 |
| Set-aside | 8A COMPETED |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $7.7M |
| Current contract value | $7.7M |
| Potential contract value / ceiling | $7.7M |
| Start date | Aug 28, 2017 |
| Current end date | Oct 31, 2018 |
| Potential end date | Oct 31, 2018 |
| Latest award activity | Aug 28, 2017 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 26 of 26 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 13, 2021 | 25 | $-6.6K | MODIFICATION DE-OBLIGATES FUNDS FROM MULTIPLE CLINS. |
| Aug 28, 2020 | 24 | $-5.0K | MODIFICATION DE-OBLIGATES EXPIRING FY15 FUNDS. |
| Jul 10, 2019 | 23 | $-1.8M | MODIFICATION DE-OBLIGATES EXPIRING FUNDS FROM AFFECTED CLINS. |
| Sep 24, 2018 | 22 | $-112 | MODIFICATION DE-OBLIGATES EXPIRING FUNDS AND ADDS NEW YEAR FUNDS. |
| Jan 22, 2018 | 21 | $923 | EXTEND THE FENCE RENTAL THROUGH 31 JANUARY 2018. |
| Aug 28, 2017 | 20 | $0 | IGF::OT::IGF RADIOLOGICAL OVERSIGHT SERVICES: MODIFICATION EXTENDS THE POP ON CLINS 0004AB, 0008AA AND 0009AA. |
| Jun 19, 2017 | 19 | $9.3K | IGF::OT::IGF RADIOLOGICAL OVERSIGHT SERVICES: MODIFICATION EXTENDS THE FENCE RENTAL AND SITE INSPECTIONS FOR A PERIOD OF SIX MONTHS FROM 01 JULY 2017 THROUGH 31 DECEMBER 2017. |
| Dec 23, 2016 | 18 | $9.4K | IGF::OT::IGF RADIOLOGICAL OVERSIGHT SERVICES: MODIFICATION EXTENDS THE FENCE RENTAL AND SITE INSPECTIONS FOR A PERIOD OF SIX MONTHS FROM 01 JAN 2017 THROUGH 30 JUNE 2017. |
| Nov 29, 2016 | 17 | $15.8K | IGF::OT::IGF RADIOLOGICAL OVERSIGHT SERVICES: MODIFICATION IS FOR ADDITIONAL SAMPLING TO BE CONDUCTED AT THE SPRAY IRRIGATION WELL NUMBER 4, AS A RESULT OF THE PREVIOUS SAMPLING WHICH IDENTIFIED ELEVATED LEVELS OF RADIONUCLIDES ABOVE THE EPA REGION III PRG FOR RESIDENTIAL TAP WATER. ONE GROUNDWATER SAMPLE SHALL BE COLLECTED FROM SPRAY IRRIGATION FIELD (SIF-MW4). TWO WATER SAMPLES SHALL BE COLLECTED FROM THE MONITORING WELL AND ALL SAMPLES WILL BE ANALYZED FOR THE RADIONUCLIDES OF CONCERN RELATED TO THE PROJECT. ONE WATER SAMPLE SHALL BE COLLECTED UNFILTERED AND ONE WATER SAMPLE SHALL BE FILTERED FOLLOWING EPA PROTOCOL. ONE SET OF QA/QC SAMPLES SHALL ALSO BE COLLECTED FOR ANALYSIS PER EPA REQUIREMENTS AND THE QAPP. THE LAB ANALYSIS RESULTS WILL BE PROVIDED IN A WRITTEN REPORT THAT WILL INCLUDE A SUMMARY OF THE FIELD WORK PERFORMED. |
| Jun 28, 2016 | 16 | $9.0K | IGF::OT::IGF RADIOLOGICAL OVERSIGHT SERVICES: MODIFICATION PROVIDES FUNDING FOR THE SIX-MONTH EXTENSION FOR FENCE RENTAL AND MONTHLY SITE INSPECTIONS. |
| May 25, 2016 | 15 | $8.1K | IGF::OT::IGF RADIOLOGICAL OVERSIGHT SERVICES: MODIFICATION PROVIDES ADDITIONAL FUNDING TO SUPPORT EFFORTS AT THE BELTSVILLE SITE. |
| Apr 18, 2016 | 14 | $7.5K | IGF::OT::IGF, AG 2005-002 |
| Jan 25, 2016 | 13 | $10.1K | IGF::OT::IGF, AG 2005-002 |
| Sep 29, 2015 | 12 | $303.2K | IGF::OT::IGF APG 2005-002 GEOPROBE AND WATER SAMPLING |
| Aug 28, 2015 | 11 | $16.8K | IGF::OT::IGF APG 2005-002 FENCE RENTAL AND MONTHLY SITE INSPECTIONS |
| Mar 19, 2015 | 10 | $210.5K | IGF::OT::IGF APG 2005-002 STOCKPILE REMOVAL AND DISPOSAL |
| Sep 23, 2014 | 9 | $13.4K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE SUPPORT FOR THE 22-26 SEPTEMBER 2014, ONSITE SURVEY AND SAMPLING EFFORT BY NRC AND ORNL. |
| Sep 12, 2014 | 8 | $76.3K | THE PURPOSE OF THIS MODIFICATION 08 IS TO ADD ADDTIONAL FUNDS TO COVER 704 MORE CUBIC YARDS REMEDIATED THAN ESTIMATED. |
| Jul 15, 2014 | 7 | $0 | THE PURPOSE OF MODIFICATION 07 TO CONTRACT W52P1J-11-D-0001/0003, PROJECT AG 2005-0002/BELTSVILLE IS TO INCORPORATE TPMC-ENERGY SOLUTIONS ENVIRONMENTAL SERVICES 2008, LLC (TES)'S REVISED WORK PLAN DATED 25 MARCH 2014. THE REVISED WORK PLAN WILL ALLOW TES TO MAXIMIZE COST EFFICIENCY, WHILE MAINTAINING SAFETY AND COMPLIANCE, DURING THE SECOND HALF OF WASTE REMEDIATION. |
| Mar 31, 2014 | 6 | $2.3M | ADD ADDITIONAL FUNDING FOR AG 2005-002 BELTSVILLE AS A RESULT OF THE CHARACTERIZATION OF THE WASTE BEING CATEGORIZED AS LLRW VERSUS CONTAMINATED SOIL/DEBRIS/WATER. |
| Jan 30, 2014 | 5 | $0 | ALLOW TES TO TEMPORARILY SHUT DOWN OPERATIONS AT BELTSVILLE DURING THE MONTHS OF FEBRUARY AND MARCH 2014 TO ALLOW TIME FOR WEATHER CONDITIONS TO BECOME MORE AMENABLE FOR SAFE AND EFFICIENT SORTING AND SEGREGATION. |
| Nov 20, 2013 | 4 | $0 | CHANGE CONTRACT COMPLETION DATE |
| Sep 10, 2013 | 3 | $10.8K | RELOCATE AN EXISTING CABLE THAT IS BURIED IN THE WORK ZONE. |
| Aug 7, 2013 | 2 | $0 | THE PURPOSE OF THIS MODIFICATION W52P1J-11-D-0001/0003-02 IS TO INCORPORATE THE REVISED TECHNICAL APPROVAL WHICH WILL ALLOW THE UNDISTURBED COVER LAYER TO PROTECT THE WASTE PITS FROM EROSION AND UNNECESSARY CONTAMINATION MIGRATION UNTIL TES IS READY FOR REMEDIATION. |
| May 20, 2013 | 1 | $44.5K | THIS MODIFICATION IS TO ADD SUPER SILT FENCING AT THE BELTSVILLE AGRICULTURAL RESEARCH CENTER REMEDIATION PROJECT. |
| Apr 4, 2013 | 0 | $4.7M | IGF::OT::IGF REMEDIATION SERVICES AT BARC |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.