Federal contract award
0003
TENANT SUPPORT SERVICES AT RADFORD
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RI |
| NAICS | 561210 — Facilities Support Services |
| PSC | S216 — Facilities Operations Support Services |
| Parent award / vehicle | W52P1J11G0002 |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $49.9M |
| Current contract value | $49.9M |
| Potential contract value / ceiling | $49.9M |
| Start date | Jan 23, 2012 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | May 12, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 74 of 74 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 12, 2026 | 73 | $45.8K | CY26 DIESEL FUEL SPILL MONITORING AT RFAAP |
| Mar 12, 2026 | 72 | $0 | REVISION TO DIRECT FUNDED PWS ADDING CY 26 PROJECTS UNDER PWS 2 AT RFAAP |
| Mar 9, 2026 | 71 | $540.6K | SUPPLEMENTAL INCREMENTAL FUNDING OF PWS 15 ALTESS SUPPORT FOR CY 26 AT RADFORD ARMY AMMUNITION PLANT |
| Jan 30, 2026 | 70 | $5.0M | RFAAP CY26 DIRECT FUNDED PWS FUNDING - PWS 2, 14, 15, 16, & 18 |
| Jan 12, 2026 | 69 | $-12.1K | DE OBLIGATION OF FUNDS |
| Jan 5, 2026 | 68 | $-14 | DEFINITIZATION OF PFAS TESTING UCO |
| Sep 22, 2025 | 67 | $0 | AMEND THE PERIOD OF PERFORMANCE TO COINCIDE WITH THE BASE CONTRACT END PERIOD OF PERFORMANCE OF 31 DEC 2026 |
| Sep 17, 2025 | 66 | $12.3K | RFAAP WATER SAMPLING FOR PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) |
| Aug 4, 2025 | 64 | $0 | THE PURPOSE OF MODIFICATION 64 IS TO EXTEND THE PERIOD OF PERFORMANCE ON CLIN 2402AA FROM 31 DECEMBER 2024 TO 31 DECEMBER 2025 |
| Aug 4, 2025 | 65 | $29.3K | MOD TO INCREMENTALLY AND FULLY FUND PWS15. THIS REQUIREMENT EXTENDS THE POP DUE TO THE EXTRA WORK DUE TO THE DIESEL SPILL. |
| Mar 31, 2025 | 63 | $1.2M | DIRECT FUND PWS 15 FOR CY25. POP FROM 01 JAN 2025 TO 31 DEC 2025 |
| Jan 30, 2025 | 62 | $4.6M | DIRECT FUNDING PWS 2, 14, 16, AND 18 FOR CY25. POP FROM 2025JAN01 TO 2025DEC31. |
| Sep 25, 2024 | 61 | $184.6K | THE PURPOSE OF MODIFICATION 61 TO TASK ORDER 0003 IS TO INCREMENTALLY FUND CLIN 2415AC, AND ADD ADDITIONAL DIESEL FUEL SPILL MONITORING PERIODS. |
| Jun 14, 2024 | 60 | $400.0K | THE PURPOSE OF MODIFICATION 60 TO BOA W52P1J-11-G-0002 TASK ORDER 0003 IS TO ESTABLISH A NEW CLIN FOR ALTESS SUPPORT AS THE PREVIOUS CLIN CANNOT BE INCREMENTALLY FUNDED DUE TO PRIOR YEAR FUNDING. |
| Apr 12, 2024 | 59 | $5.0M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE PRICING CURVE UPDATE DUE TO ECONOMIC PRICE ADJUSTMENT ESCALATION FOR ORDERING PERIOD 0003 AS WELL AS INCORPORATE DIESEL FUEL MONITORING UNDER PWS 15. |
| Sep 27, 2023 | 58 | $1.7K | MODIFICATION 58 TO TO 0003 UNDER W52P1J-11-G-0002 IS TO INCORPORATE THE USPS PO BOX RENEWAL FEE UNDER THE PWS 15 IN SUPPORT OF ALTESS. |
| Sep 15, 2023 | 57 | $-100.8K | MODIFICATION 57 TO TO 0003 UNDER BOA W52P1J-11-G-0002 IS TO DEOBLIGATE FUNDS ASSOCIATED WITH OP2 PWS 15 UTILITIES AND EXERCISE OP2 DIESEL FUEL MONITORING (2 QUARTERS ADDITIONAL) WITHIN SCOPE OF CONTRACT. |
| Dec 29, 2022 | 56 | $5.5M | THIS MODIFICATION IS TO FULLY FUND CY23 DIRECT FUNDED PWS FOR OP2 IN SUPPORT OF THE RFAAP MISSION. |
| Dec 28, 2022 | 55 | $-3.8K | INCORPORATE PRICING CURVE UPDATE DUE TO ECONOMIC PRICE ADJUSTMENT ESCALATION FOR ORDERING PERIOD 0002, CY23 AND THE DOWNWARD RATE ADJUSTMENT FOR OPS 1 THROUGH 5 AS IT IMPACTS DIRECT FUNDED PWS AT THE RADFORD ARMY AMMUNITION PLANT. |
| Nov 29, 2022 | 54 | $-45.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE UNLIQUIDATED FUNDS FROM CY2019 PWS REQUIREMENTS AT RFAAP, TO AUTHORIZE MONTHLY BILLING AND REFLECT AN ADMINISTRATIVE CHANGE TO THE ACC-RI DODAAC. |
| Sep 29, 2022 | 53 | $-6.7K | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE ATTACHMENT 0017 DIRECT FUND PWS MATRIX TO ACCOUNT FOR COST CHANGES RELATED TO THE DIRECT FUND PWS REQUIREMENTS AND DEOBLIGATE FUNDS ASSOCIATED WITH DESCOPED PWS 15 ALTESS REQUIREMENTS AT RADFORD ARMY AMMUNITION PLANT. |
| Aug 22, 2022 | 52 | $23.5K | DEFINITIZE DIRECT FUND PERFORMANCE WORK STATEMENT AT RADFORD ARMY AMMUNITION PLANT. |
| Jan 21, 2022 | 51 | $3.6M | DIRECT FUND PWS FOR OPERATION AT RFAAP |
| Dec 17, 2021 | 50 | $0 | INCORPORATE DFARS CLAUSE 252.223-7999. EO 14042. |
| Sep 23, 2021 | 49 | $-1 | MODIFICATION 49 TO TASK ORDER 0003 UNDER BOA W52P1J-11-G-0002 DEOBLIGATES AN ULO. |
| May 7, 2021 | 48 | $5.4K | INCORPORATE FUNDING FOR PERFORMANCE WORK STATEMENT 19, FAMILY HOUSING SUPPORT AT STAFF VILLAGE AT RADFORD ARMY AMMUNITION PLANT. |
| Feb 26, 2021 | 47 | $1.4M | INCORPORATE FUNDING FOR PERFORMANCE WORK STATEMENTS 14, 15, 16, 18 AND 19 AT RADFORD ARMY AMMUNITION PLANT |
| Jan 25, 2021 | 46 | $7.5K | THE PURPOSE OF MODIFICATION 46 TO TASK ORDER 0003 UNDER BASIC ORDERING AGREEMENT W52P1J-11-G-0002 IS TO INCORPORATE FUNDING FOR PERFORMANCE WORK STATEMENT 18, CLASS 1 PERMIT MODIFICATION IN THE AMOUNT OF $7,539.58. |
| Sep 22, 2020 | 45 | $23.2K | DEFINITIZE THE UNPRICED CHANGE ORDER EXECUTED FOR PWS 14 - ACO SUPPORT STAFF SCOPE REVISION AND INCORPORATING PWS 19 - FAMILY HOUSING SUPPORT AT STAFF VILLAGE REQUIREMENTS. |
| Aug 7, 2020 | 44 | $0 | THE PURPOSE OF MODIFICATION 44 TO TASK ORDER 0003 UNDER BASIC ORDERING AGREEMENT W52P1J-11-G-0002 IS TO UPDATE THE LINE OF ACCOUNTING ON CLINS 2014AB&2014AC. |
| Jun 18, 2020 | 43 | $10.1K | MODIFICATION 43 IS FOR A UNPRICED CHANGE ORDER FOR ADDITIONAL SCOPE FOR PERFORMANCE WORK STATEMENT 14-ADMINISTRATIVE CONTRACTING OFFICER SUPPORTING STAFF AND 19-STAFF VILLAGE REQUIREMENT TO THE STATEMENT OF WORK. |
| Feb 28, 2020 | 41 | $0 | MODIFICATION 41 TO TASK ORDER 0003 DEOBLIGATES FUNDING FROM ONE CLIN AND OBLIGATES THE CLIN AMOUNT UNDER A NEW CLIN DUE TO ADMINISTRATIVE ISSUES. |
| Feb 28, 2020 | 42 | $1.4M | THE PURPOSE OF MODIFICATION 42 TO W52P1J-11-G-0002 TASK ORDER 0003 IS TO ESTABLISH CLINS AND FUNDING FOR CALENDAR YEAR 2020 PERFORMANCE WORK STATEMENTS 14, 15, 16, AND 18 AT RADFORD ARMY AMMUNITION PLANT. |
| Sep 19, 2019 | 40 | $7.9K | THE PURPOSE OF MODIFICATION 40 TO TASK ORDER 0003 UNDER W52P1J-11-G-0002 IS TO PROVIDE INCREMENTAL FUNDING FOR PERFORMANCE WORK STATEMENT 19 ARMY FAMILY HOUSING AT RADFORD ARMY AMMUNITION PLANT. THE TOTAL VALUE OF THIS MODIFICATION IS $7,914.51. |
| Aug 13, 2019 | 39 | $1.8M | CALENDAR YEAR 2019 FUNDING FOR PERFORMANCE WORK STATEMENTS 14, 15, 16, 18 AND 19. |
| Jan 22, 2019 | 38 | $14.7K | INCREMENTAL FUNDING FOR PWS 19 - ARMY FAMILY HOUSING, AT RADFORD ARMY AMMUNITION PLANT. |
| Sep 28, 2018 | 37 | $117.8K | PWS 19 - ARMY FAMILY HOUSING AT RADFORD ARMY AMMUNITION PLANT |
| Sep 26, 2018 | 36 | $1.5M | PWS 15 - ACQUISITION, LOGISTICS, AND TECHNOLOGY SUPPORT SERVICES (ALTESS) |
| Jul 30, 2018 | 35 | $155.4K | AWARD PERFORMANCE WORK STATEMENT (PWS) 18 "GROUND WATER MONITORING AND INSTALLATION RESTORATION PROGRAM SUPPORT" FOR 1-MAR-2018 THROUGH 28-FEB-2019. |
| Jun 29, 2018 | 34 | $590.5K | AWARD PERFORMANCE WORK STATEMENT (PWS) 16 AMMUNITION MATERIAL MANAGEMENT FOR 1-MAR-2018 THROUGH 28-FEB-2019. |
| Aug 2, 2017 | 33 | $2.5M | PROVIDE DIRECT FUNDING FOR PWS 14 - 19 AT THE RADFORD ARMY AMMUNITION PLANT. |
| Jun 21, 2017 | 32 | $-44.4K | MODIFICATION 32 TO TASK ORDER 0003 ON W52P1J-11-G-0002 IS TO DE-OBLIGATE FUNDS. |
| Sep 28, 2016 | 30 | $283.4K | ALTESS PWS 15: BALANCE OF DIRECT-FUNDED PWS FOR YEAR 5, BUILDING 220&213 SERVICES, AND MOTHER'S ROOM IAW DOD AD-201543 BREASTFEEDING-LACTATION SUPPORT POLICY. |
| Sep 28, 2016 | 31 | $204.6K | REPLACEMENT OF THE ROOF ON BUILDING 220 AT RADFORD ARMY AMMUNITION PLANT (RFAAP). THIS EFFORT WILL CONSIST OF THE REMOVAL OF THE EXISTING DETERIORATED BUILT-UP ROOF TO EXPOSE THE ROOF DECK, AND THE INSTALLATION OF NEW TAPERED ROOF INSULATION AND A NEW ROOF MEMBRANE TO PROVIDE A ROOF WITH A 20-YEAR WARRANTY AT RFAAP. |
| Jul 15, 2016 | 29 | $29.3K | MAINTENANCE OF ARMY FAMILY HOUSING AT RADFORD ARMY AMMUNITION PLANT. |
| Jul 5, 2016 | 28 | $48.2K | FUNDING OF ALTESS ADDITIONAL WORK FOR FY 2016, AND DCMA OFFICE SUPPORT FOR FY 2016. |
| Jun 16, 2016 | 27 | $138.1K | OBLIGATE FUNDING FOR PERFORMANCE WORK STATEMENT 18 "GROUND WATER MONITORING FOR HAZARDOUS WASTE MANAGEMENT UNITS 5&16; AND INSTALLATION RESTORATION PROGRAM SUPPORT FOR YEAR 5. |
| Mar 21, 2016 | 26 | $1.2M | THE PURPOSE OF THE DOCUMENT IS TO PROVIDE FUNDING FOR ERFORMANCE WORK STATEMENT 16 - AMMUNITION MATERIEL MANAGEMENT AT RADFORD ARMY AMMUNITION DEPOT. |
| Mar 1, 2016 | 25 | $999.0K | PROVIDING FUNDING FOR ACO SUPPORT, ALTESS SUPPORT, AND RADFORD ARMY FAMILY HOUSING SUPPORT AT RADFORD ARMY AMMUNITION PLANT. |
| Sep 21, 2015 | 24 | $6.5K | PROVIDING FUNDING FOR OFFICE SUPPORT FOR DCMA AT RADFORD ARMY AMMUNITION PLANT. |
| Sep 15, 2015 | 23 | $60.0K | FUNDING FOR PERFORMANCE WORK STATEMENTS AT RADFORD AAP |
| Aug 27, 2015 | 22 | $6.2K | PAYMENT IN SUPPORT OF DCMA SUPPORT AND ARNORTH ARMY EXERCISE. |
| Jul 15, 2015 | 21 | $142.8K | FUNDING FOR PERFORMANCE WORK STATEMENTS AT RADFORD |
| Jun 22, 2015 | 20 | $834.2K | FUNDING FOR PERFORMANCE WORK STATEMENTS AT RADFORD AAP |
| Apr 23, 2015 | 19 | $97.2K | FUNDING FOR PERFORMANCE WORK STATEMENTS AT RADFORD ARMY AMMUNITION PLANT |
| Feb 20, 2015 | 18 | $1.6M | FUNDING FOR PERFORMANCE WORK STATEMENTS AT RADFORD ARMY AMMUNITION PLANT |
| Dec 23, 2014 | 17 | $5.5K | ADDITIONAL SUPPORT FOR ARMY FAMILY HOUSING AT RADFORD ARMY AMMUNITION PLANT |
| Sep 18, 2014 | 16 | $490.0K | SUPPORT FOR ACQUISITION LOGISTICS AND TECHNOLOGY ENTERPRISE AYSTEMS AND SERVICES (ALTESS), AND ARMY FAMILY HOUSING (AFH) |
| Aug 11, 2014 | 15 | $235.2K | MODIFICATION TO ADD FUNDING FOR GROUND WATER MONITORING AT RFAAP |
| Jul 28, 2014 | 14 | $153.3K | SUPPORT FOR DIRECT FUNDED PERFORMANCE WORK STATEMENTS (PWS) AT RADFORD ARMY AMMUNITION PLANT. |
| Apr 7, 2014 | 13 | $689.1K | SUPPORT FOR DIRECT FUNDED PERFORMANCE WORK STATEMENT (PWS) AT RADFORD ARMY AMMUNITION PLANT |
| Feb 25, 2014 | 12 | $1.6M | DIRECT FUNDED PERFORMANCE WORK STATEMENTS (PWSS) YEAR 3 |
| Dec 17, 2013 | 11 | $8.3K | FUNDING PROVIDED FOR THE PAINTING OF HOUSE #9/10 (RFAAP). |
| Nov 14, 2013 | 10 | $39.9K | FUNDING FOR ACO SUPPORT. |
| Oct 28, 2013 | 9 | $0 | THE PURPOSE OF THIS ACTION IS TO REVISE THE PWS AND THE CDRLS. |
| Sep 25, 2013 | 8 | $355.2K | ADDITIONAL ALTESS FUNDING AND FUNDING FOR SITE SURVEY FOR 2ND ELECTRICAL POWER FEED ON ALTESS SITE AT RADFORD |
| Jun 25, 2013 | 7 | $1.0M | SUPPORT FOR DIRECT FUNDED PERFORMANCE WORK STATEMENTS (PWSS) AT RADFORD AAP. |
| Jun 4, 2013 | 6 | $600.2K | SUPPORT FOR DIRECT FUNDED PERFORMANCE WORK STATEMENTS (PWSS) AT RADFORD AAP. |
| Apr 24, 2013 | 5 | $768.0K | SUPPORT FOR DIRECT FUNDED PERFORMANCE WORK STATEMENTS (PWSS) AT RADFORD AAP. |
| Sep 25, 2012 | 4 | $343.3K | FUNDING ACTION ONLY |
| Jun 11, 2012 | 3 | $87.2K | SUPPORT FOR PERFORMANCE WORK STATEMENT 15 - ACQUISITION, LOGISTICS, AND TECHNOLOGY ENTERPRISE SYSTEMS AND SERVICES (ALTESS) |
| Mar 27, 2012 | 2 | $698.2K | SUPPORT FOR FAMILY HOUSING, AND ALTESS |
| Feb 13, 2012 | 1 | $100.0K | PROVIDES FUNDING FOR ALTESS |
| Jan 23, 2012 | 0 | $1.6M | TENANT SUPPORT SERVICES AT RADFORD |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2026-12-31 (67 days from calculation)
- +35 points
- 8 historical awards in this buyer and category group
- +15 points
- 74 recorded award transactions
- +10 points
- Latest award action: 2026-05-12
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.