| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVFACSYSCOM HAWAII |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z119 — Maintenance, Repair or Alteration of Other Administrative Facilities and Service Buildings |
| Parent award / vehicle | N6247810D4020 |
| Set-aside | HUBZONE SET-ASIDE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $6.2M |
| Current contract value | $6.2M |
| Potential contract value / ceiling | $6.2M |
| Start date | Sep 29, 2011 |
| Current end date | Apr 25, 2017 |
| Potential end date | Apr 25, 2017 |
| Latest award activity | Jul 28, 2021 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 29, 2021 | 9 | $0 | CONTRACT NO. N62478-10-D-4020-0019 MOD 09 TIME EXTENSION |
| Jul 28, 2021 | 8 | $159.2K | CONTRACT NO. N62478-10-D-4020 TASK ORDER NO. 0019, RENOVATE VOQ, JBPHH, MODIFICATION 08 CONCEAL SURFACE MOUNTED (EXPOSED) CONDUIT |
| Mar 29, 2016 | 7 | $-10.9K | BASE PERIOD CONTRACT NO. N62478-10-D-4020 -0019 RENOVATE VOQ, BLDG 926, JBPHH, HI PC 000009: CONTRACTOR SHALL PROVIDE A CREDIT TO REFLECT THE SUBCONTRACTOR DELAY COST PROPOSAL SUBMITTED ON 29 JAN 2016 IN THE AMOUNT OF $84,604 AS OPPOSED TO THE AMOUNT, $95,03, THAT WAS ISSUED ON MODIFICATION 6 ON 10 MAR 2016. |
| Mar 10, 2016 | 6 | $2.6M | BASE PERIOD CONTRACT NO. N62478-10-D-4020-0019 RENOVATE VOQ, BLDG 926 PC 000005: CONTRACTOR SHALL PROVIDE THE MATERIAL, LABOR, AND EQUIPMENT TO DO THE FOLLOWING SCOPE OF WORK: THIS PROJECT INVOLVES REPLACING ALL EXISTING EXTERIOR WINDOWS/DOORS AND UPGRADING THE EXTERIOR WALLS WITHIN BUILDING 926H TO MEET ATFP STANDARDS. THE CONTRACTOR SHALL REPLACE ALL EXISTING WINDOWS (FRAMES/GLAZING) AND DOORS (DOORS/FRAME) WITH WINDOWS AND DOORS THAT MEET THE UNITED FACILITIES CRITERIA (UFC) 4-010-01 (CHANGE 1, 1 22 JANUARY 2007) DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS. THE CONTRACTOR SHALL ALSO MATCH THE WINDOW FRAMES PROFILE, OPERATION, AND COLOR. THE GLAZING COLOR SHALL ALSO MATCH THE EXISTING GLAZING COLOR. GLAZING THICKNESS SHALL BE AS CLOSE TO THE EXISTING THICKNESS AS POSSIBLE WITHOUT COMPROMISING THE REQUIRED ATFP REQUIREMENTS. NEW ATFP DOOR/FRAME SHALL ALSO MATCH EXISTING DOOR/FRAME PROFILES. THE CONTRACTOR MUST ALSO CONFIRM THE STRUCTURAL SOUNDNESS OF ALL THE EXISTING WINDOW OPENINGS, DOOR OPENINGS, AND EXTERIOR WALL CONSTRUCTION PER THE MINIMUM REQUIREMENTS SET FORTH IN THE UFC 4-010-01 AND RETROFIT AS REQUIRED IF FOUND DEFICIENT. THE CONTRACTOR SHALL ALSO PROVIDE AN ATFP APPROVED DESIGN THAT PROVIDES THE LEAST AMOUNT OF INTRUSION INTO THE INTERIOR SPACES AND IS THE MOST ECONOMICAL IN SATISFYING THE ATFP REQUIREMENTS. PC 000006: CONTRACTOR SHALL PROVIDE THE MATERIAL, LABOR, AND EQUIPMENT TO DO THE FOLLOWING SCOPE OF WORK: THE SCOPE OF WORK INVOLVES DESIGNING AND CONSTRUCTING A NEW CHILLER PAD AND ENCLOSURE FOR THE NEW HVAC EQUIPMENT AT BUILDING 926H. THE CONTRACTOR SHALL PROVIDE ENGINEERING DRAWINGS AND SPECIFICATIONS FOR THE NEW CHILLER PAD AND ENCLOSURE. THE CHILLER PAD SHALL BE MADE OUT OF CONCRETE SIZED TO ACCOMMODATE AND DESIGNED TO SUPPORT THE WEIGHT OF THE NEW HVAC EQUIPMENT FOR BUILDING 926H ONLY. THE CHILLER PAD SHALL BE ENCLOSED BY A CHAIN LINK FENCE ALL AROUND TO SECURE THE HVAC EQUIPMENT WITH ACCESS PROVIDED BY GATES AND GATE HARDWARE. THE HEIGHT OF THE CHAIN LINK FENCE ENCLOSURE SHALL BE 8'-0" MINIMUM. THE LOCATION OF THE NEW CHILLER PAD SHALL BE LOCATED AT LEAST 10 METERS (33 FEET) FROM BUILDING 926H.THIS WILL ALLOW FOR THE NEW CHILLER PAD TO SIT OUTSIDE OF THE UNOBSTRUCTED SPACE AS DEFINED IN UFC 4-010-01, 8 OCTOBER 2003, CHANGE 12, 22 JANUARY 2007. PC 000007: CONTRACTOR SHALL PROVIDE THE MATERIAL, LABOR, AND EQUIPMENT TO DO THE FOLLOWING SCOPE OF WORK: - PER THE ANALYTICAL REPORT (DATED 21 NOVEMBER 2014), IT HAS BEEN DETERMINED THAT AN ASBESTOS INSULATION-WRAPPED PIPE HAS BEEN IDENTIFIED IN VOQ B-926H, IS IN POOR CONDITION, AND NEEDS TO BE ABATED. KTR IS TO REMOVE THREE 6-FOOT SEGMENTS (TOTAL OF 18 LF) OF ASBESTOS (CHRYSOLITE/CELLULOSE (UNDULOSE EXTINCTION)) WRAPPED PIPE EMBEDDED IN A CMU WALL, LOCATED IN CMU CHASE WALLS IN FIRST FLOOR BATHROOMS (BETWEEN UNITS 105&016 AND 101&102). HAZMAT MATERIAL IS TO BE REMOVED AND TRANSPORTED/DISPOSED OF ACCORDING TO CURRENT FEDERAL AND STATE HAZMAT MANAGEMENT REGULATIONS AND PROCEDURES. - REMOVE ANY MOLD FOUND BEHIND THE WALLPAPER PRIOR TO PREPPING FOR PAINT. |
| Aug 6, 2015 | 5 | $0 | BASE PERIOD CONTRACT NO. N62478-10-D-4020-0019 RENOVATE VOQ BLDG. 926, JBPHH SUSPENSION MODIFICATION DUE TO DELAY IN OBTAINING FUNDING THROUGH THE UPWARD OBLIGATION PROCESS. |
| Sep 25, 2014 | 4 | $0 | BASE PERIOD N62478-10-D-4020-0009 RENOVATE VOQ, BLDG. 926: TIME EXTENSION OF 237 CALENDAR DAYS DUE TO GOVERNMENT DELAY IN REVIEWING AND RETURNING DESIGN SUBMITTALS AND THE ADDITIONAL NEW COMMENTS ADDED DURING THE FINAL DESIGN. |
| Dec 5, 2013 | 3 | $130.8K | N62478-10-D-4020 TO 0019 MOD 03 RENOVATE VQ, BLDG 926 THE PURPOSE OF MOD 03 IS TO REPAIR COUPLING BEAMS DEFICIENCY AND REPAIR VERTICAL DISCONTINUITIES DEFICIENCY. AS A RESULT, PERIOD OF PERFORMANCE IS EXTENDED 196 CALENDAR DAYS FROM 14 MAR 2014 TO 26 SEP 2014. |
| Jun 28, 2013 | 1 | $149.8K | N62478-10-D-4020-0019 RENOVATE VOQ BLDG 926 THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE DESIGN TO ACCOMMODATE HISTORICAL PRESERVATION REQUIREMENTS. |
| Jun 28, 2013 | 2 | $327.2K | N62478-10-D-4020-0019 RENOVATE VOQ BLDG 926 HICAKM. THIS MODIFICATION IS TO CONSTRUCT A CHILLER PLANT FOR BLDG 926. |
| Sep 29, 2011 | 0 | $2.9M | BASE PERIOD |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.