Federal contract award
0045
SYSTEM DEVELOPMENT SUPPORT INTEGRATION IGF::CL::IGF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | MISSILE DEFENSE AGENCY (MDA) |
| NAICS | 541720 — Research and Development in the Social Sciences and Humanities |
| PSC | AC24 — NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; R&D ADMINISTRATIVE EXPENSES |
| Parent award / vehicle | HQ014712D0001 |
| Set-aside | Not reported |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $556.4M |
| Current contract value | $570.8M |
| Potential contract value / ceiling | $570.8M |
| Start date | Jun 30, 2016 |
| Current end date | Jan 31, 2024 |
| Potential end date | Jan 31, 2024 |
| Latest award activity | Feb 9, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 138 of 138 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Feb 9, 2026 | C9 | $-100.0K | SYSTEM DEVELOPMENT SUPPORT AND INTEGRATION (SDSI) |
| Sep 25, 2024 | C8 | $-20.0K | DEOBLIGATE FUNDING ON CLIN 1098 |
| Aug 28, 2024 | C7 | $-250.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| May 21, 2024 | C6 | $-150.0K | DEOBLIGATE FUNDING ON CLIN 1002 AND CLIN 1006. |
| May 8, 2024 | C5 | $-20.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 13, 2023 | C4 | $250.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 31, 2023 | C1 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jul 31, 2023 | BZ | $0 | NO COST EXTENSION CLIN 4000 TO AUGUST 31, 2023 |
| Jun 22, 2023 | BY | $-650.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| May 25, 2023 | BX | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| May 17, 2023 | BW | $-3.6M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Dec 19, 2022 | BV | $0 | POP EXTENSION TO ALLOW FOR GOVERNMENT REVIEWS. |
| Dec 9, 2022 | BU | $0 | THIS IS THAAD'S SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER (TO). THIS MODIFICATION IS TO ADD A SCHEDULE FOR THE DELIVERY OF CAP. |
| Aug 10, 2022 | BT | $-2.7M | THIS TASK ORDER IS FOR SYSTEM DEVELOPMENT SUPPORT INTEGRATION OF THE THAAD MISSILE SYSTEM. |
| Jun 17, 2022 | BS | $0 | THIS TASK ORDER IS FOR THE SYSTEM DEVELOPMENT SUPPORT INTEGRATION UNDER THAAD'S ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT. |
| May 24, 2022 | BR | $3.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| May 19, 2022 | BQ | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| Apr 26, 2022 | BP | $5.4M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| Apr 14, 2022 | BN | $4.0M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| Apr 7, 2022 | BM | $-4.5M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Mar 16, 2022 | BL | $1.5M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| Feb 23, 2022 | BK | $3.6M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| Feb 16, 2022 | BJ | $991.4K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| Jan 28, 2022 | BH | $6.1M | THAAD SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER FOR THAAD ADVANCED CAPABILITIES DEVELOPMENT (ACD) CONTRACT |
| Jan 5, 2022 | BG | $2.0M | THIS IS THE THAAD SYSTEM DEVELOPMENT SUPPORT INTEGRATION TASK ORDER. THIS MODIFICATION ADDS INCREMENTAL FUNDING. |
| Nov 30, 2021 | BF | $9.4M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Nov 23, 2021 | BE | $0 | THIS TASK ORDER IS FOR THE SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THIS MODIFICATION IS TO ADD CAP CLIN AND UPDATE A TASK INSTRUCTION. |
| Sep 22, 2021 | BD | $910.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 17, 2021 | BC | $24.6K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 16, 2021 | BB | $-7.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 10, 2021 | BA | $7.7K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 31, 2021 | B9 | $0 | THIS TASK ORDER IS FOR THE SYSTEM DEVELOPMENT SUPPORT INTEGRATION FOR THE THAAD WEAPON SYSTEM. |
| Aug 30, 2021 | B8 | $54.5K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jul 30, 2021 | B7 | $1.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jul 20, 2021 | B6 | $3.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jun 29, 2021 | B5 | $7.3M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jun 2, 2021 | B4 | $132.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Apr 27, 2021 | B3 | $27.5M | CHANGE MODIFICATION TO INCORPORATE SOFTWARE DEVELOPMENT EFFORTS ON THIS TASK ORDER AS WELL AS FUND THIS EFFORT. THIS MODIFICATION ALSO INCORPORATED DATA RIGHTS AND INCREMENTALLY FUNDED OTHER CLINS FOR OTHER EFFORTS. |
| Feb 25, 2021 | B2 | $16.2M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REVISED TASK INSTRUCTION ATTACHMENT 8, ATTACHMENT 9 AND SOW ATTACHMENT 1 IN SEC. J. THIS MODIFICATION ALSO INCREMENTALLY FUNDED CLINS ON THIS TASK ORDER. |
| Jan 27, 2021 | B1 | $2.8M | ADDING FUNDING TO CLIN 2003 (INCREMENTAL FUNDING MODIFICATION) SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jan 12, 2021 | 99 | $7.0M | THE PURPOSE OF THIS MODIFICATION IS REVISE TASK INSTRUCTION EFFORT EXTERNAL PLANNER AND FUND THE REMAINING EFFORT. |
| Dec 18, 2020 | 98 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 2008 AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Nov 16, 2020 | 97 | $18.8M | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND CLINS ON CONTRACT. |
| Nov 4, 2020 | 96 | $10.4M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUNDS CLINS 2002&2007. |
| Oct 29, 2020 | 95 | $749.4K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Oct 22, 2020 | 94 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SOW ON CONTRACT. |
| Sep 25, 2020 | 93 | $225.9K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND. |
| Sep 22, 2020 | 92 | $1.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PHASE 3 TASK INSTRUCTION FOR REMOTE LAUNCHER 4.0. |
| Sep 17, 2020 | 91 | $3.7M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND CLIN 2002 AND DE-OBLIGATE FUNDING ON CLIN 4000 |
| Aug 27, 2020 | 89 | $905.3K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, THIS MODIFICATION IS TO FUND CLIN 4000 ON TO 45. |
| Aug 27, 2020 | 90 | $5.1K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND. |
| Jul 29, 2020 | 88 | $3.7M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, THIS MODIFICATION IS TO FUND CLINS ON TO 45. |
| Jun 11, 2020 | 87 | $5.6M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jun 5, 2020 | 86 | $-2.4M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| May 13, 2020 | 85 | $-13.0M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Apr 24, 2020 | 84 | $10.0M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Apr 1, 2020 | 83 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Mar 27, 2020 | 82 | $607.6K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Feb 26, 2020 | 81 | $11.5M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Feb 6, 2020 | 80 | $48.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION (INCREMENTAL FUNDING) |
| Jan 30, 2020 | 78 | $4.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Nov 26, 2019 | 77 | $1.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Nov 21, 2019 | 76 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 27, 2019 | 75 | $2.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 24, 2019 | 74 | $2.7M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 19, 2019 | 73 | $106 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 18, 2019 | 72 | $499.9K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 12, 2019 | 70 | $18.1K | THIS ACTION ADDS FUNDING TO THE SYSTEM DEVELOPMENT SUPPORT INTEGRATION TO FOR THE THAAD MISSILE SYSTEM. |
| Sep 12, 2019 | 71 | $50.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 11, 2019 | 69 | $14.9M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 30, 2019 | 68 | $965.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 29, 2019 | 67 | $1.4M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 27, 2019 | 66 | $618.6K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 9, 2019 | 65 | $0 | THAAD MISSILE SEGMENT ENHANCEMENT INTEGRATION (TMI) PART I |
| Aug 6, 2019 | 64 | $14.3M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION OPERATIONS&MAINTENANCE REALIGNMENT |
| Jul 29, 2019 | 63 | $644.4K | THIS TO IS FOR THE SYSTEM DEVELOPMENT SUPPORT INTEGRATION (SDSI)FOR THAAD MISSILE SYSTEM. THIS ACTION ADDS INCREMENTAL FUNDING. |
| Jul 17, 2019 | 62 | $36.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| May 30, 2019 | 61 | $3.0M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Apr 29, 2019 | 60 | $7.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, INCREMENTAL FUNDING ON EXISTING EFFORT. |
| Mar 25, 2019 | 59 | $3.0M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Feb 28, 2019 | 58 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jan 8, 2019 | 57 | $13.2K | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Dec 20, 2018 | 56 | $1.4M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Nov 27, 2018 | 55 | $21.3M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Nov 20, 2018 | 54 | $6.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Nov 12, 2018 | 53 | $22.1M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 28, 2018 | 52 | $19.4K | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 27, 2018 | 51 | $1.1K | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 25, 2018 | 50 | $15.2K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 21, 2018 | 48 | $6.2M | IGF::OT::IGF TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) - SYSTEM DEVELOPMENT SUPPORT INTEGRATION - THIS MODIFICATION INCORPORATED CONTRACT LINE ITEM NUMBER (CLIN) 1102 FOR INTERNATIONAL ENGINEERING SERVICES PROGRAM (IESP) FUNDS. |
| Sep 21, 2018 | 49 | $67.9K | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 17, 2018 | 47 | $3.1M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 14, 2018 | 46 | $7.9M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 7, 2018 | 45 | $946.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 31, 2018 | 44 | $293.9K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Aug 24, 2018 | 43 | $10.1M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jul 26, 2018 | 42 | $11.2M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jul 19, 2018 | 41 | $195.0K | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jun 22, 2018 | 40 | $3.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION IGF::OT::IGF |
| May 31, 2018 | 38 | $11.6M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THIS MODIFICATION AWARDS AN UNPRICED CHANGE ORDER (UCO) FOR THE SOFTWARE BUILD UPDATE. |
| May 31, 2018 | 39 | $-198.2K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING. |
| Apr 27, 2018 | 37 | $24.3M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION IGF::OT::IGF |
| Apr 18, 2018 | 36 | $3.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING. |
| Apr 5, 2018 | 35 | $-10.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THIS MODIFICATION PROVIDES FUNDING, DE-OBLIGATES FUNDING AND UPDATES THE COST AND SOFTWARE DATA REPORTING. |
| Mar 29, 2018 | 34 | $421.2K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING. |
| Mar 14, 2018 | 33 | $-10.2M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION IGF::OT::IGF |
| Mar 1, 2018 | 32 | $1.5M | IGF::OT::IGF - SYSTEM DEVELOPMENT SUPPORT INTEGRATION - THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING ON CLIN 0003 IN THE AMOUNT OF $1.5M. |
| Feb 26, 2018 | 31 | $4.0M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION - THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING ON CLIN 0002 IN THE AMOUNT OF $4,000,000.00. THE PURPOSE IS ALSO TO CORRECT CLAUSE G-06, ALLOTMENT OF FUNDS. THE TOTAL CPFF AMOUNT ON CLIN 1098 WAS CORRECTED TO $31,912,000.00. |
| Jan 30, 2018 | 30 | $3.7M | IGF::OT::IGF - SYSTEM DEVELOPMENT SUPPORT INTEGRATION - THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING ON CLIN 0002. |
| Jan 24, 2018 | 29 | $3.0M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION - THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING ON CLIN 0002. |
| Jan 17, 2018 | 28 | $24.8M | IGF::OT::IGF - SYSTEM DEVELOPMENT SUPPORT INTEGRATION - THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING ON CLIN 0002. |
| Dec 1, 2017 | 27 | $4.9M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING ON CLIN 0002 AND TO RE-OBLIGATE FUNDS ON CLIN 0002 WITH THE CORRECT LINE OF ACCOUNTING. |
| Nov 20, 2017 | 26 | $-1.4M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION - THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS ON CLIN 0002 DUE TO INCORRECT LINE OF ACCOUNTING. |
| Oct 31, 2017 | 24 | $1.9M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION. INCREMENTAL FUNDING ON CLIN 1006 |
| Oct 24, 2017 | 23 | $2.6M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Oct 18, 2017 | 22 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, POST AWARD ADMINISTRATION, ADDITION OF SECTION J ATTACHMENT INADVERTENTLY EXCLUDED DURING CONTRACT AWARD; IGF::OT::IGF |
| Sep 29, 2017 | 21 | $31.9M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, INCREMENTAL FUNDING MODIFICATION THROUGH THE CREATION OF AN ADDITIONAL CLIN; IGF::OT::IGF |
| Sep 19, 2017 | 20 | $901.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, INCREMENTAL FUNDING ACTION IGF::OT::IGF |
| Aug 31, 2017 | 19 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, CHANGE ORDER AWARD TO ADD SCOPE TO EXISTING CONTRACT. END ITEM IS SOFTWARE DELIVERABLE FOR MISSILE SYSTEM. SCOPE ADDITION CULMINATES IN SAME SOFTWARE BUILD AS THAT CURRENTLY ON CONTRACT. IGF::OT::IGF |
| Aug 18, 2017 | 18 | $-2.7M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION, FUNDING ONLY ACTION IGF::OT::IGF |
| Jul 21, 2017 | 17 | $0 | IGF::CT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION. INCORPORATE REVISED SOW REV. D |
| Jun 29, 2017 | 16 | $8.8M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION IGF::OT::IGF |
| May 30, 2017 | 15 | $14.0M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| May 11, 2017 | 14 | $0 | SYSTEM DEVELOPMENT SUPPORT INTEGRATION IGF::OT::IGF |
| Apr 27, 2017 | 13 | $2.1M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Mar 31, 2017 | 12 | $1.0M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION/ INCREMENTAL FUNDING MODIFICATION; IGF::OT::IGF |
| Mar 28, 2017 | 11 | $7.7M | IGF::CT::IGF. SYSTEM DEVELOPMENT SUPPORT INTEGRATION. CHANGE IN SCOPE AND OBLIGATE INCREMENTAL FUNDING |
| Feb 3, 2017 | 10 | $0 | ADMINISTRATIVE MODIFICATION TO SET ACRN ORDER IN SECTION G. IGF::OT::IGF |
| Jan 12, 2017 | 9 | $18.0M | IGF::CT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION INCREMENTAL FUNDING |
| Nov 21, 2016 | 8 | $4.5M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION INCREMENTAL FUNDING IGF::OT::IGF |
| Oct 31, 2016 | 7 | $1.0M | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Oct 5, 2016 | 6 | $0 | IGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Sep 30, 2016 | 5 | $0 | SIGF::OT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION. DATA ASSERTION |
| Sep 20, 2016 | 4 | $294.0K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION; IGF::OT::IGF |
| Sep 9, 2016 | 3 | $156.9K | SYSTEM DEVELOPMENT SUPPORT INTEGRATION INCREMENTAL FUNDING IGF::CT::IGF |
| Aug 29, 2016 | 2 | $3.3M | IGF::OT::IGF SDSI INCREMENTAL FUNDING |
| Jul 28, 2016 | 1 | $2.6M | IGF::CT::IGF SYSTEM DEVELOPMENT SUPPORT INTEGRATION |
| Jun 30, 2016 | 0 | $24.3M | SYSTEM DEVELOPMENT SUPPORT INTEGRATION IGF::CL::IGF |