Federal contract award

0056

IGF::OT::IGF ENGINEER AND DOCUMENT THE ACEPS PHASE II INSTALLATION OF THE STANDBY SYSTEM AT THE ESF AND DEVELOP A NATIONAL STANDARD DESIGN FOR THE INSTALLATION AND INTEGRATION OF THE PHASE II ENGINE GENERATOR INSTALLATION AT ACEPS FACILITIES.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6973GH FRANCHISE ACQUISITION SVCS
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCN061 — Installation of Equipment: Electric Wire, and Power and Distribution Equipment
Parent award / vehicleDTFAAC16D00019
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.7M
Current contract value$2.7M
Potential contract value / ceiling$2.7M
Start dateDec 21, 2016
Current end dateDec 30, 2024
Potential end dateDec 30, 2024
Latest award activitySep 13, 2023
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 13, 2023P00004$-4.9KDESIGN COST FOR THE ACEPS II PHASE 2 NATIONAL DESIGN MODIFICATION
Apr 7, 2021P00003$20.5KDESIGN COST FOR THE ACEPS II PHASE 2 NATIONAL DESIGN MODIFICATION
Dec 19, 2019P00002$52.2KENGINEER AND DOCUMENT THE ACEPS PHASE II INSTALLATION OF THE STANDBY SYSTEM AT THE ESF AND DEVELOP A NATIONAL STANDARD DESIGN FOR THE INSTALLATION AND INTEGRATION OF THE PHASE II ENGINE GENERATOR INSTALLATION AT ACEPS FACILITIES.
Aug 28, 20171$1.3MIGF::OT::IGF ENGINEER AND DOCUMENT THE ACEPS PHASE II INSTALLATION OF THE STANDBY SYSTEM AT THE ESF AND DEVELOP A NATIONAL STANDARD DESIGN FOR THE INSTALLATION AND INTEGRATION OF THE PHASE II ENGINE GENERATOR INSTALLATION AT ACEPS FACILITIES.
Dec 21, 20160$1.3MIGF::OT::IGF ENGINEER AND DOCUMENT THE ACEPS PHASE II INSTALLATION OF THE STANDBY SYSTEM AT THE ESF AND DEVELOP A NATIONAL STANDARD DESIGN FOR THE INSTALLATION AND INTEGRATION OF THE PHASE II ENGINE GENERATOR INSTALLATION AT ACEPS FACILITIES.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.