Federal contract award
0068
THE CONTRACTOR SHALL PROVIDE 315 ARC-231 ADAPTER CABLES IN ACCORDANCE WITH GOVERNMENT FURNISHED DRAWING NUMBER 9877561020. THE CONTRACTOR SHALL CONFIGURATION UPGRADE THIRTY (30) CVDR, PART NUMBER 2500-1302-01. THE CONTRACTOR SHALL CONFIGURATION UPGRADE FIFTEEN (15) PUMPS, PART NUMBER 3032171-001 THE CONTRACTOR SHALL PROVIDE THIRTY (30) EPUSHA PUMPS, PART NUMBER 3032171-001, AND THIRTY (30) CONTROL BOXES, PART NUMBER SX7EG23 . THE CONTRACTOR SHALL CONDUCT A PRODUCIBILITY REVIEW OF ALL GOVERNMENT FURNISHED DRAWINGS. A PRODUCIBILITY REVIEW SHALL BE CONDUCTED ON ALL CUSTOMER SUPPLIED DRAWINGS IN ACCORDANCE WITH TECHNICAL DATA PACKAGE (TDP) CHANGE MANAGEMENT, POP 730-02. AFTER THE PRODUCIBILITY REVIEW THE DRAWING WILL BE SUBMITTED TO DOCUMENT CONTROL. THE CONTRACTOR SHALL PREPARE POWER POINT SLIDES TO SUPPORT IPT MEETINGS AS REQUIRED TO DISCUSS THE UPDATED STATUS, PERFORMANCE AND COST FOR THE PROJECT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RSA |
| NAICS | 336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| PSC | J016 — Maintenance, Repair and Rebuilding of Equipment: Aircraft Components and Accessories |
| Parent award / vehicle | W58RGZ12D0089 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $1.8M |
| Current contract value | $1.8M |
| Potential contract value / ceiling | $1.8M |
| Start date | Feb 6, 2013 |
| Current end date | Nov 30, 2015 |
| Potential end date | Nov 30, 2015 |
| Latest award activity | May 13, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 13, 2026 | 10 | $-0 | ARC-231 ADAPTER CABLES, COCKPIT VOICE DATA RECORDERS (CVDRS), EPUSHA PUMP AND CONTROL BOX UPGRADE |
| Jun 16, 2022 | 9 | $-4.9K | ARC-231 ADAPTER CABLES-DEOBLIGATION OF FUNDS |
| Jun 16, 2022 | 9 | $-281 | ARC-231 ADAPTER CABLES-DEOBLIGATION OF FUNDS |
| Mar 21, 2018 | 8 | $-268.4K | THE CONTRACTOR SHALL CONFIGURATION UPGRADE FORTY CVDR, PART NUMBER 2500-1302-01. THE CONTRACTOR SHALL CONFIGURATION UPGRADE FIFTEEN PUMPS, PART NUMBER 3032171-001 THE CONTRACTOR SHALL PROVIDE THIRTY EPUSHA PUMPS, PART NUMBER 3032171-001, AND THIRTY CONTROL BOXES, PART NUMBER SX7EG23 . THE CONTRACTOR SHALL MANUFACTURE 85 MMS MOUNTS (1048661-101). THERE ARE 23 OF 85 MMS MOUNTS WHICH WILL BE USED TO SUPPORT FMS. THE CONTRACTOR SHALL RECONFIGURE 100 MMS MOUNTS TO THE NEW CONFIGURATION (1048661-101). THE CONTRACTOR SHALL MANUFACTURE 235 GROUNDING CABLES (GRN47F07-001). THERE ARE 23 OF 235 GROUNDING CABLES WHICH WILL BE USED TO SUPPORT FMS. THERE WILL BE THREE (3) DIFFERENT QUANTITIES REQUIREMENT FOR 3 DIFFERENT FMS CASES AS FOLLOWING: ZAF066 REQUIRED 10 MMS MOUNTING AND 10 GROUDING CABLES UDK085 REQUIRED 7 MMS MOUNTING AND 7 GROUNDING CABLES VCQ040 REQUIRED 6 MMS MOUNTING AND 6 GROUNDING CABLES THE CONTRACTOR SHALL RECEIVE, QUALITY INSPECT, KIT, AND SHIP GFE PROVIDED IN ATTACHMENT A. THE CONTRACTOR SHALL CONDUCT A PRODUCIBILITY REVIEW OF ALL GOVERNMENT FURNISHED DRAWINGS. A PRODUCIBILITY REVIEW SHALL BE CONDUCTED ON ALL CUSTOMER SUPPLIED DRAWINGS IN ACCORDANCE WITH TECHNICAL DATA PACKAGE (TDP) CHANGE MANAGEMENT, POP 730-02. AFTER THE PRODUCIBILITY REVIEW THE DRAWING WILL BE SUBMITTED TO DOCUMENT CONTROL. THE CONTRACTOR SHALL PREPARE POWER POINT SLIDES TO SUPPORT IPT MEETINGS AS REQUIRED TO DISCUSS THE UPDATED STATUS, PERFORMANCE AND COST FOR THE PROJECT. |
| Jun 18, 2015 | 7 | $0 | IGF::OT::IGF, THIS IS A PERIOD OF PERFORMANCE EXTENSION AND REALLOCATION MODIFICATION. |
| Mar 26, 2015 | 6 | $0 | IGF::OT::IGF: PERIOD OF PERFORMANCE EXTENSION. |
| Nov 12, 2014 | 5 | $0 | ADMIN MOD. |
| Jun 16, 2014 | 4 | $0 | RE-ALLOCATION MODIFICATION. |
| Apr 24, 2014 | 3 | $0 | STATEMENT OF WORK (SOW) CHANGE. |
| Jan 13, 2014 | 2 | $150.6K | COST IMPACT MODIFICATION. |
| Jun 4, 2013 | 1 | $0 | SLIN RE-NAME FOR THIS TASK ORDER. |
| Feb 7, 2013 | 0 | $1.8M | TASK ORDER 0068. |
| Feb 6, 2013 | 0 | $1.8M | THE CONTRACTOR SHALL PROVIDE 315 ARC-231 ADAPTER CABLES IN ACCORDANCE WITH GOVERNMENT FURNISHED DRAWING NUMBER 9877561020. THE CONTRACTOR SHALL CONFIGURATION UPGRADE THIRTY (30) CVDR, PART NUMBER 2500-1302-01. THE CONTRACTOR SHALL CONFIGURATION UPGRADE FIFTEEN (15) PUMPS, PART NUMBER 3032171-001 THE CONTRACTOR SHALL PROVIDE THIRTY (30) EPUSHA PUMPS, PART NUMBER 3032171-001, AND THIRTY (30) CONTROL BOXES, PART NUMBER SX7EG23 . THE CONTRACTOR SHALL CONDUCT A PRODUCIBILITY REVIEW OF ALL GOVERNMENT FURNISHED DRAWINGS. A PRODUCIBILITY REVIEW SHALL BE CONDUCTED ON ALL CUSTOMER SUPPLIED DRAWINGS IN ACCORDANCE WITH TECHNICAL DATA PACKAGE (TDP) CHANGE MANAGEMENT, POP 730-02. AFTER THE PRODUCIBILITY REVIEW THE DRAWING WILL BE SUBMITTED TO DOCUMENT CONTROL. THE CONTRACTOR SHALL PREPARE POWER POINT SLIDES TO SUPPORT IPT MEETINGS AS REQUIRED TO DISCUSS THE UPDATED STATUS, PERFORMANCE AND COST FOR THE PROJECT. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.