Federal contract award

0079

OEP 14235 - H-60M HONTEK REMOVAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSCJ016 — Maintenance, Repair and Rebuilding of Equipment: Aircraft Components and Accessories
Parent award / vehicleW58RGZ12D0089
Set-aside8A COMPETED
Pricing typeCOST PLUS FIXED FEE
Obligations$24.9M
Current contract value$24.9M
Potential contract value / ceiling$25.1M
Start dateDec 5, 2016
Current end dateSep 30, 2016
Potential end dateSep 30, 2016
Latest award activityDec 5, 2016
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 19 of 19 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 18, 202014$-211HH-60M TALON FLIR MMS
Jul 31, 201813$-26.4KTHIS STATEMENT OF WORK (SOW) IS FOR THE DEVELOPMENT OF A MODIFICATION WORK ORDER (MWO) FOR THE REMOVAL OF THE HONTEK COATING FROM THE MAIN ROTOR BLADES (MRB) ON H-60M AIRCRAFT. ADDITIONALLY MRBS ARE TO BE REMOVED FROM 500 AIRCRAFT AND REPLACED AFTER THE HONTEK COATING IS REMOVED AND THE BLADES ARE REPAIRED. THE HONTEK COATING IS ALSO TO BE REMOVED FROM AN ADDITIONAL 126 SPARE MRBS.
Jul 31, 201813$-10.9KTHIS STATEMENT OF WORK (SOW) IS FOR THE DEVELOPMENT OF A MODIFICATION WORK ORDER (MWO) FOR THE REMOVAL OF THE HONTEK COATING FROM THE MAIN ROTOR BLADES (MRB) ON H-60M AIRCRAFT. ADDITIONALLY MRBS ARE TO BE REMOVED FROM 500 AIRCRAFT AND REPLACED AFTER THE HONTEK COATING IS REMOVED AND THE BLADES ARE REPAIRED. THE HONTEK COATING IS ALSO TO BE REMOVED FROM AN ADDITIONAL 126 SPARE MRBS.
May 10, 201812$0THIS STATEMENT OF WORK (SOW) IS FOR THE DEVELOPMENT OF A MODIFICATION WORK ORDER (MWO) FOR THE REMOVAL OF THE HONTEK COATING FROM THE MAIN ROTOR BLADES (MRB) ON H-60M AIRCRAFT. ADDITIONALLY MRBS ARE TO BE REMOVED FROM 500 AIRCRAFT AND REPLACED AFTER THE HONTEK COATING IS REMOVED AND THE BLADES ARE REPAIRED. THE HONTEK COATING IS ALSO TO BE REMOVED FROM AN ADDITIONAL 200 SPARE MRBS. THIS COST PLUS FIXED FEE EFFORT HAS A 24 MONTH PERIOD OF PERFORMANCE.
Dec 5, 201611$-436.6KIGF::OT::IGF INCORPORATION OF A REVISED STATEMENT OF WORK (SOW) AND DE-OBLIGATION OF APPLICABLE FUNDING. THIS EFFORT IS FOR THE DEVELOPMENT OF A MODIFICATION WORK ORDER (MWO) FOR THE REMOVAL OF THE HONTEK COATING FROM THE MAIN ROTOR BLADES (MRB) ON H-60M AIRCRAFT. ADDITIONALLY MRBS ARE TO BE REMOVED FROM 500 AIRCRAFT AND REPLACED AFTER THE HONTEK COATING IS REMOVED AND THE BLADES ARE REPAIRED. THE HONTEK COATING IS ALSO TO BE REMOVED FROM AN ADDITIONAL 126 SPARE MRBS.
Dec 5, 201611$-54.1KIGF::OT::IGF INCORPORATION OF A REVISED STATEMENT OF WORK (SOW) AND DE-OBLIGATION OF APPLICABLE FUNDING. THIS EFFORT IS FOR THE DEVELOPMENT OF A MODIFICATION WORK ORDER (MWO) FOR THE REMOVAL OF THE HONTEK COATING FROM THE MAIN ROTOR BLADES (MRB) ON H-60M AIRCRAFT. ADDITIONALLY MRBS ARE TO BE REMOVED FROM 500 AIRCRAFT AND REPLACED AFTER THE HONTEK COATING IS REMOVED AND THE BLADES ARE REPAIRED. THE HONTEK COATING IS ALSO TO BE REMOVED FROM AN ADDITIONAL 126 SPARE MRBS.
Mar 31, 201610$0IGF::OT::IGF PERIOD OF PERFORMANCE EXTENSION
May 28, 20159$119.9KIGF::OT::IGF: OPTION EXERCISE OF EXISTING OPTIONS 3 THROUGH 9.
Apr 9, 20158$33.9KIGF::OT::IGF NIP EXERCISE OPTIONS 1&2
Apr 9, 20158$371.5KIGF::OT::IGF: OEP 17480 COST IMPACT AND POP EXTENSION
Feb 19, 20157$0IGF::OT::IGF: NIP ADD COR ALTERNATE
Dec 10, 20146$0REALLOCATION OF FUNDS
Jun 18, 20145$17.3KCOST IMPACT 16542
Apr 21, 20144$1.8MOEP 16175 COST IMPACT HONTEK REMOVAL
Jan 31, 20143$72.2KEXERCISE OPTIONS 2 AND 3
Jul 23, 20132$35.6KIGF::OT::IGF: OEP 15085 COST IMPACT TO H-60M HONTEK REMOVAL - BASE AND 3 OPTIONS
Mar 20, 20131$17.4MDEFINITIZATION OF ORDER 0079
Jan 24, 20130$5.9MOEP 14235 - H-60M HONTEK REMOVAL
Jan 24, 20130$0IGF::OT::IGF: CORRECTIVE CAR

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.