Federal contract award
0404
ORDER 0404 FOR UH-60L
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RSA |
| NAICS | 336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| PSC | J016 — Maintenance, Repair and Rebuilding of Equipment: Aircraft Components and Accessories |
| Parent award / vehicle | W58RGZ12D0089 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $1.8M |
| Current contract value | $1.8M |
| Potential contract value / ceiling | $1.8M |
| Start date | Sep 16, 2014 |
| Current end date | Apr 30, 2017 |
| Potential end date | Apr 30, 2017 |
| Latest award activity | Apr 15, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 15, 2026 | 9 | $-39.1K | UH-60L ELECTRONIC STANDBY INSTRUMENT SYSTEM (ESIS) |
| Jan 25, 2017 | 8 | $0 | IGF::OT::IGF THIS MODIFICATION IS FOR A PERIOD OF PERFORMANCE EXTENSION IN ORDER FOR THE GOVERNMENT TO REVIEW AND PROVIDE FINAL APPROVAL ON THE DATA PACKAGE AND MAKE NECESSARY CHANGES. THE STATEMENT OF WORK DESCRIBES THE EFFORT AS THE INTEGRATION AND QUALIFICATION OF AN ELECTRONIC STANDBY INSTRUMENT SYSTEM IN THE UH-60L. THE UH-60L CURRENTLY HAS A FIBER OPTIC GYRO (FOG) SYSTEM THAT CAN BE INSTALLED IN A SINGLE OR A DUAL CONFIGURATION. |
| Dec 19, 2016 | 7 | $0 | IGF::OT::IGF POP EXTENSION THIS STATEMENT OF WORK (SOW) IS FOR THE INTEGRATION AND QUALIFICATION OF AN ELECTRONIC STANDBY INSTRUMENT SYSTEM IN THE UH-60L. THE UH-60L CURRENTLY HAS A FIBER OPTIC GYRO (FOG) SYSTEM THAT CAN BE INSTALLED IN A SINGLE OR A DUAL CONFIGURATION. DURING FIELDING, THE BLACKHAWK FLEET EXPERIENCED MULTIPLE DUAL FAILURES OF THE FOGS IN THE DUAL INSTALLATION CONFIGURATION. TO OFFSET THE EFFECTS OF A DUAL FOG FAILURE, THE UH-60L FLEET IS NOW EQUIPPED WITH A BACKUP ATTITUDE INDICATOR (BAI), THE GH-4001 CONFIGURED TO SHOW THE ATTITUDE INDICATOR AND THE SLIP/SKID INDICATOR ONLY. THIS BACK-UP SYSTEM PROVIDES ATTITUDE INFORMATION TO THE PILOTS IN THE EVENT A SINGLE/DUAL FOG FAILURE OCCURS. THIS EFFORT IS FOR THE DESIGN, INTEGRATION AND QUALIFICATION ACTIVITIES NEEDED TO INTEGRATE THE GH-4001 ON A UH-60L AS A FULL FUNCTIONALITY ELECTRONIC STANDBY INSTRUMENT SYSTEM (ESIS) INCLUDING ATTITUDE INDICATION, SLIP/SKID INDICATION, AIRSPEED, HEADING, ALTITUDE, AND VERTICAL SPEED. |
| Jul 27, 2016 | 6 | $0 | IGF::OT::IGF NO COST STATEMENT OF WORK REVISION TO ADD AN CONTRACT DATA REQUIREMENTS LIST (CDRL) FOR A VERIFICATION REPORT. |
| Jun 9, 2016 | 5 | $0 | IGF::OT::IGF MOD TO INCORPORATE NO COST STATEMENT OF WORK (SOW) REVISION IN SUPPORT OF UH-60L ELECTRONIC STANDBY INSTRUMENT SYSTEM (ESIS) |
| Feb 8, 2016 | 4 | $0 | IGF::OT::IGF PERIOD OF PERFORMANCE EXTENSION AND COR CHANGE. |
| Jun 4, 2015 | 3 | $0 | IGF::OT::IGF PERIOD OF PERFORMANCE EXTENSION. |
| Dec 2, 2014 | 2 | $0 | UPDATE STATEMENT OF WORK. |
| Sep 18, 2014 | 1 | $0 | IGF::OT::IGF |
| Sep 16, 2014 | 0 | $1.9M | ORDER 0404 FOR UH-60L |