Federal contract award
12048924F0100
THE PROJECT WORK CONSISTS OF ROADWAY RECONDITIONING, ROADSIDE BRUSHING, DITCH AND CULVERT RECONDITIONING, DRAINAGE DIP CONSTRUCTION, ARMORED DIP CONSTRUCTION, SLUMP REMOVAL, AND SURFACE AGGREGATE PLACEMENT. EROSION CONTROL MEASURES WILL BE NECESSARY
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Agriculture |
| Office | USDA FOREST SERVICE-SPOC NW |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 1205M620D0004 |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $326.9K |
| Current contract value | $326.9K |
| Potential contract value / ceiling | $326.9K |
| Start date | Aug 27, 2024 |
| Current end date | Jul 1, 2026 |
| Potential end date | Jul 1, 2026 |
| Latest award activity | Sep 22, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 22, 2025 | P00002 | $0 | THE PROJECT WORK CONSISTS OF ROADWAY RECONDITIONING, ROADSIDE BRUSHING, DITCH AND CULVERT RECONDITIONING, DRAINAGE DIP CONSTRUCTION, ARMORED DIP CONSTRUCTION, SLUMP REMOVAL, AND SURFACE AGGREGATE PLACEMENT. EROSION CONTROL MEASURES WILL BE NECESSARY |
| Jan 23, 2025 | P00001 | $0 | THE PROJECT WORK CONSISTS OF ROADWAY RECONDITIONING, ROADSIDE BRUSHING, DITCH AND CULVERT RECONDITIONING, DRAINAGE DIP CONSTRUCTION, ARMORED DIP CONSTRUCTION, SLUMP REMOVAL, AND SURFACE AGGREGATE PLACEMENT. EROSION CONTROL MEASURES WILL BE NECESSARY |
| Aug 27, 2024 | 0 | $326.9K | THE PROJECT WORK CONSISTS OF ROADWAY RECONDITIONING, ROADSIDE BRUSHING, DITCH AND CULVERT RECONDITIONING, DRAINAGE DIP CONSTRUCTION, ARMORED DIP CONSTRUCTION, SLUMP REMOVAL, AND SURFACE AGGREGATE PLACEMENT. EROSION CONTROL MEASURES WILL BE NECESSARY |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.