Federal contract award

1232SA25P0112

REMOVAL OF EXISTING SUBSURFACE DRAINAGE EAST OF THE PARKING LOT AND CULVERT AS WELL AS A TREE ADJACENT TO THE GREENHOUSE. INSTALL A MINIMUM 12IN, 50FT CORRUGATED METAL PIPE (CMP) STEEL CULVERT FALLOWING MANUFACTURERS RECOMMENDATIONS AND THE NATIONA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Agriculture
OfficeUSDA ARS AFM APD
NAICS237310 — Highway, Street, and Bridge Construction
PSCZ2LB — REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$35.0K
Current contract value$35.0K
Potential contract value / ceiling$35.0K
Start dateJul 17, 2025
Current end dateOct 31, 2025
Potential end dateOct 31, 2025
Latest award activitySep 26, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 26, 2025P00001$0REMOVAL OF EXISTING SUBSURFACE DRAINAGE EAST OF THE PARKING LOT AND CULVERT AS WELL AS A TREE ADJACENT TO THE GREENHOUSE. INSTALL A MINIMUM 12IN, 50FT CORRUGATED METAL PIPE (CMP) STEEL CULVERT FALLOWING MANUFACTURERS RECOMMENDATIONS AND THE NATIONA
Jul 17, 20250$35.0KREMOVAL OF EXISTING SUBSURFACE DRAINAGE EAST OF THE PARKING LOT AND CULVERT AS WELL AS A TREE ADJACENT TO THE GREENHOUSE. INSTALL A MINIMUM 12IN, 50FT CORRUGATED METAL PIPE (CMP) STEEL CULVERT FALLOWING MANUFACTURERS RECOMMENDATIONS AND THE NATIONA

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
David ReynoldsContactdavid.reynolds2@usda.govSourceJun 25, 2025

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.