Federal contract award

1232SA25P0588

ENABLE PRECISE CONTROL OF WATER FLOW RATES AND RETENTION TIMES TO OPTIMIZE P REMOVAL EFFICIENCY, WHILE REMOTELY RECORDING, STORING, AND TRANSMITTING FLOW DATA FROM FIELD LOCATIONS ACROSS CENTRAL IOWA.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Agriculture
OfficeUSDA ARS AFM APD
NAICS332999 — All Other Miscellaneous Fabricated Metal Product Manufacturing
PSC4730 — Hose, Pipe, Tube, Lubrication, and Railing Fittings
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$41.1K
Current contract value$41.1K
Potential contract value / ceiling$41.1K
Start dateSep 29, 2025
Current end dateJan 30, 2026
Potential end dateJan 30, 2026
Latest award activityApr 21, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 21, 2026P00002$-135ENABLE PRECISE CONTROL OF WATER FLOW RATES AND RETENTION TIMES TO OPTIMIZE P REMOVAL EFFICIENCY, WHILE REMOTELY RECORDING, STORING, AND TRANSMITTING FLOW DATA FROM FIELD LOCATIONS ACROSS CENTRAL IOWA.
Nov 21, 2025P00001$0ENABLE PRECISE CONTROL OF WATER FLOW RATES AND RETENTION TIMES TO OPTIMIZE P REMOVAL EFFICIENCY, WHILE REMOTELY RECORDING, STORING, AND TRANSMITTING FLOW DATA FROM FIELD LOCATIONS ACROSS CENTRAL IOWA.
Sep 29, 20250$41.2KENABLE PRECISE CONTROL OF WATER FLOW RATES AND RETENTION TIMES TO OPTIMIZE P REMOVAL EFFICIENCY, WHILE REMOTELY RECORDING, STORING, AND TRANSMITTING FLOW DATA FROM FIELD LOCATIONS ACROSS CENTRAL IOWA.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Tucker DavisContacttucker.davis@usda.govSourceSep 17, 2025
Kristine StoutContactKristine.Stout@usda.govSourceSep 17, 2025

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.