Federal contract award
1240BH24F0041
REPLACING CULVERTS ON FSR 26 (CRYSTAL CREEK) AT MP 2.14 AND FSR 2810041 (YELLOWJACKET CREEK) AT MP 0.06, WITH BRIDGE AOPS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Agriculture |
| Office | USDA-FS, CSA NORTHWEST 6 |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 1240BH23D0029 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.8M |
| Current contract value | $1.8M |
| Potential contract value / ceiling | $1.8M |
| Start date | Jul 30, 2024 |
| Current end date | Nov 30, 2026 |
| Potential end date | Feb 26, 2027 |
| Latest award activity | Mar 31, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 31, 2026 | P00002 | $0 | REPLACING CULVERTS ON FSR 26 (CRYSTAL CREEK) AT MP 2.14 AND FSR 2810041 (YELLOWJACKET CREEK) AT MP 0.06, WITH BRIDGE AOPS. MODIFICATION 02 IS A NO-COST MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE TO SEPTEMBER 30, 2026. THIS PERIOD OF PERFORMANCE |
| Jul 30, 2025 | P00001 | $182.8K | REPLACING CULVERTS ON FSR 26 (CRYSTAL CREEK) AT MP 2.14 AND FSR 2810041 (YELLOWJACKET CREEK) AT MP 0.06, WITH BRIDGE AOPS. MODIFICATION 01 REMOBILIZES PILE DRIVING EQUIPMENT, FURNISHES AND DRIVES ADDITIONAL PILE LENGTH FOR YELLOWJACKET BRIDGE FOUNDAT |
| Jul 30, 2024 | 0 | $1.6M | REPLACING CULVERTS ON FSR 26 (CRYSTAL CREEK) AT MP 2.14 AND FSR 2810041 (YELLOWJACKET CREEK) AT MP 0.06, WITH BRIDGE AOPS. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-02-26 (124 days from calculation)
- +35 points
- 145 historical awards in this buyer and category group
- +15 points
- 3 recorded award transactions
- +5 points
- Latest award action: 2026-03-31
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.