Federal contract award
1240LT25P0004
ATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Agriculture |
| Office | USDA-FS, CSA INTERMOUNTAIN 8 |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $148.3K |
| Current contract value | $148.3K |
| Potential contract value / ceiling | $148.3K |
| Start date | Jul 14, 2025 |
| Current end date | Jul 31, 2026 |
| Potential end date | Jul 31, 2026 |
| Latest award activity | Jan 30, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jan 30, 2026 | P00003 | $0 | P00003 - THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE 261 DAYS UNTIL 07/31/2026, CONSIDERATION OFFERED AND ACCEPTED. THIS MODIFICATION ALSO CHANGES THE COR FROM DAKOTA KRIST TO JORDAN BURGE WITHIN IAS TO MATCH COR DESIGNATI |
| Jul 3, 2025 | P00002 | $0 | ATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A |
| May 20, 2025 | P00001 | $148.3K | ATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A |
| Mar 14, 2025 | 0 | $0 | ATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| Elizabeth Ratcliff | Contact | elizabeth.ratcliff@usda.gov | Source | Feb 28, 2025 |
| Elizabeth Ratcliff | Contact | elizabeth.ratcliff@usda.gov | Source | Feb 28, 2025 |
| Elizabeth Ratcliff | Contact | elizabeth.ratcliff@usda.gov | Source | Dec 16, 2024 |
| Elizabeth Ratcliff | Contact | elizabeth.ratcliff@usda.gov | Source | Dec 16, 2024 |
| Elizabeth Ratcliff | Contact | elizabeth.ratcliff@usda.gov | Source | Dec 10, 2024 |
| Elizabeth Ratcliff | Contact | elizabeth.ratcliff@usda.gov | Source | Nov 15, 2024 |