Federal contract award

1240LT25P0004

ATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Agriculture
OfficeUSDA-FS, CSA INTERMOUNTAIN 8
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$148.3K
Current contract value$148.3K
Potential contract value / ceiling$148.3K
Start dateJul 14, 2025
Current end dateJul 31, 2026
Potential end dateJul 31, 2026
Latest award activityJan 30, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jan 30, 2026P00003$0P00003 - THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE 261 DAYS UNTIL 07/31/2026, CONSIDERATION OFFERED AND ACCEPTED. THIS MODIFICATION ALSO CHANGES THE COR FROM DAKOTA KRIST TO JORDAN BURGE WITHIN IAS TO MATCH COR DESIGNATI
Jul 3, 2025P00002$0ATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A
May 20, 2025P00001$148.3KATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A
Mar 14, 20250$0ATHIS PROJECT CONSISTS OF DESIGN (TAKING THE GOVERNMENT DRAWINGS TO A FABRICATOR AND HAVING THEM DO SHOP DRAWINGS), PURCHASING, DELIVERING, AND INSTALLING A 27-FOOT SPAN GLULAM TIMBER TRAIL BRIDGE WITH METAL RAILING. THE SITE IS ROUGHLY ONE MILE UP A

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Elizabeth RatcliffContactelizabeth.ratcliff@usda.govSourceFeb 28, 2025
Elizabeth RatcliffContactelizabeth.ratcliff@usda.govSourceFeb 28, 2025
Elizabeth RatcliffContactelizabeth.ratcliff@usda.govSourceDec 16, 2024
Elizabeth RatcliffContactelizabeth.ratcliff@usda.govSourceDec 16, 2024
Elizabeth RatcliffContactelizabeth.ratcliff@usda.govSourceDec 10, 2024
Elizabeth RatcliffContactelizabeth.ratcliff@usda.govSourceNov 15, 2024

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.