Federal contract award
1240LU23F0162
OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT ON USFS TRANSPORTATION SYSTEMS. WORK INCLUDES A SITE VISIT, SITE SURVEY, HYDRALIC ANALYSIS, GEOTECHNICAL INVESTIGATION, PRELIMINARY AND FINAL DESIGN, A PS&E PACKAGE.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Agriculture |
| Office | USDA-FS, CSA INTERMOUNTAIN 9 |
| NAICS | 541330 — Engineering Services |
| PSC | C220 — ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING |
| Parent award / vehicle | 12034320D0041 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $287.7K |
| Current contract value | $287.7K |
| Potential contract value / ceiling | $287.7K |
| Start date | Sep 29, 2023 |
| Current end date | Jan 15, 2026 |
| Potential end date | Jan 15, 2026 |
| Latest award activity | Mar 18, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 18, 2026 | P00003 | $-0 | OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT ON USFS TRANSPORTATION SYSTEMS. WORK INCLUDES A SITE VISIT, SITE SURVEY, HYDRALIC ANALYSIS, GEOTECHNICAL INVESTIGATION, PRELIMINARY AND FINAL DESIGN, A PS&E PACKAGE. |
| Mar 6, 2025 | P00002 | $29.5K | OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT ON USFS TRANSPORTATION SYSTEMS. WORK INCLUDES A SITE VISIT, SITE SURVEY, HYDRALIC ANALYSIS, GEOTECHNICAL INVESTIGATION, PRELIMINARY AND FINAL DESIGN, A PS&E PACKAGE. |
| Feb 22, 2024 | P00001 | $48.1K | OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT ON USFS TRANSPORTATION SYSTEMS. WORK INCLUDES A SITE VISIT, SITE SURVEY, HYDRALIC ANALYSIS, GEOTECHNICAL INVESTIGATION, PRELIMINARY AND FINAL DESIGN, A PS&E PACKAGE. |
| Sep 29, 2023 | 0 | $210.1K | OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT ON USFS TRANSPORTATION SYSTEMS. WORK INCLUDES A SITE VISIT, SITE SURVEY, HYDRALIC ANALYSIS, GEOTECHNICAL INVESTIGATION, PRELIMINARY AND FINAL DESIGN, A PS&E PACKAGE. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.