Federal contract award
1240LU24F0085
DURING EXCAVATION OF THE SEPTIC TANK, THE LINES WERE DISCOVERED TO BE NEEDING REPLACED AS SOON AS POSSIBLE. DURING EXCAVATION, A TEMPORARY REPAIR WAS PLACED BETWEEN THE TANK AND THE LINES. DUE TO THE AMOUNT OF EXCAVATION NEEDED FOR THE LINES, ASPHALT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Agriculture |
| Office | USDA-FS, CSA INTERMOUNTAIN 9 |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Z1LB — MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS |
| Parent award / vehicle | 12034319D0031 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $110.7K |
| Current contract value | $110.7K |
| Potential contract value / ceiling | $110.7K |
| Start date | Sep 26, 2024 |
| Current end date | Jun 20, 2025 |
| Potential end date | Jun 20, 2025 |
| Latest award activity | Jun 5, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 5, 2025 | P00001 | $27.1K | DURING EXCAVATION OF THE SEPTIC TANK, THE LINES WERE DISCOVERED TO BE NEEDING REPLACED AS SOON AS POSSIBLE. DURING EXCAVATION, A TEMPORARY REPAIR WAS PLACED BETWEEN THE TANK AND THE LINES. DUE TO THE AMOUNT OF EXCAVATION NEEDED FOR THE LINES, ASPHALT |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.