Federal contract award

1240LU25F0089

THE INTENT OF THIS TASK ORDER IS TO OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT OF TWO UNITED STATE FOREST SERVICE (USFS) TRANSPORTATION SYSTEM STRUCTURES. WORK INCLUDES A SITE VISIT, TOPOGRAPHIC SITE SURVEY, HYDRAULIC ANALYSIS, GEOTECHNICAL INVEST

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Agriculture
OfficeUSDA-FS, CSA INTERMOUNTAIN 9
NAICS541330 — Engineering Services
PSCC220 — ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING
Parent award / vehicle12034320D0037
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$97.8K
Current contract value$97.8K
Potential contract value / ceiling$97.8K
Start dateSep 25, 2025
Current end dateJun 22, 2026
Potential end dateJun 22, 2026
Latest award activityMay 22, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 22, 2026P00002$0THE INTENT OF THIS TASK ORDER IS TO OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT OF TWO UNITED STATE FOREST SERVICE (USFS) TRANSPORTATION SYSTEM STRUCTURES. WORK INCLUDES A SITE VISIT, TOPOGRAPHIC SITE SURVEY, HYDRAULIC ANALYSIS, GEOTECHNICAL INVEST
Feb 24, 2026P00001$0THE INTENT OF THIS TASK ORDER IS TO OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT OF TWO UNITED STATE FOREST SERVICE (USFS) TRANSPORTATION SYSTEM STRUCTURES. WORK INCLUDES A SITE VISIT, TOPOGRAPHIC SITE SURVEY, HYDRAULIC ANALYSIS, GEOTECHNICAL INVEST
Sep 30, 20250$97.8KTHE INTENT OF THIS TASK ORDER IS TO OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT OF TWO UNITED STATE FOREST SERVICE (USFS) TRANSPORTATION SYSTEM STRUCTURES. WORK INCLUDES A SITE VISIT, TOPOGRAPHIC SITE SURVEY, HYDRAULIC ANALYSIS, GEOTECHNICAL INVEST

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.