Federal contract award

12444125P0029

CRITICAL REPAIRS TO THE WASTEWATER SYSTEM AT THE LEITH RUN CAMPGROUND. THREE LIFT STATIONS ARE CURRENTLY NON-FUNCTIONAL AND RESULTING IN THE REDUCTION OF SERVICES AT THE CAMPGROUND. REQUIRED REPAIRS INCLUDE CONTROL PANEL REPLACEMENT, FLOAT SYSTEM REP

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Agriculture
OfficeUSDA-FS, CSA EAST 3
NAICS562991 — Septic Tank and Related Services
PSCJ045 — Maintenance, Repair and Rebuilding of Equipment: Plumbing, Heating, and Waste Disposal Equipment
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$46.8K
Current contract value$46.8K
Potential contract value / ceiling$46.8K
Start dateSep 17, 2025
Current end dateDec 16, 2025
Potential end dateDec 16, 2025
Latest award activitySep 19, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 19, 20250$46.8KCRITICAL REPAIRS TO THE WASTEWATER SYSTEM AT THE LEITH RUN CAMPGROUND. THREE LIFT STATIONS ARE CURRENTLY NON-FUNCTIONAL AND RESULTING IN THE REDUCTION OF SERVICES AT THE CAMPGROUND. REQUIRED REPAIRS INCLUDE CONTROL PANEL REPLACEMENT, FLOAT SYSTEM REP

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Tobi ShumakerContacttobi.shumaker@usda.govSourceAug 22, 2025
Tobi ShumakerContacttobi.shumaker@usda.govSourceAug 22, 2025
Tobi ShumakerContacttobi.shumaker@usda.govSourceAug 14, 2025

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.