Federal contract award

12445124F0044

DESIGN BUILD CONSTRUCTION OF TWO AOP CROSSING STRUCTURES ON NFSR 114 ON THE WINONA RANGER DISTRICT IN SALINE COUNTY, AR.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Agriculture
OfficeUSDA-FS, CSA EAST 11
NAICS237310 — Highway, Street, and Bridge Construction
PSCZ2LB — REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Parent award / vehicle12445123D0035
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$655.4K
Current contract value$655.4K
Potential contract value / ceiling$655.4K
Start dateSep 30, 2024
Current end dateJun 30, 2026
Potential end dateJun 30, 2026
Latest award activityApr 28, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 28, 2026P00004$4.0KARKANSAS SOUTH MATOC DB TWO AOP STRUCTURES NFSR 114 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE MANDATORY CONTRACT CLAUSE FAR 52.222 90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS, AS REQUIRED BY EXECUTIVE ORDER 14398. P0004 MA
Apr 27, 2026P00003$0ARKANSAS SOUTH MATOC DB TWO AOP STRUCTURES NFSR 114 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE MANDATORY CONTRACT CLAUSE FAR 52.222 90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS, AS REQUIRED BY EXECUTIVE ORDER 14398.
Mar 30, 2026P00002$0ARKANSAS SOUTH MATOC DB TWO AOP STRUCTURES NFSR 114 PRE-NRE: NO COST EXTENSION DOGE NOT REQUIRED
Sep 9, 2025P00001$0ARKANSAS SOUTH MATOC DB TWO AOP STRUCTURES NFSR 114 PRE-NRE: NO COST EXTENSION DOGE NOT REQUIRED
Sep 24, 20240$651.4KDESIGN BUILD CONSTRUCTION OF TWO AOP CROSSING STRUCTURES ON NFSR 114 ON THE WINONA RANGER DISTRICT IN SALINE COUNTY, AR.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.