Federal contract award
12445224C0025
REPAIRS TO THIRTEEN (13) DAMAGED TRAIL SITES. THE GOVT. FURNISHED A DESIGN-BID-BUILD TO A TOTAL OF NINE (9) OF THE DAMAGED SITES, MISCELLANEOUS TRAIL SPOT SURFACING TO APPROX. TWO (2) SITES, AND THE REMAINING LAST TWO (2) SITES WILL REQUIRE A CONTRAC
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Agriculture |
| Office | USDA-FS, CSA EAST 12 |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $4.9M |
| Current contract value | $4.9M |
| Potential contract value / ceiling | $4.9M |
| Start date | Jul 8, 2024 |
| Current end date | Dec 26, 2026 |
| Potential end date | Dec 26, 2026 |
| Latest award activity | Feb 24, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Feb 24, 2026 | P00005 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO FINISH THIS ERFO TRAIL REPAIR IN ITS ENTIRETY MAKING IT MORE RESILIENT FOR FUTURE STORM EVENTS. |
| Dec 17, 2025 | P00004 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO FINISH THIS ERFO TRAIL REPAIR IN ITS ENTIRETY MAKING IT MORE RESILIENT FOR FUTURE STORM EVENTS. |
| Feb 24, 2025 | P00003 | $544.8K | THE PURPOSE OF THIS MODIFICATION IS TO FINISH THIS ERFO TRAIL REPAIR IN ITS ENTIRETY MAKING IT MORE RESILIENT FOR FUTURE STORM EVENTS. |
| Oct 20, 2024 | P00002 | $146.3K | THE PURPOSE OF THIS MODIFICATION IS FOR DIFFERING SITE CONDITIONS CAUSED DURING TROPICAL STORM ERNESTO. |
| Aug 7, 2024 | P00001 | $247.8K | WORK CONSISTING OF CONTRACTOR ADDRESSING THE DIFFERING SITE CONDITIONS AREAS AS APPOINTED BY THE C.O. AND/OR DESIGNATED COR. WORK CONSISTS OF BUT NOT LIMITED TO EROSION CONTROL, EXCAVATION OF UNSUITABLE MATERIAL, REMOVAL OF UNSUITABLE MATERIAL, GEOTE |
| Jun 28, 2024 | 0 | $4.0M | REPAIRS TO THIRTEEN (13) DAMAGED TRAIL SITES. THE GOVT. FURNISHED A DESIGN-BID-BUILD TO A TOTAL OF NINE (9) OF THE DAMAGED SITES, MISCELLANEOUS TRAIL SPOT SURFACING TO APPROX. TWO (2) SITES, AND THE REMAINING LAST TWO (2) SITES WILL REQUIRE A CONTRAC |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2026-12-26 (62 days from calculation)
- +35 points
- 3 historical awards in this buyer and category group
- +10 points
- 6 recorded award transactions
- +10 points
- Latest award action: 2026-02-24
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.