Federal contract award

12445525C0022

THE PURPOSE OF THIS CONTRACT IS TO FIX DRAINAGE PROBLEM AREAS DUE TO THE2023 MAY FLOOD EVENT ON FR13. THE PROJECT SHALL CONSIST OF REMOVING CULVERT, INSTALL NEW CULVERTS, CONSTRUCT SPEC DITCHES, CONSTRUCT LEAD OFF DITCHES, GRADE ROAD, FILL ROAD TO E

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Agriculture
OfficeUSDA-FS, CSA EAST 13
NAICS237310 — Highway, Street, and Bridge Construction
PSCZ2LB — REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$464.5K
Current contract value$464.5K
Potential contract value / ceiling$464.5K
Start dateOct 6, 2025
Current end dateJul 2, 2026
Potential end dateJul 13, 2026
Latest award activityJun 24, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 24, 2026P00003$40.0KTHE PURPOSE OF THIS CONTRACT IS TO FIX DRAINAGE PROBLEM AREAS DUE TO THE2023 MAY FLOOD EVENT ON FR13. THE PROJECT SHALL CONSIST OF REMOVING CULVERT, INSTALL NEW CULVERTS, CONSTRUCT SPEC DITCHES, CONSTRUCT LEAD OFF DITCHES, GRADE ROAD, FILL ROAD TO E
May 13, 2026P00002$47.4KTHE PURPOSE OF THIS CONTRACT IS TO FIX DRAINAGE PROBLEM AREAS DUE TO THE2023 MAY FLOOD EVENT ON FR13. THE PROJECT SHALL CONSIST OF REMOVING CULVERT, INSTALL NEW CULVERTS, CONSTRUCT SPEC DITCHES, CONSTRUCT LEAD OFF DITCHES, GRADE ROAD, FILL ROAD TO E
Mar 20, 2026P00001$0THE PURPOSE OF THIS CONTRACT IS TO FIX DRAINAGE PROBLEM AREAS DUE TO THE2023 MAY FLOOD EVENT ON FR13. THE PROJECT SHALL CONSIST OF REMOVING CULVERT, INSTALL NEW CULVERTS, CONSTRUCT SPEC DITCHES, CONSTRUCT LEAD OFF DITCHES, GRADE ROAD, FILL ROAD TO E
Sep 23, 20250$377.0KTHE PURPOSE OF THIS CONTRACT IS TO FIX DRAINAGE PROBLEM AREAS DUE TO THE2023 MAY FLOOD EVENT ON FR13. THE PROJECT SHALL CONSIST OF REMOVING CULVERT, INSTALL NEW CULVERTS, CONSTRUCT SPEC DITCHES, CONSTRUCT LEAD OFF DITCHES, GRADE ROAD, FILL ROAD TO E

Research next steps

  1. Verify whether remaining options may extend performance beyond the current end date.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.