Federal contract award
1282B123F0151
DESIGN OF A HYDRAULIC CULVERT AT THE SITE 18.89 MILES UP THE 101 ROAD, ADJACENT TO AN AOP STRUCTURE. STREAM CHANNEL IS TOO STEEP ABOVE THIS CULVERT FOR GOOD FISH HABITAT. CULVERT SHOULD BE SIZED TO ACCOMMODATE THE 100 YEAR FLOOD FLOW EVENT, IF FISH
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Agriculture |
| Office | USDA FOREST SERVICE-SPOC IM |
| NAICS | 541330 — Engineering Services |
| PSC | C220 — ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING |
| Parent award / vehicle | 12034320D0038 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $122.2K |
| Current contract value | $122.2K |
| Potential contract value / ceiling | $122.2K |
| Start date | Sep 29, 2023 |
| Current end date | Dec 15, 2025 |
| Potential end date | Dec 15, 2025 |
| Latest award activity | Sep 16, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 16, 2025 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: 1. EXTEND THE PERIOD OF PERFORMANCE TO DECEMBER 15, 2025. |
| Sep 29, 2023 | 0 | $122.2K | DESIGN OF A HYDRAULIC CULVERT AT THE SITE 18.89 MILES UP THE 101 ROAD, ADJACENT TO AN AOP STRUCTURE. STREAM CHANNEL IS TOO STEEP ABOVE THIS CULVERT FOR GOOD FISH HABITAT. CULVERT SHOULD BE SIZED TO ACCOMMODATE THE 100 YEAR FLOOD FLOW EVENT, IF FISH |
Research next steps