Federal contract award
1305M424P0023
THE IRC NOAA BUILDING NEEDS AN ARC FLASH STUDY, WHICH HAS NEVER BEEN DONE SINCE THE BUILDING CONCEPTION. THIS IS A REQUIREMENT THAT IS NECESSARY TO PROVIDE A SAFE WORK ENVIRONMENT FOR THE PERSONNEL MAINTAINING ELECTRICAL EQUIPMENT. THIS REQUIREMENT S
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Commerce |
| Office | DEPT OF COMMERCE NOAA |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | H259 — Equipment and Materials Testing: Electrical and Electronic Equipment Components |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $127.4K |
| Current contract value | $127.4K |
| Potential contract value / ceiling | $127.4K |
| Start date | Sep 23, 2024 |
| Current end date | Apr 1, 2026 |
| Potential end date | Apr 1, 2026 |
| Latest award activity | Jan 28, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jan 28, 2026 | P26004 | $0 | REASSIGN CONTRACT SPECIALIST AND CONTRACTING OFFICER DUTIES FROM TANIA GATES TO PATRILL SMITH-MOODY, IAW FAR 52.212-4(C) |
| Sep 18, 2025 | P25003 | $0 | THE IRC NOAA BUILDING NEEDS AN ARC FLASH STUDY, WHICH HAS NEVER BEEN DONE SINCE THE BUILDING CONCEPTION. THIS IS A REQUIREMENT THAT IS NECESSARY TO PROVIDE A SAFE WORK ENVIRONMENT FOR THE PERSONNEL MAINTAINING ELECTRICAL EQUIPMENT. THIS REQUIREMENT S |
| Apr 1, 2025 | P25002 | $0 | THE IRC NOAA BUILDING NEEDS AN ARC FLASH STUDY, WHICH HAS NEVER BEEN DONE SINCE THE BUILDING CONCEPTION. THIS IS A REQUIREMENT THAT IS NECESSARY TO PROVIDE A SAFE WORK ENVIRONMENT FOR THE PERSONNEL MAINTAINING ELECTRICAL EQUIPMENT. THIS REQUIREMENT S |
| Dec 6, 2024 | P25001 | $0 | THE IRC NOAA BUILDING NEEDS AN ARC FLASH STUDY, WHICH HAS NEVER BEEN DONE SINCE THE BUILDING CONCEPTION. THIS IS A REQUIREMENT THAT IS NECESSARY TO PROVIDE A SAFE WORK ENVIRONMENT FOR THE PERSONNEL MAINTAINING ELECTRICAL EQUIPMENT. THIS REQUIREMENT S |
| Sep 23, 2024 | 0 | $127.4K | THE IRC NOAA BUILDING NEEDS AN ARC FLASH STUDY, WHICH HAS NEVER BEEN DONE SINCE THE BUILDING CONCEPTION. THIS IS A REQUIREMENT THAT IS NECESSARY TO PROVIDE A SAFE WORK ENVIRONMENT FOR THE PERSONNEL MAINTAINING ELECTRICAL EQUIPMENT. THIS REQUIREMENT S |