Federal contract award

1333ND23PNB640614

FIELD FLOW FRACTIONATION (FFF) WITH ADDITIONAL ELECTRICAL ASYMMETRIC FLOW FFF (EAF4) CAPABILITY.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Commerce
OfficeDEPT OF COMMERCE NIST
NAICS334516 — Analytical Laboratory Instrument Manufacturing
PSC6640 — Laboratory Equipment and Supplies
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$312.5K
Current contract value$351.7K
Potential contract value / ceiling$435.1K
Start dateSep 18, 2023
Current end dateDec 17, 2026
Potential end dateDec 17, 2028
Latest award activityDec 15, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 15, 2025P26001$0SUBJECT TO AVAILABILITY OF FUNDS: EXERCISE OPTION YEAR ONE (CLIN 0002), FOR THE NIST-OWNED FLOW FIELD FRACTIONATION TANDEM LIGHT SCATTERING INSTRUMENT SUITE.

Estimated positioning window

Dec 17, 2027 – Jun 17, 2028

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2028-12-17 (777 days from calculation)
+15 points
376 historical awards in this buyer and category group
+15 points
1 recorded award transactions
+0 points
Latest award action: 2025-12-15
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.