Federal contract award

140D0424F1106

SERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeIBC ACQ SVCS DIRECTORATE (00004)
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AA — CONSTRUCTION OF OFFICE BUILDINGS
Parent award / vehicle140F0822D0076
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$913.0K
Current contract value$913.0K
Potential contract value / ceiling$913.0K
Start dateSep 2, 2024
Current end dateAug 8, 2025
Potential end dateAug 8, 2025
Latest award activityApr 13, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 13, 2026P00005$0SERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM.
Jul 17, 2025P00004$0SERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM.
Apr 4, 2025P00003$0SERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM.
Dec 11, 2024P00002$0SERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM.
Nov 18, 2024P00001$0SERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM.
Aug 30, 20240$913.0KSERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Gibbs, StephanieContactstephanie_gibbs@ibc.doi.gov
0000000000
SourceMay 15, 2024

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.