Federal contract award

140D0426C0022

THIS REQUIREMENT IS FOR THE RENOVATION OF THE 1ST AND 2ND FLOORS OF BUILDING 3373 AT NSA CRANE. THE SCOPE INCLUDES DEMOLITION, FLOORING, WALL REPAIR AND PAINTING, CEILING GRID REALIGNMENT, HVAC MODIFICATIONS, ELECTRICAL AND DATA INFRASTRUCTURE UPGRAD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeIBC ACQ SVCS DIRECTORATE (00004)
NAICS236210 — Industrial Building Construction
PSCZ2EZ — REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$2.2M
Current contract value$2.2M
Potential contract value / ceiling$2.2M
Start dateFeb 6, 2026
Current end dateDec 10, 2026
Potential end dateDec 10, 2026
Latest award activityAug 31, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 31, 2026P00006$0ADMIN MOD - DATE UPDATE
Aug 19, 2026P00005$180.7KTHIS REQUIREMENT IS FOR THE RENOVATION OF THE 1ST AND 2ND FLOORS OF BUILDING 3373 AT NSA CRANE. THE SCOPE INCLUDES DEMOLITION, FLOORING, WALL REPAIR AND PAINTING, CEILING GRID REALIGNMENT, HVAC MODIFICATIONS, ELECTRICAL AND DATA INFRASTRUCTURE UPGRAD
Jul 10, 2026P00004$31.4KTHIS REQUIREMENT IS FOR THE RENOVATION OF THE 1ST AND 2ND FLOORS OF BUILDING 3373 AT NSA CRANE. THE SCOPE INCLUDES DEMOLITION, FLOORING, WALL REPAIR AND PAINTING, CEILING GRID REALIGNMENT, HVAC MODIFICATIONS, ELECTRICAL AND DATA INFRASTRUCTURE UPGRAD
May 14, 2026P00003$190.1KTHIS REQUIREMENT IS FOR THE RENOVATION OF THE 1ST AND 2ND FLOORS OF BUILDING 3373 AT NSA CRANE. THE SCOPE INCLUDES DEMOLITION, FLOORING, WALL REPAIR AND PAINTING, CEILING GRID REALIGNMENT, HVAC MODIFICATIONS, ELECTRICAL AND DATA INFRASTRUCTURE UPGRAD
Mar 2, 2026P00002$125.3KTHIS REQUIREMENT IS FOR THE RENOVATION OF THE 1ST AND 2ND FLOORS OF BUILDING 3373 AT NSA CRANE. THE SCOPE INCLUDES DEMOLITION, FLOORING, WALL REPAIR AND PAINTING, CEILING GRID REALIGNMENT, HVAC MODIFICATIONS, ELECTRICAL AND DATA INFRASTRUCTURE UPGRAD
Feb 20, 2026P00001$0THIS REQUIREMENT IS FOR THE RENOVATION OF THE 1ST AND 2ND FLOORS OF BUILDING 3373 AT NSA CRANE. THE SCOPE INCLUDES DEMOLITION, FLOORING, WALL REPAIR AND PAINTING, CEILING GRID REALIGNMENT, HVAC MODIFICATIONS, ELECTRICAL AND DATA INFRASTRUCTURE UPGRAD
Feb 6, 20260$1.7MTHIS REQUIREMENT IS FOR THE RENOVATION OF THE 1ST AND 2ND FLOORS OF BUILDING 3373 AT NSA CRANE. THE SCOPE INCLUDES DEMOLITION, FLOORING, WALL REPAIR AND PAINTING, CEILING GRID REALIGNMENT, HVAC MODIFICATIONS, ELECTRICAL AND DATA INFRASTRUCTURE UPGRAD

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2026-12-10 (46 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
7 recorded award transactions
+10 points
Latest award action: 2026-08-31
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.