140D0426C0039
REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | IBC ACQ SVCS DIRECTORATE (00004) |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT |
| Obligations | $5.3M |
| Current contract value | $5.3M |
| Potential contract value / ceiling | $5.3M |
| Start date | Jan 30, 2026 |
| Current end date | Dec 18, 2026 |
| Potential end date | Dec 18, 2026 |
| Latest award activity | Jul 15, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 15, 2026 | P00008 | $5.3K | THE PURPOSE OF THIS MODIFICATION IS TO ADD LINE ITEM 00190 TO CHANGE THE FOUNTAIN TILE SELECTION TO DISCOVERY. |
| Jun 18, 2026 | P00007 | $6.7K | THE PURPOSE OF THIS MODIFICATION IS ADD LINE ITEM 00180 TO INSTALL SKATEBOARD DETERRENTS. |
| May 27, 2026 | P00006 | $-9.4K | THE PURPOSE OF THIS MODIFICATION IS TO CANCEL LINE ITEM 00150 FOR THE SEA CONTAINER RELOCATION. |
| Apr 27, 2026 | P00005 | $-163.5K | MODIFICATION P00005 IS BEING ISSUED TO DE-OBLIGATE FUNDING FOR THE DEMOLITION OF CONCRETE BEDDING, AS IT WAS DISCOVERED AFTER THE ORIGINAL CONTRACT AWARD THAT CERTAIN CONCRETE BEDS AT THE SITE DID NOT REQUIRE DEMOLITION PREVIOUSLY ANTICIPATED. THE |
| Apr 7, 2026 | P00004 | $40.4K | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND INCIDENTALS NECESSARY TO FURNISH AND INSTALL REPLACEMENT PRECAST CONCRETE BENCH SEAT COMPONENTS, INCLUDING THE REMOVAL AND DISPOSAL OF DETERIORATED BENCH SEATS (AS REQUIRE |
| Apr 1, 2026 | P00003 | $9.4K | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND INCIDENTALS NECESSARY TO RELOCATE THE EXISTING C-CONTAINER AS REQUIRED TO MAINTAIN A CLEAR DDOT CRITICAL ROOT ZONE PATH AND SUPPORT ONGOING CONSTRUCTION SEQUENCING. THIS |
| Mar 26, 2026 | P00002 | $58.3K | REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN |
| Feb 27, 2026 | P00001 | $0 | REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN |
| Jan 30, 2026 | 0 | $5.4M | REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-12-18 (47 days from calculation)
- +35 points
- 22 historical awards in this buyer and category group
- +15 points
- 9 recorded award transactions
- +10 points
- Latest award action: 2026-07-15
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.