Federal contract award

140D0426P0028

RE-MANUFACTURED, ZERO TOTAL TIME, BRAND NAME CONTINENTAL ENGINE, IO-520D108B FOR UTILIZATION ON CESSNA 185 AIRCRAFT. INCLUDES: A NON-CONGEALING OIL COOLER, 24 VOLT STARTER, AND SPIN ON OIL FILTER.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeIBC ACQ SVCS DIRECTORATE (00004)
NAICS336412 — Aircraft Engine and Engine Parts Manufacturing
PSC1680 — Miscellaneous Aircraft Accessories and Components
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$61.8K
Current contract value$61.8K
Potential contract value / ceiling$61.8K
Start dateJan 15, 2026
Current end dateSep 30, 2026
Potential end dateSep 30, 2026
Latest award activityMay 21, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 21, 2026P00001$0RE-MANUFACTURED, ZERO TOTAL TIME, BRAND NAME CONTINENTAL ENGINE, IO-520D108B FOR UTILIZATION ON CESSNA 185 AIRCRAFT. INCLUDES: A NON-CONGEALING OIL COOLER, 24 VOLT STARTER, AND SPIN ON OIL FILTER.
Jan 15, 20260$61.8KRE-MANUFACTURED, ZERO TOTAL TIME, BRAND NAME CONTINENTAL ENGINE, IO-520D108B FOR UTILIZATION ON CESSNA 185 AIRCRAFT. INCLUDES: A NON-CONGEALING OIL COOLER, 24 VOLT STARTER, AND SPIN ON OIL FILTER.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Davis, RachaelContactrldavis@ibc.doi.gov
2084335038
SourceJan 5, 2026
Davis, RachaelContactrldavis@ibc.doi.gov
2084335038
SourceDec 22, 2025

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.