Federal contract award

140P2024C0021

THIS PROJECT WILL FUND THE DEMOLITION AND REPLACEMENT OF THE PERDIDO KEY BOARDWALK AT JOHNSON'S BEACH. THE BOARDWALK WILL BE RECONSTRUCTED IN THE SAME FOOTPRINT, UTILIZING MATERIALS RESILIENT TO STORM SURGES AND MORE STORM FREQUENCY.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeDSC CONTRACTING SERVICES DIVISION
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$2.8M
Current contract value$2.8M
Potential contract value / ceiling$2.8M
Start dateAug 7, 2024
Current end dateJun 16, 2025
Potential end dateJun 16, 2025
Latest award activityJun 13, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 13, 2025P00002$36.0KTHIS PROJECT WILL FUND THE DEMOLITION AND REPLACEMENT OF THE PERDIDO KEY BOARDWALK AT JOHNSON'S BEACH. THE BOARDWALK WILL BE RECONSTRUCTED IN THE SAME FOOTPRINT, UTILIZING MATERIALS RESILIENT TO STORM SURGES AND MORE STORM FREQUENCY.
Mar 5, 2025P00001$0THIS PROJECT WILL FUND THE DEMOLITION AND REPLACEMENT OF THE PERDIDO KEY BOARDWALK AT JOHNSON'S BEACH. THE BOARDWALK WILL BE RECONSTRUCTED IN THE SAME FOOTPRINT, UTILIZING MATERIALS RESILIENT TO STORM SURGES AND MORE STORM FREQUENCY.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.