Federal contract award
140P4224C0001
DESIGN AND INSTALLATION OF A NEW WET AND DRY FIRE SUPPRESSION SYSTEM THROUGHOUT THE EDGAR ALLAN POE NHS COMPLEX (THREE INTERCONNECTED BUILDINGS) AS REQUIRED BY NFPA 13 AND DESIGN A NEW FIRE DETECTION SYSTEM TO MEET NATIONAL FIRE PROTECTION ASSOCIATIO
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | NORTHEAST REGIONAL CONTRACTING |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) |
| Parent award / vehicle | Not reported |
| Set-aside | WOMEN OWNED SMALL BUSINESS |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $733.7K |
| Current contract value | $733.7K |
| Potential contract value / ceiling | $733.7K |
| Start date | Dec 26, 2023 |
| Current end date | May 29, 2026 |
| Potential end date | May 29, 2026 |
| Latest award activity | Apr 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 14, 2026 | P00006 | $6.0K | MODIFICATION P00006 IS FOR REPLACEMENT OF WATER DAMAGED FIRE ALARM DEVICES DUE TO FROZEN PIPES, FOR THE REPLACEMENT OF DEVICE BATTERIES AND TO EXTEND THE PERIOD OF PERFORMANCE. |
| Jan 29, 2026 | P00005 | $7.7K | MODIFICATION P00005 IS FOR REPLACEMENT OF TWO (2) STROBES AND ONE (1) DETECTOR THAT WERE DAMAGED BY EXISTING HVAC UNIT LEAK |
| Jul 28, 2025 | P00004 | $5.8K | MODIFICATION P00004 IS FOR ADDITIONAL WORK NEEDED DUE TO UNFORESEEN CONDITIONS AND THE EXCAVATION WORK COST ADJUSTMENT. |
| Apr 21, 2025 | P00003 | $6.3K | DESIGN AND INSTALLATION OF A NEW WET AND DRY FIRE SUPPRESSION SYSTEM THROUGHOUT THE EDGAR ALLAN POE NHS COMPLEX (THREE INTERCONNECTED BUILDINGS) AS REQUIRED BY NFPA 13 AND DESIGN A NEW FIRE DETECTION SYSTEM TO MEET NATIONAL FIRE PROTECTION ASSOCIATIO |
| Aug 27, 2024 | P00002 | $5.6K | DESIGN AND INSTALLATION OF A NEW WET AND DRY FIRE SUPPRESSION SYSTEM THROUGHOUT THE EDGAR ALLAN POE NHS COMPLEX (THREE INTERCONNECTED BUILDINGS) AS REQUIRED BY NFPA 13 AND DESIGN A NEW FIRE DETECTION SYSTEM TO MEET NATIONAL FIRE PROTECTION ASSOCIATIO |
| Jun 3, 2024 | P00001 | $0 | DESIGN AND INSTALLATION OF A NEW WET AND DRY FIRE SUPPRESSION SYSTEM THROUGHOUT THE EDGAR ALLAN POE NHS COMPLEX (THREE INTERCONNECTED BUILDINGS) AS REQUIRED BY NFPA 13 AND DESIGN A NEW FIRE DETECTION SYSTEM TO MEET NATIONAL FIRE PROTECTION ASSOCIATIO |
| Dec 26, 2023 | 0 | $702.3K | DESIGN AND INSTALLATION OF A NEW WET AND DRY FIRE SUPPRESSION SYSTEM THROUGHOUT THE EDGAR ALLAN POE NHS COMPLEX (THREE INTERCONNECTED BUILDINGS) AS REQUIRED BY NFPA 13 AND DESIGN A NEW FIRE DETECTION SYSTEM TO MEET NATIONAL FIRE PROTECTION ASSOCIATIO |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.