Federal contract award
140P5125C0002
THIS PROJECT SHALL REMOVE AND DISPOSE OF THE EXISTING 500K BTU BOILER AND INSTALL A SAME OR EQUIVALENT OUTDOOR RATED BOILER AND NECESSARY PLUMBING AT THE VISITOR CENTER. THE CONTRACTOR SHALL INSTALL AN ENERGY EFFICIENT BOILER UNIT, PIPING, AND ELECTR
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | SER EAST MABO(51000) |
| NAICS | 333414 — Heating Equipment (except Warm Air Furnaces) Manufacturing |
| PSC | Z2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $31.2K |
| Current contract value | $31.2K |
| Potential contract value / ceiling | $31.2K |
| Start date | Feb 7, 2025 |
| Current end date | May 9, 2025 |
| Potential end date | May 9, 2025 |
| Latest award activity | Aug 15, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 15, 2025 | P00001 | $-396 | THE PURPOSE OF THIS MODIFICATION TO DE-OBLIGATE UNLIQUIDATED FUNDS AND PERFORM CONTRACT CLOSE OUT PROCEDURES. CONTRACT LINE ITEM NUMBER IS REDUCED IN THE AMOUNT OF $396.00. THE TOTAL COST OF THE CONTRACT HAS CHANGED FROM $31,646.00 TO $31,250.0 |
| Feb 12, 2025 | 0 | $31.6K | THIS PROJECT SHALL REMOVE AND DISPOSE OF THE EXISTING 500K BTU BOILER AND INSTALL A SAME OR EQUIVALENT OUTDOOR RATED BOILER AND NECESSARY PLUMBING AT THE VISITOR CENTER. THE CONTRACTOR SHALL INSTALL AN ENERGY EFFICIENT BOILER UNIT, PIPING, AND ELECTR |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.