Federal contract award

140P5125C0020

REPLACE THE EXISTING BRIDGE AND CANOE LAUNCH AT THE CONGAREE NATIONAL PARK. PROJECT SCOPE INCLUDES REMOVING THE STEEL PEDESTRIAN BRIDGE AND THE WOOD FRAMED CANOE LAUNCH. THE BRIDGE WILL BE REPLACED WITH A WEATHERED STEEL, PRE-MANUFACTURED PEDESTRIAN

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeSER EAST MABO(51000)
NAICS238190 — Other Foundation, Structure, and Building Exterior Contractors
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$590.0K
Current contract value$590.0K
Potential contract value / ceiling$590.0K
Start dateAug 26, 2025
Current end dateAug 11, 2026
Potential end dateAug 11, 2026
Latest award activityAug 12, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 12, 2026P00002$0THE PURPOSE OF THIS MODIFICATION IS TO PERFORM CONTRACT CLOSE-OUT PROCEDURES. THE PERIOD OF PERFORMANCE DATE IS CHANGED FROM: 09/15/2025 TO 09/14/2026 TO:09/15/2025 TO 7/29/2026 TO ALLOW CONTRACT CLOSEOUT PROCEDURES.
Nov 18, 2025P00001$0THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT.
Aug 26, 20250$590.0KREPLACE THE EXISTING BRIDGE AND CANOE LAUNCH AT THE CONGAREE NATIONAL PARK. PROJECT SCOPE INCLUDES REMOVING THE STEEL PEDESTRIAN BRIDGE AND THE WOOD FRAMED CANOE LAUNCH. THE BRIDGE WILL BE REPLACED WITH A WEATHERED STEEL, PRE-MANUFACTURED PEDESTRIAN

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.