Federal contract award
140P5125C0020
REPLACE THE EXISTING BRIDGE AND CANOE LAUNCH AT THE CONGAREE NATIONAL PARK. PROJECT SCOPE INCLUDES REMOVING THE STEEL PEDESTRIAN BRIDGE AND THE WOOD FRAMED CANOE LAUNCH. THE BRIDGE WILL BE REPLACED WITH A WEATHERED STEEL, PRE-MANUFACTURED PEDESTRIAN
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | SER EAST MABO(51000) |
| NAICS | 238190 — Other Foundation, Structure, and Building Exterior Contractors |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $590.0K |
| Current contract value | $590.0K |
| Potential contract value / ceiling | $590.0K |
| Start date | Aug 26, 2025 |
| Current end date | Aug 11, 2026 |
| Potential end date | Aug 11, 2026 |
| Latest award activity | Aug 12, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 12, 2026 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO PERFORM CONTRACT CLOSE-OUT PROCEDURES. THE PERIOD OF PERFORMANCE DATE IS CHANGED FROM: 09/15/2025 TO 09/14/2026 TO:09/15/2025 TO 7/29/2026 TO ALLOW CONTRACT CLOSEOUT PROCEDURES. |
| Nov 18, 2025 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT. |
| Aug 26, 2025 | 0 | $590.0K | REPLACE THE EXISTING BRIDGE AND CANOE LAUNCH AT THE CONGAREE NATIONAL PARK. PROJECT SCOPE INCLUDES REMOVING THE STEEL PEDESTRIAN BRIDGE AND THE WOOD FRAMED CANOE LAUNCH. THE BRIDGE WILL BE REPLACED WITH A WEATHERED STEEL, PRE-MANUFACTURED PEDESTRIAN |