Federal contract award

140P5125F0006

DESIGN A 13D OR 13R FIRE SPRINKLER SYSTEM IN THE EXISTING 1500 SQUARE FOOT KOLB FARMHOUSE. COORDINATION WITH THE PARK AND REGIONAL CULTURAL RESOURCE PERSONNEL WILL BE REQUIRED. TYPE OF FIRE SPRINKLER SYSTEM TO BE USED WILL BE DETERMINED BETWEEN SCHEM

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeSER EAST MABO(51000)
NAICS541310 — Architectural Services
PSCC219 — Other Architect and Engineering Services
Parent award / vehicle140P2022D0011
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$79.2K
Current contract value$79.2K
Potential contract value / ceiling$79.2K
Start dateMay 12, 2025
Current end dateNov 19, 2025
Potential end dateNov 19, 2025
Latest award activityNov 17, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 17, 2025P00001$0THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT.
Nov 17, 2025P00002$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE AT NO ADDITIONAL COST TO THE GOVERNMENT. THE PERIOD OF PERFORMANCE IS HEREBY EXTENDED THOROUGH MARCH 02, 2026. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 13, 20250$79.2KDESIGN A 13D OR 13R FIRE SPRINKLER SYSTEM IN THE EXISTING 1500 SQUARE FOOT KOLB FARMHOUSE. COORDINATION WITH THE PARK AND REGIONAL CULTURAL RESOURCE PERSONNEL WILL BE REQUIRED. TYPE OF FIRE SPRINKLER SYSTEM TO BE USED WILL BE DETERMINED BETWEEN SCHEM

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.