Federal contract award
140P5125P0049
REPLACE GAS LINE THE EXISTING UNDERGROUND GAS LINE SUPPLYING GAS TO THE BOILER SYSTEM. THE NEW INSTALLATION WILL CONSIST OF A DEDICATED 1" GAS LINE RUNNING UNDERGROUND TO THE BOILER AND A 1-1/4" GAS LINE ENTERING THE BOILER ROOM. THE WORK W
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | SER EAST MABO(51000) |
| NAICS | 238220 — Plumbing, Heating, and Air-Conditioning Contractors |
| PSC | H947 — Other Quality Control, Testing and Inspection Services: Pipe, Tubing, Hose, and Fittings |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $5.7K |
| Current contract value | $5.7K |
| Potential contract value / ceiling | $5.7K |
| Start date | May 23, 2025 |
| Current end date | Jun 30, 2025 |
| Potential end date | Jun 30, 2025 |
| Latest award activity | May 23, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 23, 2025 | 0 | $5.7K | REPLACE GAS LINE THE EXISTING UNDERGROUND GAS LINE SUPPLYING GAS TO THE BOILER SYSTEM. THE NEW INSTALLATION WILL CONSIST OF A DEDICATED 1" GAS LINE RUNNING UNDERGROUND TO THE BOILER AND A 1-1/4" GAS LINE ENTERING THE BOILER ROOM. THE WORK W |