Federal contract award
140P8424P0109
THE NATIONAL PARK SERVICE (NPS) AT LAVA BEDS NATIONAL MONUMENT (LABE) HAS A REQUIREMENT FOR THE INSTALLATION OF FIBER OPTIC CABLES. FIBER WILL BE INSTALLED TO IMPROVE THE CONNECTIVITY BETWEEN BUILDINGS AROUND LABE HEADQUARTERS. THE PRE-EXISTING CONDU
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | PWR PORE MABO (84000) |
| NAICS | 237130 — Power and Communication Line and Related Structures Construction |
| PSC | L060 — Technical Representation Services: Fiber Optics Materials, Components, Assemblies, and Accessories |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $65.2K |
| Current contract value | $65.2K |
| Potential contract value / ceiling | $65.2K |
| Start date | Sep 17, 2024 |
| Current end date | Dec 31, 2025 |
| Potential end date | Dec 31, 2025 |
| Latest award activity | Dec 15, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 15, 2025 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT. |
| May 20, 2025 | P00001 | $4.7K | THE PURPOSE OF THIS MODIFICATION P00001 IS TO UPDATE THE PERIOD OF PERFORMANCE FROM 1/13/2025 - 4/13/2025 TO 6/5/2025 - 9/5/2025 DUE TO GOVERNMENT CAUSED DELAYS, AND TO CHANGE THE ORIGINAL COST OF PERFORMANCE WITH THE ADDITION OF $4,673.50 TO ACCOUNT |
| Sep 17, 2024 | 0 | $60.6K | THE NATIONAL PARK SERVICE (NPS) AT LAVA BEDS NATIONAL MONUMENT (LABE) HAS A REQUIREMENT FOR THE INSTALLATION OF FIBER OPTIC CABLES. FIBER WILL BE INSTALLED TO IMPROVE THE CONNECTIVITY BETWEEN BUILDINGS AROUND LABE HEADQUARTERS. THE PRE-EXISTING CONDU |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.