Federal contract award

140P8424P0109

THE NATIONAL PARK SERVICE (NPS) AT LAVA BEDS NATIONAL MONUMENT (LABE) HAS A REQUIREMENT FOR THE INSTALLATION OF FIBER OPTIC CABLES. FIBER WILL BE INSTALLED TO IMPROVE THE CONNECTIVITY BETWEEN BUILDINGS AROUND LABE HEADQUARTERS. THE PRE-EXISTING CONDU

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficePWR PORE MABO (84000)
NAICS237130 — Power and Communication Line and Related Structures Construction
PSCL060 — Technical Representation Services: Fiber Optics Materials, Components, Assemblies, and Accessories
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$65.2K
Current contract value$65.2K
Potential contract value / ceiling$65.2K
Start dateSep 17, 2024
Current end dateDec 31, 2025
Potential end dateDec 31, 2025
Latest award activityDec 15, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 15, 2025P00002$0THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT.
May 20, 2025P00001$4.7KTHE PURPOSE OF THIS MODIFICATION P00001 IS TO UPDATE THE PERIOD OF PERFORMANCE FROM 1/13/2025 - 4/13/2025 TO 6/5/2025 - 9/5/2025 DUE TO GOVERNMENT CAUSED DELAYS, AND TO CHANGE THE ORIGINAL COST OF PERFORMANCE WITH THE ADDITION OF $4,673.50 TO ACCOUNT
Sep 17, 20240$60.6KTHE NATIONAL PARK SERVICE (NPS) AT LAVA BEDS NATIONAL MONUMENT (LABE) HAS A REQUIREMENT FOR THE INSTALLATION OF FIBER OPTIC CABLES. FIBER WILL BE INSTALLED TO IMPROVE THE CONNECTIVITY BETWEEN BUILDINGS AROUND LABE HEADQUARTERS. THE PRE-EXISTING CONDU

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.