Federal contract award

140PS125P0012

NATR FIRELITE COMPACT WILDFIRE FCW-206 / DARLEY-DAVEY HONDA DRIVEN 6.5 HP PUMP / 6 ,750.00 HANNAY REEL 4000 SERIES MANUAL CRANK WITH 100' OF 3/4" BOOSTLITE HOSE WITH NOZZLE/ 70 GALLON POLY WATER TANK / COMPACT DESIGN TO FIT IN UTV WITH TA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeDOI, NPS CONOPS STRATEGIC
NAICS332999 — All Other Miscellaneous Fabricated Metal Product Manufacturing
PSC4210 — Fire Fighting Equipment
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$6.8K
Current contract value$6.8K
Potential contract value / ceiling$6.8K
Start dateAug 7, 2025
Current end dateDec 31, 2025
Potential end dateDec 31, 2025
Latest award activityAug 26, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 26, 2025P00002$0NATR FIRELITE COMPACT WILDFIRE FCW-206 / DARLEY-DAVEY HONDA DRIVEN 6.5 HP PUMP / 6 ,750.00 HANNAY REEL 4000 SERIES MANUAL CRANK WITH 100' OF 3/4" BOOSTLITE HOSE WITH NOZZLE/ 70 GALLON POLY WATER TANK / COMPACT DESIGN TO FIT IN UTV WITH TA
Aug 19, 2025P00001$0NATR FIRELITE COMPACT WILDFIRE FCW-206 / DARLEY-DAVEY HONDA DRIVEN 6.5 HP PUMP / 6 ,750.00 HANNAY REEL 4000 SERIES MANUAL CRANK WITH 100' OF 3/4" BOOSTLITE HOSE WITH NOZZLE/ 70 GALLON POLY WATER TANK / COMPACT DESIGN TO FIT IN UTV WITH TA
Aug 7, 20250$6.8KNATR FIRELITE COMPACT WILDFIRE FCW-206 / DARLEY-DAVEY HONDA DRIVEN 6.5 HP PUMP / 6 ,750.00 HANNAY REEL 4000 SERIES MANUAL CRANK WITH 100' OF 3/4" BOOSTLITE HOSE WITH NOZZLE/ 70 GALLON POLY WATER TANK / COMPACT DESIGN TO FIT IN UTV WITH TA

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.