Federal contract award

140R1021C0004

GRAND COULEE THIRD POWER PLANT CRANE CONTROLS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficePACIFIC NW REGION PN 6615
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2MD — REPAIR OR ALTERATION OF EPG FACILITIES - HYDRO
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$3.6M
Current contract value$3.6M
Potential contract value / ceiling$3.6M
Start dateJun 1, 2021
Current end dateAug 11, 2025
Potential end dateAug 11, 2025
Latest award activityJun 9, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 19 of 19 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026P00018$0GRAND COULEE THIRD POWERPLANT CRANE CONTROLS MODIFICATIONS, GRAND COULEE POWER OFFICE, GRAND COULEE, WA - P00018 CLOSEOUT
Apr 11, 2025P00017$197.1KBILATERAL MODIFICATION FOR MULTIPLE CHANGES ALL WITHIN THE ORIGINAL SCOPE OF THE CONTRACT.
Jan 7, 2025P00016$-130.0KMOD P00016 IS A BILATERAL MODIFICATION REVISE DUE DATES FOR CERTAIN SUBMITTALS AND DE-SCOPE THE MOBILE CRANES FROM THE CONTRACT.
Dec 31, 2024P00015$-174.5KMOD P00015 IS A BILATERAL MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FROM DECEMBER 31, 2024, TO JUN 16, 2025.
Aug 27, 2024P00014$0MOD P00014 IS A BI-LATERAL NO COST MODIFICATION TO INCORPORATE CHANGES IN SPEC SECTION 26 01 01 GENERAL ELECTRICAL REHABILITATION IN RESPONSE TO RFI 070 AND 09 96 21 COATINGS IN RESPONSE TO RFIS 071 & 075.
Jul 23, 2024P00013$-143.7KMOD P00013 IS A BILATERAL MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FROM AUGUST 27, 2024 TO DECEMBER 31, 2024.
Mar 4, 2024P00012$6.7KBILATERAL MODIFICATION TO EXTEND THE WARRANTY ON PARTS FOR THE WPP 70T CRANE CONTROLS.
Nov 14, 2023P00011$-1.6KMODIFICATION P00011 IS A BILATERAL MODIFICATION TO DEFINITIZE P00008.
Aug 29, 2023P00010$0THE PURPOSE OF THIS MODIFICATION IS INCORPORATE CHANGES IN SPEC SECTION 14 63 01 AND SPEC SECTION 26 01 01.
Jun 15, 2023P00009$504.3KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AN EQUITABLE ADJUSTMENT TO THE CONTRACTOR FOR 317 COMPENSABLE DELAY DAYS DUE TO A GOVERNMENT DIRECTED SUSPENSION.
Apr 18, 2023P00008$341.4KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE THE CONTRACTOR ADDITIONAL FUNDS ASSOCIATED WITH THE CHANGES IN SPECIFICATIONS, DRAWINGS, AND GOVERNMENT RESPONSE TO RFI 020 EQUIPMENT HOUSE.
Mar 14, 2023P00007$-4.8KMOD P00007 IS A BILATERAL MODIFICATION TO DEFINITIZE MODIFICATION'S P00003 AND P00005.
Jan 6, 2023P00006$4.1KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE REVISIONS TO SPECIFICATIONS BASED UPON RESPONSES TO RFIS 54-56 AND THE SUBMITTAL REGISTER.
Oct 26, 2022P00005$0P00005 IS A UNILATERAL MODIFICATION IN ACCORDANCE WITH FAR CLAUSE 52.243-4 CHANGES (JUNE 2007). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE CORRECT DRAWINGS/SPECIFICATIONS INTO THE CONTRACT
Sep 26, 2022P00004$0P00004 IS A UNILATERAL MODIFICATION IN ACCORDANCE WITH FAR CLAUSE 52.243-4 CHANGES (JUNE 2007). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES TO SPECIFICATION 14 63 02 SECTION 1.22.
Sep 8, 2022P00003$67.2KP00003 IS A UNILATERAL MODIFICATION IN ACCORDANCE WITH FAR CLAUSE 52.243-4 CHANGES (JUNE 2007). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES TO THE SPECIFICATIONS AND DRAWINGS.
Dec 7, 2021P00002$0THIS MODIFICATION HAS UPDATED THE PERIOD OF PERFORMANCE TO 06/10/2021 THROUGH 10/23/2023 TO REFLECT COMPLETION 500 DAYS AFTER RECEIPT OF NOTICE TO PROCEED, IN ACCORDANCE WITH THE ORIGINAL TERMS AND CONDITIONS OF THE CONTRACT.
Jul 23, 2021P00001$0NEW DELIVERY DATES FOR SUBMITTALS PRIOR TO CONTRACTOR ARRIVAL ON SITE.
Jun 1, 20210$3.0MGRAND COULEE THIRD POWER PLANT CRANE CONTROLS

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Everett, JamesContactjeverett@usbr.gov
2083785181
SourceMar 9, 2021
Everett, JamesContactjeverett@usbr.govSourceJan 21, 2021

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.