Federal contract award

140R1024C0002

KACHESS DAM MODIFICATION PHASE 3 YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficePACIFIC NW REGION PN 6615
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2KA — REPAIR OR ALTERATION OF DAMS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$18.7M
Current contract value$18.7M
Potential contract value / ceiling$18.7M
Start dateApr 2, 2024
Current end dateAug 27, 2026
Potential end dateDec 31, 2026
Latest award activityAug 17, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 29 of 29 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 17, 2026P00028$46.6KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
May 28, 2026P00027$0WORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
May 7, 2026P00026$36.5KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Apr 7, 2026P00024$51.3KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Apr 7, 2026P00025$14.3KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Mar 16, 2026P00023$48.0KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Mar 2, 2026P00021$78.9KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Mar 2, 2026P00022$16.1KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Feb 10, 2026P00020$8.5KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Jan 21, 2026P00019$0WORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Jan 14, 2026P00018$67.7KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Dec 17, 2025P00017$172.4KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - CMP 015 ADDITIONAL OUTLET WORKS REA
Sep 11, 2025P00016$138.0KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - DEFINITIZATION OF P00006 REVISED SPECS AND DRAWINGS
Aug 28, 2025P00015$90.8KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - DEFINITIZATION OF P00006 REVISED SPECS AND DRAWINGS
Aug 27, 2025P00014$338.7KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - ANCHOR BOLT HOLES FILL WITH EPOXY CHANGE ORDER
May 6, 2025P00013$22.8KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - ANCHOR BOLT HOLES FILL WITH EPOXY CHANGE ORDER
Mar 27, 2025P00012$59.1KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - ANCHOR BOLT HOLES FILL WITH EPOXY CHANGE ORDER
Mar 12, 2025P00009$69.5KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - GOVERNMENT FURNISHED PIPE IRREGULARITIES RFP
Mar 12, 2025P00010$66.2KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION- BYPASS PUMPING PLAN CHANGE ORDER
Mar 12, 2025P00011$111.0KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION - CHIMNEY DRAIN EXTENSION CHANGE ORDER
Sep 17, 2024P00008$48.8KKACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION- BYPASS PUMPING PLAN CHANGE ORDER
Aug 21, 2024P00007$0KACHESS DAM MODIFICATION PHASE 3, YAKIMA PROJECT, WASHINGTON, COLUMBIA-PACIFIC NORTHWEST REGION- RFI 23 AND 25 INSPECTION WELL CHANGE ORDER
Aug 1, 2024P00006$75.6KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
Jul 29, 2024P00005$56.4KWORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. COMPONENTS OF WORK INCLUDE THE FOLLOWING: EXCAVATE DOWNSTREAM FACE OF KACHESS DAM AND FOUNDATION IN AREA OF OUTLET WORKS CONDUIT AND DEMOL
May 24, 2024P00004$0KACHESS DAM MODIFICATION PHASE 3 YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION
May 22, 2024P00003$0KACHESS DAM MODIFICATION PHASE 3 YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION
May 8, 2024P00002$0KACHESS DAM MODIFICATION PHASE 3 YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION
Apr 23, 2024P00001$850.0KKACHESS DAM MODIFICATION PHASE 3 YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION
Apr 2, 20240$16.2MKACHESS DAM MODIFICATION PHASE 3 YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
29 recorded award transactions
+10 points
Latest award action: 2026-08-17
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceFeb 6, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceJan 25, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceJan 24, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceJan 9, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceDec 8, 2023
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceOct 13, 2023

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.