Federal contract award

140R1024C0004

UPPER SNAKE RIVER FIELD OFFICE HVAC RENOVATION PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficePACIFIC NW REGION PN 6615
NAICS238220 — Plumbing, Heating, and Air-Conditioning Contractors
PSCY1NB — CONSTRUCTION OF HEATING AND COOLING PLANTS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$1.1M
Current contract value$1.1M
Potential contract value / ceiling$1.1M
Start dateJun 12, 2024
Current end dateMar 16, 2026
Potential end dateMar 16, 2026
Latest award activityFeb 6, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 6, 2026P00008$38.0KUPPER SNAKE RIVER FIELD OFFICE HVAC RENOVATION PROJECT. CHANGE ORDER ADD IN-SCOPE WORK.
Nov 20, 2025P00007$0UPPER SNAKE RIVER FIELD OFFICE HVAC RENOVATION PROJECT. ADMINISTRATIVE CORRECTION TO UPDATE PRISM CLIN PERIOD FOR INVOICING PURPOSES.
Jun 12, 2025P00006$-5.2KTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE P00002 REMOVAL OF GREY WATER TANK AND METAL WASTEWATER CONTAINMENT SYSTEM. ADDITIONALLY, THIS MODIFICATION EFFECTIVELY EXTENDS THE PERIOD OF PERFORMANCE (POP).
May 13, 2025P00005$0THE PURPOSE OF THIS MODIFICATION IS TO REMOVE THE REQUIREMENT FOR BOTH THE GREY WATER TANK AND THE METAL WASTEWATER CONTAINMENT SYSTEM. THIS MODIFICATION IS TO REMOVE THE GREY WATER AS WELL AS THE METAL WASTEWATER CONTAINMENT SYSTEM AND REVISE CORR
Apr 30, 2025P00004$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACTING OFFICER FROM COLBY CLIFFORD TO MICHAEL NASEATH.
Apr 14, 2025P00003$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACTING OFFICER FROM SCOTT COOPER TO COLBY CLIFFORD.
Mar 13, 2025P00002$0THE PURPOSE OF THIS MODIFICATION IS TO REMOVE THE GRAY WATER TANK AND REPLACE THE TANK WITH A WASTEWATER CONTAINMENT SYSTEM. REVISIONS IN SPEC SECTION 23 05 23 IN RESPONSE TO RFI 007 AND SPEC SECTION 03 20 30 IN RESPONSE TO RFI 011 ARE CAPTURED IN T
Aug 12, 2024P00001$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE REVISIONS TO SPECIFICATION SECTIONS 01 33 00 AND 01 78 30 AND PARALLEL THE POP WITH THE NTP.
Jun 12, 20240$1.1MUPPER SNAKE RIVER FIELD OFFICE HVAC RENOVATION PROJECT

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Hall, StaceyContactshall@usbr.gov
208-378-5142
SourceMar 27, 2024
Hall, StaceyContactshall@usbr.gov
208-378-5142
SourceMar 18, 2024
Hall, StaceyContactshall@usbr.gov
208-378-5142
SourceFeb 13, 2024
Hall, StaceyContactshall@usbr.gov
208-378-5142
SourceJan 17, 2024
Hall, StaceyContactshall@usbr.gov
208-378-5142
SourceNov 6, 2023

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.