Federal contract award
140R1025C0001
TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | PACIFIC NW REGION PN 6615 |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $8.5M |
| Current contract value | $8.5M |
| Potential contract value / ceiling | $8.7M |
| Start date | Dec 6, 2024 |
| Current end date | Oct 20, 2026 |
| Potential end date | Oct 26, 2026 |
| Latest award activity | Jul 9, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 9, 2026 | P00006 | $459.4K | TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CHANGE ORDER CONTRACT MODIFICATION IS ISSUED TO INCORPORATE REVISED SPECIFICATION SECTIONS 41 22 13, SEMIGANTRY CRANES, 41 22 15, C |
| Jun 23, 2026 | P00005 | $-122.1K | TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CONTRACT MODIFICATION IS ISSUED TO DEFINITZE CHANGES ASSOCIATED WITH THE CHANGE ORDER ISSUED UNDER MODIFICATION P00004 FOR RPH UPPE |
| Jul 16, 2025 | P00004 | $698.7K | TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CONTRACT MODIFICATION IS BEING EXECUTED TO DIRECT A CHANGE TO INCORPORATE CHANGES TO SPECIFICATIONS SECTIONS 05 12 10 AND 41 22 17. |
| Apr 29, 2025 | P00003 | $194.1K | TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CONTRACT MODIFICATION ADDS THE REQUIREMENT TO REPLACE THE LOWER CRANE RAILS TO SPECIFICATIONS SECTIONS 00 00 30, FOREWORD AND 01 11 |
| Apr 10, 2025 | P00002 | $0 | TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON: CHANGE THE CONTRACTING OFFICER FROM LANCE FLEMING TO MICHAEL NASEATH. |
| Dec 23, 2024 | P00001 | $0 | TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON: MODIFICATION TO ADJUST PERIOD OF PERFORMANCE (POP) AS A RESULT OF ISSUANCE OF NOTICE TO PROCEED (NTP). |
| Dec 6, 2024 | 0 | $7.2M | TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| Fleming, Lance | Contact | lfleming@usbr.gov 2083785338 | Source | Aug 23, 2024 |
| Fleming, Lance | Contact | lfleming@usbr.gov 2083785338 | Source | Aug 19, 2024 |
| Fleming, Lance | Contact | lfleming@usbr.gov 2083785338 | Source | Aug 2, 2024 |
| Fleming, Lance | Contact | lfleming@usbr.gov 2083785338 | Source | Jul 15, 2024 |
| Fleming, Lance | Contact | lfleming@usbr.gov 2083785338 | Source | Mar 11, 2024 |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.