Federal contract award

140R1025C0001

TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficePACIFIC NW REGION PN 6615
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$8.5M
Current contract value$8.5M
Potential contract value / ceiling$8.7M
Start dateDec 6, 2024
Current end dateOct 20, 2026
Potential end dateOct 26, 2026
Latest award activityJul 9, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 9, 2026P00006$459.4KTAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CHANGE ORDER CONTRACT MODIFICATION IS ISSUED TO INCORPORATE REVISED SPECIFICATION SECTIONS 41 22 13, SEMIGANTRY CRANES, 41 22 15, C
Jun 23, 2026P00005$-122.1KTAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CONTRACT MODIFICATION IS ISSUED TO DEFINITZE CHANGES ASSOCIATED WITH THE CHANGE ORDER ISSUED UNDER MODIFICATION P00004 FOR RPH UPPE
Jul 16, 2025P00004$698.7KTAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CONTRACT MODIFICATION IS BEING EXECUTED TO DIRECT A CHANGE TO INCORPORATE CHANGES TO SPECIFICATIONS SECTIONS 05 12 10 AND 41 22 17.
Apr 29, 2025P00003$194.1KTAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON. THIS CONTRACT MODIFICATION ADDS THE REQUIREMENT TO REPLACE THE LOWER CRANE RAILS TO SPECIFICATIONS SECTIONS 00 00 30, FOREWORD AND 01 11
Apr 10, 2025P00002$0TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON: CHANGE THE CONTRACTING OFFICER FROM LANCE FLEMING TO MICHAEL NASEATH.
Dec 23, 2024P00001$0TAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON: MODIFICATION TO ADJUST PERIOD OF PERFORMANCE (POP) AS A RESULT OF ISSUANCE OF NOTICE TO PROCEED (NTP).
Dec 6, 20240$7.2MTAILRACE SEMIGANTRY CRANE REPLACEMENT GRAND COULEE LEFT AND RIGHT POWERPLANTS COLUMBIA BASIN PROJECT, WASHINGTON

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceAug 23, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceAug 19, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceAug 2, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceJul 15, 2024
Fleming, LanceContactlfleming@usbr.gov
2083785338
SourceMar 11, 2024

Research next steps

  1. Verify whether remaining options may extend performance beyond the current end date.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.