Federal contract award
140R2022C0001
FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | MP-REGIONAL OFFICE |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Z2KB — REPAIR OR ALTERATION OF CANALS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $187.9M |
| Current contract value | $187.9M |
| Potential contract value / ceiling | $187.9M |
| Start date | Oct 7, 2021 |
| Current end date | Aug 5, 2026 |
| Potential end date | Aug 5, 2026 |
| Latest award activity | Aug 5, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 100 of 100 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 5, 2026 | P00099 | $880.0K | DEFINITIZE MOD 57 - CANAL AND BIFURCATED TIE-INS DEFINITIZE MOD 38 - MALLEY PROPERTY AB ROAD DEFINITIZE MOD 61 - CASA BLANCA 48 WSP PIPE BOX CULVERT DEFINITIZE MOD 64 - TURBIDITY CURTAINS REA 22 - TERRA BELLA TURNOUT WEIR BOX CANAL LEAK |
| May 8, 2026 | P00098 | $123.5K | FINALIZE REQUEST FOR CHANGE (RFC-0008)-REVISED 3X3 BOX CULVERT INLET ELEVATIONS |
| Mar 25, 2026 | P00097 | $36.9K | DEFINITIZE UNILATERAL MOD P00013 - RFP 18 DEFINITIZE UNILATERAL MOD P00036 - RFC 0021 - 60 INCH DEER CREEK CROSSING DEFINITIZE UNILATERAL MOD P00060 - TBID WEIR BOX DEFINITIZE UNILATERAL MOD P00079 - RFC 0039 RADIAL GATE MOVEMENTS DEFINITIZE UNIL |
| Aug 21, 2025 | P00096 | $23.7K | DEFINITIZE UNILATERAL MOD P00022 - AVE 80 - RFI 285 DEFINITIZE UNILATERAL MOD P00032 - UNWATER TBID BORROW PIT DEFINITIZE UNILATERAL MOD P00035 & P00052 - RFP 0033 - SCE POWER SUPPLY CHANGES DEFINITIZE UNILATERAL MOD P00043 - 1" ARV DEFI |
| Jun 23, 2025 | P00095 | $203.0K | DEFINITIZE UNILATERAL MOD P00019 - DEER CREEK CONDUIT CROSSING DEFINITIZE UNILATERAL MOD P00053 - DEMOLITION OVERHEAD AT DEER CREEK, INSTALL POWER AND DUCT BANK DEFINITIZE UNILATERAL MOD P00054 - RFC NO. 0030-SCE POWER SUPPLY AT TERRA BELLA DEFINI |
| Mar 4, 2025 | P00094 | $33.5K | DEFINITIZE UNILATERAL MOD P00063 - CANAL STAFF GAUGES DEFINITIZE UNILATERAL MOD P00074 - ADDITIONAL GUARDRAIL INSTALL AT DEER CREEK |
| Feb 13, 2025 | P00093 | $11.4K | DEFINITIZE MOD P00023-RELOCATE DEID-68 TURNOUT |
| Feb 12, 2025 | P00092 | $502.0K | DEFINITIZE MOD 12, 14, 48, 49, 76 |
| Dec 12, 2024 | P00091 | $38.1K | DEFINITIZE MOD P00030-RFP 0014-SPECIFICATION NO. 20-C0907 |
| Dec 9, 2024 | P00090 | $256.7K | FINALIZE REA 00019-ADDITIONAL REBAR 9-IN BULLNOSE RADIUS |
| Nov 19, 2024 | P00089 | $58.0K | FINALIZE REA 00019=ADDITIONAL REBAR 9-IN BULLNOSE RADIUS |
| Nov 14, 2024 | P00088 | $562.9K | DEFINITIZE UNILATERAL MOD P00040 P00050, CLIN QUANTITY OVERRUNS, REA 0026, REA 0028, REA 0029, RFC 0035. |
| Sep 20, 2024 | P00087 | $315.0K | COUNTY ROAD REPAIR ISSUE |
| Aug 13, 2024 | P00086 | $9.1K | DEFINITIZE MODIFICATION P00051-ELECTRICAL CHANGES |
| Aug 7, 2024 | P00085 | $52.3K | REA 0017-ADDITIONAL PULL BOXES AND RC DUCTBANK DB-10B |
| Jul 30, 2024 | P00084 | $3.1K | DEFINITIZE P00068-DEER CREEK RIP RAP EXTENSION |
| Jul 23, 2024 | P00083 | $120.9K | DEFINITIZE P00039, PIPE ABANDONMENTS IN CANAL PRISM, AND P00047, AVENUE 88 21-INCH RCP PIPE ABANDONMENT. |
| Jul 11, 2024 | P00082 | $542.0K | O&M RAMP GRADING AND DRAINAGE MODIFICATION |
| Jun 25, 2024 | P00081 | $316.8K | DEFINITIZATION OF P00031, P00056 AND P00065. |
| Jun 6, 2024 | P00080 | $46.5K | REQUEST FOR PROPOSAL (RFP) NO. 0015- AVE 88-24IN. RW PIPELINE POINT OF CONNECTION |
| May 30, 2024 | P00079 | $19.8K | RFC0039-TIME BASED DEER CREEK RADIAL GATE MOVEMENTS |
| May 16, 2024 | P00078 | $15.8K | TEMPORARY BYPASS AT DCTRA |
| May 7, 2024 | P00077 | $0 | TEMPORARY BYPASS AT DCTRA |
| May 1, 2024 | P00075 | $45.5K | REQUEST FOR EQUITABLE ADJUSTMENT (REA) 0020-REPAIR, REPLACE, AND RE-ESTABLISH STRAW WADDLES DAMAGED BY OTHERS, REQUEST FOR CHANGE (RFC) 10. |
| May 1, 2024 | P00076 | $10.0K | OVER CURRENT ISSUE AT DEER CREEK |
| Apr 24, 2024 | P00074 | $14.0K | GUARDRAIL AT DEER CREEK |
| Apr 23, 2024 | P00073 | $0 | SEGMENT 1 AND 9 O&M ROAD PAVING |
| Apr 22, 2024 | P00072 | $-79.0K | DCTRA FLOWMETER ISSUE |
| Apr 15, 2024 | P00071 | $5.0K | DCTRA FLOWMETER ISSUE |
| Apr 8, 2024 | P00070 | $-88.7K | DEFINITIZE MOD 15 (RFP NO. 0023) & MOD 20 (RFP NO. 0026) |
| Apr 2, 2024 | P00069 | $59.7K | RFP NO. 0036-DEER CREEK PANEL SITE IMPROVEMENTS |
| Mar 26, 2024 | P00067 | $-25.1K | REA 04-SID 24IN. IRRIGATION BYPASS CHANGES |
| Mar 26, 2024 | P00068 | $294.0K | DEER CREEK RIP RAP PLAN |
| Feb 14, 2024 | P00066 | $23.6K | REA 04-SID 24IN. IRRIGATION BYPASS CHANGES |
| Feb 8, 2024 | P00065 | $14.0K | FKC GATE CONTROL & CD SCADAPAK |
| Feb 5, 2024 | P00064 | $20.0K | INSTALL NEW STAFF GUAGES |
| Jan 29, 2024 | P00063 | $8.0K | INSTALL NEW STAFF GUAGES |
| Dec 21, 2023 | P00060 | $68.0K | BIFURCATION TIE-IN CHANGES |
| Dec 21, 2023 | P00061 | $80.0K | BIFURCATION TIE-IN CHANGES |
| Dec 21, 2023 | P00062 | $0 | BIFURCATION TIE-IN CHANGES |
| Dec 15, 2023 | P00059 | $4.0K | BIFURCATION TIE-IN CHANGES |
| Dec 14, 2023 | P00058 | $145.8K | BIFURCATION TIE-IN CHANGES |
| Dec 12, 2023 | P00057 | $600.0K | BIFURCATION TIE-IN CHANGES |
| Nov 15, 2023 | P00056 | $72.2K | TRIMMER & PAVING SHORT TURNAROUND SEQUENCING CHANGE |
| Nov 7, 2023 | P00055 | $-36.2K | DEFINITIZE UNILATERAL MOD P00005, P00006, P00021. |
| Oct 25, 2023 | P00054 | $5.0K | UNILATERAL DIRECTION FOR RFC-0030 SCE POWER SUPPLY AT TERRA BELLA |
| Oct 18, 2023 | P00053 | $42.0K | UNILATERAL DIRECTION FOR RFP 0035-DEMO EXISTING OVERHEAD @ DC, INSTALL NEW POWER & DUCT BANK. |
| Sep 14, 2023 | P00052 | $85.0K | UNILATERAL DIRECTION FOR THE ADDITIONAL FUNDING NEEDED TO CONTINUE THE WORK DESCRIBED IN MODIFICATION P00035-SCE POWER INTERFACE AT DEER CREEK. |
| Aug 30, 2023 | P00051 | $39.6K | UNILATERAL DIRECTION ASSOCIATED WITH THE CHANGES NECESSARY FOR THE REWORK OF MODIFICATION 0031 SID 12-INCH FKC IRRIGATION CROSSING. |
| Aug 28, 2023 | P00050 | $79.0K | UNILATERAL DIRECTION ASSOCIATED WITH THE CHANGES NECESSARY FOR THE REWORK OF MODIFICATION 0031 SID 12-INCH FKC IRRIGATION CROSSING. |
| Aug 14, 2023 | P00048 | $110.0K | RFP NO. 034-AVENUE 88 21-INCH RCP PIPE ABANDONMENT |
| Aug 14, 2023 | P00049 | $13.0K | UNILATERAL DIRECTION ASSOCIATED WITH THE CHANGES NECESSARY FOR THE REWORK OF MODIFICATION 0031 SID 12-INCH FKC IRRIGATION CROSSING. |
| Jul 28, 2023 | P00047 | $34.0K | RFP NO. 034-AVENUE 88 21-INCH RCP PIPE ABANDONMENT |
| Jul 25, 2023 | P00046 | $15.6K | RFP NO. 031- ADDITION OF LADDER DEFLECTOR PLATES |
| Jul 21, 2023 | P00045 | $73.2K | REA 05 TERRA BELLA TIE IN UTILITY |
| Jul 18, 2023 | P00044 | $33.7K | REA 05 TERRA BELLA TIE IN UTILITY |
| Jul 13, 2023 | P00043 | $19.0K | ADD 1" ARV ON THE AVE 80 SID PIPELINE |
| Jul 6, 2023 | P00042 | $75.0K | UNILATERAL MODIFICATION-PROCURE THE STEEL PIPE MATERIALS AS SHOWN IN DRAWING C-508. |
| Jun 21, 2023 | P00041 | $0 | UNILATERAL MODIFICATION-REVISE SECTION H |
| Jun 14, 2023 | P00040 | $0 | UNILATERAL MODIFICATION-REMOVE CONSTRUCTION OF STORM DRAIN PUMP STATION NO. 1 AND 2 FROM CONTRACT |
| Jun 8, 2023 | P00039 | $400.0K | UNILATERAL MODIFICATION-CANAL PRISM PIPE ABANDONMENT |
| May 17, 2023 | P00038 | $90.0K | UNILATERAL RFP NO. 0028- AGG BASE ROAD FOR MALLEY PROPERTY |
| May 12, 2023 | P00037 | $-44.4K | RFP 29 REMOVAL OF 18 INCH PIPE |
| May 11, 2023 | P00036 | $325.0K | UNILATERAL RFC 0021-ENCLOSE DEER CREEK WATER INTO 60-INCH HDPE PIPE |
| May 10, 2023 | P00034 | $-124.3K | DEFINITIZE MOD 2, 8, 10, 11 AND PCO 2 |
| May 10, 2023 | P00035 | $95.0K | UNILATERAL RFP 0033 - SCE POWER SUPPLY CHANGES |
| Apr 7, 2023 | P00033 | $-64.2K | KYTE FKC IRRIGATION CROSSING |
| Mar 28, 2023 | P00032 | $312.0K | PUMPING TO UNWATER THE BORROW PIT. |
| Mar 9, 2023 | P00031 | $166.0K | KYTE FKC IRRIGATION CROSSING |
| Feb 28, 2023 | P00030 | $587.3K | RFP NO.0014- TPD & TBID BERM ADJUSTMENTS |
| Feb 21, 2023 | P00029 | $-19.3K | RFP NO.0024-DELETE CATHODIC PROTECTION AT SID S1 AND SID S2. |
| Jan 26, 2023 | P00028 | $5.5K | RFP 0016- CUT OFF WELL ABANDONMENT RFP 0030- REVISED TRANSDUCERS (NO COST) |
| Jan 18, 2023 | P00027 | $53.3M | FULLY FUND THE CONTRACT. |
| Jan 10, 2023 | P00026 | $-91.4K | VECP NO. 0003 THIMBLE ELIMINATION VECP NO. 0004 FLETCHER PROPERTY BORROW PIT |
| Jan 5, 2023 | P00024 | $243.0K | DEFINITIZE MODIFICATION P0018 |
| Jan 5, 2023 | P00025 | $137.1K | RFC NO. 0006 - ADDITIONAL STAKING AND TREE REMOVAL RFC NO. 0013 - DEER CREEK BOULDERS AND RIP RAP |
| Dec 20, 2022 | P00023 | $33.0K | RFP NO. 0025- RELOCATE DEID-68 TURNOUT. INCORPORATE DRAWING REVISIONS TO E-100 AND E-101 FOR RFP NO. 0021. |
| Dec 19, 2022 | P00022 | $60.0K | REMOVE DISCOVERED TRANSITE PIPE NORTH OF AVE. 80. |
| Dec 15, 2022 | P00021 | $30.0K | RFP NO.13- NOTIFICATION OF CHANGE-WELL ABANDONMENT |
| Dec 14, 2022 | P00020 | $180.0K | RFP NO. 0026- ASBESTOS ABATEMENT OF 54-INCH EXISTING TBID PIPELINE |
| Dec 13, 2022 | P00019 | $120.0K | RFP NO. 0021 - DEER CREEK CONDUIT MODS-RFIS 162 & 206 |
| Nov 8, 2022 | P00018 | $500.0K | RFP NO. 1 - TBID DCTRA TURNOUT & SID-S2 TURNOUTS |
| Sep 21, 2022 | P00017 | $24.2K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Sep 13, 2022 | P00015 | $27.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Sep 13, 2022 | P00016 | $15.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Sep 9, 2022 | P00013 | $90.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Sep 9, 2022 | P00014 | $75.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Sep 7, 2022 | P00012 | $0 | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jul 8, 2022 | P00011 | $15.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 28, 2022 | P00010 | $330.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 27, 2022 | P00009 | $58.9M | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 15, 2022 | P00008 | $125.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 14, 2022 | P00007 | $30.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 13, 2022 | P00005 | $5.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 13, 2022 | P00006 | $25.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 10, 2022 | P00004 | $55.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Jun 8, 2022 | P00003 | $91.2K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Apr 11, 2022 | P00002 | $160.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Mar 18, 2022 | P00001 | $25.0K | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
| Oct 13, 2021 | 0 | $65.6M | FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | Jul 7, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | Jul 2, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | Jul 2, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | Jun 25, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | Jun 11, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | Jun 3, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | May 25, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | May 14, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | May 4, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov 916-978-5539 | Source | Apr 16, 2021 |
| Lowery, Clinton | Contact | clowery@usbr.gov | Source | Oct 21, 2020 |
| Lowery, Clinton | Contact | clowery@usbr.gov | Source | Jul 28, 2020 |