Federal contract award

140R4025C0005

THE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeUPPER COLORADO REGIONAL OFFICE
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2KA — REPAIR OR ALTERATION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$115.0M
Current contract value$115.0M
Potential contract value / ceiling$117.6M
Start dateMar 21, 2025
Current end dateFeb 10, 2029
Potential end dateFeb 10, 2029
Latest award activityJul 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 9, 2026P00011$51.6KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING AND UPDATED DRAWINGS OF THE CORBEL PIN PEDESTAL REINFORCEMENT SO THAT THE WORK CAN BE COMPLETED.
Jul 14, 2026P00009$0THIS MODIFICATION INCORPORATES CLARIFICATIONS TO THE CONTRACT SPECIFICATIONS AND DRAWINGS. THE CLARIFICATIONS DO NOT CHANGE THE SCOPE OF WORK, CONTRACT PRICE, CONTRACT COMPLETION DATE, OR OTHER TERMS AND CONDITIONS OF THE CONTRACT.
Jul 14, 2026P00010$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE START DATE OF CLIN 11. THIS IS AN ADMINISTRATIVE ACTION ONLY.
Jun 4, 2026P00008$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO ALLOCATE FUNDS FOR THE CONSTRUCTION OF A TEMPORARY ACCESS ROAD ON THE NORTH SIDE OF THE PROJECT IN ACCORDANCE WITH FAR 52.236-2 DIFFERING SITE CONDITIONS. THIS ACCESS IS NECESSARY FOR THE CONSTRUCTION OF THE STI
May 19, 2026P00006$66.0KHYRUM DAM SPILLWAY REPLACEMENT
May 19, 2026P00007$0HYRUM DAM SPILLWAY REPLACEMENT
May 8, 2026P00005$53.5KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CONTRACT RATES FOR PROFIT, HOME OFFICE OVERHEAD, AND FIELD OFFICE OVERHEAD. ADDITIONALLY, THIS MODIFICATION INCLUDES AN ADJUSTMENT FOR THE DRILLING OF DEEP WELLS AND THE DEFINITIZATION OF UNDEFINITIZED
Feb 10, 2026P00004$1.2MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL LINE 3: SUPPLEMENTARY DEEP WELLS INSTALLATION/REMOVAL AND SUPPLEMENTARY DEEP WELLS MATERIALS, AND OPTIONAL LINE 4: SUPPLEMENTARY DEEP WELLS OPERATION AND POWER
Sep 9, 2025P00003$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SPECIFICATIONS TO ALLOW FOR THE CAPPING OF PREVIOUSLY BURIED, NON-HAZARDOUS CONSTRUCTION MATERIAL THAT IS DISCOVERED DURING EXCAVATION OF THE DISTURBANCE AREA(S) DOCUMENTED IN THE ENVIRONMENTAL ASSESS
Aug 19, 2025P00002$0THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: APPROVE THE MATERIAL SUBSTITUTIONS FOR THE HYRUM AND EAST FIELD CANAL SIPHONS, PROVIDE REVISED SECTIONS TO THE SPECIFICATIONS, AND PROVIDE REVISED DRAWING SECTIONS
Jun 10, 2025P00001$0THE PURPOSE OF THIS MODIFICATION IS TO DIRECT THE CONTRACTOR TO PERFORM ALL WORK NECESSARY TO REPAIR THE ACCESS ROAD THAT WAS DAMAGED BY WATER BURSTING FROM THE HYRUM FEEDER DITCH PIPE.
Mar 21, 20250$112.1MTHE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL

Estimated positioning window

Feb 10, 2028 – Aug 10, 2028

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2029-02-10 (839 days from calculation)
+15 points
6 historical awards in this buyer and category group
+15 points
12 recorded award transactions
+10 points
Latest award action: 2026-07-14
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Rock, LynetteContactLRock@usbr.gov
385-228-8535
SourceNov 11, 2024
Rock, LynetteContactLRock@usbr.gov
385-228-8535
SourceNov 4, 2024
Rock, LynetteContactLRock@usbr.gov
385-228-8535
SourceOct 18, 2024
Rock, LynetteContactLRock@usbr.gov
385-228-8535
SourceSep 14, 2024
Rock, LynetteContactLRock@usbr.gov
385-228-8535
SourceAug 31, 2024
Rock, LynetteContactLRock@usbr.gov
385-228-8535
SourceMay 22, 2024

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.