Federal contract award
140R4025C0005
THE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Interior |
| Office | UPPER COLORADO REGIONAL OFFICE |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Z2KA — REPAIR OR ALTERATION OF DAMS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $115.0M |
| Current contract value | $115.0M |
| Potential contract value / ceiling | $117.6M |
| Start date | Mar 21, 2025 |
| Current end date | Feb 10, 2029 |
| Potential end date | Feb 10, 2029 |
| Latest award activity | Jul 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 9, 2026 | P00011 | $51.6K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING AND UPDATED DRAWINGS OF THE CORBEL PIN PEDESTAL REINFORCEMENT SO THAT THE WORK CAN BE COMPLETED. |
| Jul 14, 2026 | P00009 | $0 | THIS MODIFICATION INCORPORATES CLARIFICATIONS TO THE CONTRACT SPECIFICATIONS AND DRAWINGS. THE CLARIFICATIONS DO NOT CHANGE THE SCOPE OF WORK, CONTRACT PRICE, CONTRACT COMPLETION DATE, OR OTHER TERMS AND CONDITIONS OF THE CONTRACT. |
| Jul 14, 2026 | P00010 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE START DATE OF CLIN 11. THIS IS AN ADMINISTRATIVE ACTION ONLY. |
| Jun 4, 2026 | P00008 | $1.6M | THE PURPOSE OF THIS MODIFICATION IS TO ALLOCATE FUNDS FOR THE CONSTRUCTION OF A TEMPORARY ACCESS ROAD ON THE NORTH SIDE OF THE PROJECT IN ACCORDANCE WITH FAR 52.236-2 DIFFERING SITE CONDITIONS. THIS ACCESS IS NECESSARY FOR THE CONSTRUCTION OF THE STI |
| May 19, 2026 | P00006 | $66.0K | HYRUM DAM SPILLWAY REPLACEMENT |
| May 19, 2026 | P00007 | $0 | HYRUM DAM SPILLWAY REPLACEMENT |
| May 8, 2026 | P00005 | $53.5K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CONTRACT RATES FOR PROFIT, HOME OFFICE OVERHEAD, AND FIELD OFFICE OVERHEAD. ADDITIONALLY, THIS MODIFICATION INCLUDES AN ADJUSTMENT FOR THE DRILLING OF DEEP WELLS AND THE DEFINITIZATION OF UNDEFINITIZED |
| Feb 10, 2026 | P00004 | $1.2M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL LINE 3: SUPPLEMENTARY DEEP WELLS INSTALLATION/REMOVAL AND SUPPLEMENTARY DEEP WELLS MATERIALS, AND OPTIONAL LINE 4: SUPPLEMENTARY DEEP WELLS OPERATION AND POWER |
| Sep 9, 2025 | P00003 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SPECIFICATIONS TO ALLOW FOR THE CAPPING OF PREVIOUSLY BURIED, NON-HAZARDOUS CONSTRUCTION MATERIAL THAT IS DISCOVERED DURING EXCAVATION OF THE DISTURBANCE AREA(S) DOCUMENTED IN THE ENVIRONMENTAL ASSESS |
| Aug 19, 2025 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: APPROVE THE MATERIAL SUBSTITUTIONS FOR THE HYRUM AND EAST FIELD CANAL SIPHONS, PROVIDE REVISED SECTIONS TO THE SPECIFICATIONS, AND PROVIDE REVISED DRAWING SECTIONS |
| Jun 10, 2025 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DIRECT THE CONTRACTOR TO PERFORM ALL WORK NECESSARY TO REPAIR THE ACCESS ROAD THAT WAS DAMAGED BY WATER BURSTING FROM THE HYRUM FEEDER DITCH PIPE. |
| Mar 21, 2025 | 0 | $112.1M | THE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL |
Estimated positioning window
Feb 10, 2028 – Aug 10, 2028
60/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 60/100. Available recorded signals: 55 points.
- Contract end 2029-02-10 (839 days from calculation)
- +15 points
- 6 historical awards in this buyer and category group
- +15 points
- 12 recorded award transactions
- +10 points
- Latest award action: 2026-07-14
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| Rock, Lynette | Contact | LRock@usbr.gov 385-228-8535 | Source | Nov 11, 2024 |
| Rock, Lynette | Contact | LRock@usbr.gov 385-228-8535 | Source | Nov 4, 2024 |
| Rock, Lynette | Contact | LRock@usbr.gov 385-228-8535 | Source | Oct 18, 2024 |
| Rock, Lynette | Contact | LRock@usbr.gov 385-228-8535 | Source | Sep 14, 2024 |
| Rock, Lynette | Contact | LRock@usbr.gov 385-228-8535 | Source | Aug 31, 2024 |
| Rock, Lynette | Contact | LRock@usbr.gov 385-228-8535 | Source | May 22, 2024 |
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.