Federal contract award

140R6018C0015

IGF::CT::IGF - BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeGREAT PLAINS REGIONAL OFFICE
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2KA — REPAIR OR ALTERATION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$109.0M
Current contract value$109.0M
Potential contract value / ceiling$109.0M
Start dateSep 20, 2018
Current end dateSep 16, 2024
Potential end dateSep 16, 2024
Latest award activityApr 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 65 of 65 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 2, 2026P00064$0BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Feb 4, 2026P00063$1.7MBULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Sep 18, 2025P00062$1.3MBULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Sep 20, 2024P00061$0BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Sep 17, 2024P00060$0BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Jul 30, 2024P00059$5.0MBULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Jun 13, 2024P00058$0BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
May 20, 2024P00057$0BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Apr 16, 2024P00056$0BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Mar 8, 2024P00054$2.5MBULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Mar 8, 2024P00055$0BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
Feb 2, 2024P00053$0THE PURPOSE OF THIS MODIFICATION IS TO DIRECT THE CONTRACTOR TO REMOVE 41,031 SQ FT OF GEOGRID FROM THE TEMPORARY COFFERDAM AREA.
Jan 24, 2024P00052$0THE PURPOSE OF THIS MODIFICATION IS TO DIRECT THE CONTRACTOR TO OBTAIN ADDITIONAL ZONE 1A MATERIAL OFFSITE FOR THE PERMANENT COFFERDAM.
Dec 19, 2023P00051$0THE PURPOSE OF THIS MODIFICATION IS TO DIRECT THE CONTRACTOR TO OBTAIN ZONE 1A MATERIAL OFFSITE FOR THE PERMANENT COFFERDAM.
Dec 12, 2023P00050$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE UNILATERAL CHANGE ORDER NO. P00029.
Oct 24, 2023P00049$0THIS MODIFICATION IS A CHANGE ORDER DIRECTING THE CONTRACTOR TO CUT EXISTING BRIDGE PLATES TO FIT WITH THE NEW BEARING PADS BASED ON MODIFIED SPECIFICATIONS AND DRAWINGS.
Aug 31, 2023P00048$2.7MTHIS MODIFICATION IS A CHANGE ORDER DIRECTING THE CONTRACTOR TO INSTALL DEWATERING SYSTEMS, USE ZONE 5A MATERIAL, INSTALL A CHAIN LINK FENCE IN A DIFFERENT MANNER, ALL BASED ON MODIFIED SPECIFICATIONS AND DRAWINGS.
Jun 14, 2023P00046$0THIS MODIFICATION DEFINITIZES UNILATERAL CHANGE ORDER NO. P00016.
Jun 14, 2023P00047$0THIS MODIFICATION PROVIDES EQUITABLE ADJUSTMENT IN RESPONSE TO SERIAL LETTER 080, CORONAVIRUS AND QUARANTINE IMPACTS.
May 15, 2023P00044$0THIS MODIFICATION ADDRESSES THE TIME PERIOD ESCALATION FOR FIELD OFFICE OVERHEAD FOR THE ADDITIONAL 708 DAYS OF CONTRACT PERFORMANCE (DUE TO GOV SUSPENSION).
May 15, 2023P00045$0THIS MODIFICATION PROVIDES EQUITABLE ADJUSTMENT IN RESPONSE TO SERIAL LETTERS 049 AND 103, REA ZONE 4 MATERIAL.
May 10, 2023P00040$0THIS MODIFICATION DEFINITIZES UNILATERAL MODIFICATION NO. P00019.
May 10, 2023P00041$0THIS MODIFICATION PROVIDES EQUITABLE ADJUSTMENT FOR REA NW CORNER WELLS.
May 10, 2023P00042$2.2MTHIS MODIFICATION DIRECTS THE CONTRACTOR TO PERFORM INVESTIGATIVE DRILLING AND DEWATERING OF THE PERMANENT COFFERDAM.
May 10, 2023P00043$0THIS MODIFICATION PROVIDES EQUITABLE ADJUSTMENT FOR EXPIRED CONCRETE MATERIALS (EXPIRED DURING GOVERNMENT SUSPENSION).
Apr 18, 2023P00039$0THIS MODIFICATION DEFINITIZES UNILATERAL MODIFICATION NO. P00010
Feb 17, 2023P00038$5.0MTHIS MODIFICATION OBLIGATES ADDITIONAL FUNDING.
Dec 1, 2022P00035$0THIS MODIFICATION DEFINITIZES UNILATERAL MODIFICATION NO. P00004 AND P00009
Dec 1, 2022P00036$0THIS MODIFICATION DEFINITIZES UNILATERAL MODIFICATION NO. P00036
Dec 1, 2022P00037$0THIS MODIFICATION DEFINITIZES UNILATERAL MODIFICATION NO. P00008 AND P00014
Sep 17, 2022P00033$0THIS MODIFICATION INCORPORATES REVISIONS TO SPECS AND DRAWINGS REGARDING THE REINFORCEMENT IN THE CREST STRUCTURE WALLS
Sep 17, 2022P00034$1.9MTHIS MODIFICATION INCORPORATES REVISIONS TO SPECS AND DRAWINGS REGARDING THE REINFORCEMENT IN THE CREST STRUCTURE WALLS
Jun 7, 2022P00032$500.0KTHIS MODIFICATION DIRECTS THE CONTRACTOR TO CONSTRUCT EXTERNAL COUNTERFORT WALLS ON THE EXTERIOR OF STILLING BASIN WALLS ON SLABS 10 AND 12
May 31, 2022P00031$5.0MTHIS MODIFICATION OBLIGATES ADDITIONAL FUNDING
May 30, 2022P00029$1.4MTHIS MODIFICATION DIRECTS THE CONTRACTOR TO PROVIDE ADDITIONAL ZONE 1A, MISC FILL MATERIALS, TO ADDRESS SHORTAGE.
May 30, 2022P00030$210.0KTHIS MODIFICATION DIRECTS THE CONTRACTOR TO INSTALL A LAYER OF GEOTEXTILE BETWEEN THE ZONE 2 - SAND FILTER AND ZONE 3 - GRAVEL MATERIAL
Mar 20, 2022P00027$0THIS MODIFICATION INCORPORATES A TIME EXTENSION OF 709 CALENDAR DAYS FROM THE 01 32 10-4 - CONSTRUCTION PROGRAM, TIME IMPACT ANALYSES FOR MODIFICATION P00006 AND GLOBAL DEWATERING MODIFICATIONS.
Mar 20, 2022P00028$17.4KTHIS MODIFICATION PROVIDES AN EQUITABLE ADJUSTMENT FOR ALL WORK PERFORMED UNDER UNILATERAL MODIFICATION NO. P00007
Sep 24, 2021P00026$7.3MTHIS MODIFICATION OBLIGATES ADDITIONAL FUNDING TO COVER ADDITIONAL COSTS OF UNILATERAL MODIFICATIONS UNTIL DEFINITIZATION
Apr 28, 2021P00025$5.0MTHIS MODIFICATION OBLIGATES ADDITIONAL FUNDING TO COVER ADDITIONAL COSTS OF UNILATERAL MODIFICATIONS UNTIL DEFINITIZATION
Mar 3, 2021P00024$75.0KTHIS MODIFICATION DIRECTS THE CONTRACTOR TO INSTALL EMBANKMENT MEASUREMENT POINTS IN THE STILLING BASIN AREA
Jan 26, 2021P00023$200.0KTHIS MODIFICATION DIRECTS THE CONTRACTOR TO COMPLETE LAND BASED LIDAR SCANS OF THE UPPER CREST STRUCTURE, SPILLWAY CHUTE LOCATION, SURROUNDING AREA, AND OTHER LOCATIONS AS DETERMINED BY THE COR
Nov 27, 2020P00020$450.0KTHIS MODIFICATION DIRECTS THE CONTRACTOR TO CONSTRUCT THE TEMPORARY ACCESS ROAD SO THAT THE GOVERNMENT DRILL RIG CAN PERFORM ADDITIONAL TESTING IN THE UPSTREAM ACCESS AREA
Nov 27, 2020P00021$2.0MTHIS MODIFICATION OBLIGATES ADDITIONAL FUNDING TO COVER SOME OF THE CONTRACTORS COSTS OF THE SUSPENSION OF WORK (JULY 2020) IN ADVANCE OF THE SUSPENSION REA BEING SUBMITTED AND NEGOTIATED IN TOTAL
Nov 27, 2020P00022$700.0KTHIS MODIFICATION OBLIGATES ADDITIONAL FUNDING TO COVER SOME OF THE CONTRACTORS COSTS AS A RESULT OF THE DIFFERING SITE CONDITION IN THE NORTHWEST CORNER
Sep 18, 2020P00017$0THIS UNILATERAL MODIFICATION INCORPORATES REVISIONS TO SPECIFICATIONS SECTIONS
Sep 18, 2020P00018$6.0MTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE LIMITATION ON COST FOR UNILATERAL MODIFICATION NO. P00015
Sep 18, 2020P00019$500.0KTHIS MODIFICATION DIRECTS THE CONTRACTOR TO PROVIDE DRILLING SUPPORT FOR GOVERNMENT AS THEY COMPLETE THE CONE PENETRATION TESTING
Jun 17, 2020P00016$40.0KTHIS UNILATERAL MODIFICATION DIRECTS THE CONTRACTOR TO PERFORM WORK NECESSARY TO CORRECT DAMAGE TO THE TOP OF THE SECANT PILE WALL
Jun 16, 2020P00015$8.0MTHIS UNILATERAL MODIFICATION DIRECTS THE CONTRACTOR TO DRILL APPROXIMATELY 66 DEEP WELLS AND ADDITIONAL PIEZOMETERS AS NECESSARY TO DEWATER THE SITE
Apr 6, 2020P00012$1.4MTHIS MODIFICATION OBLIGATES ADDITIONAL FUNDING
Apr 6, 2020P00013$0THIS UNILATERAL MODIFICATION INCREASES THE LIMITATION ON COST FOR MODIFICATION NO. P00006 FROM $650,000 TO $900,000
Apr 6, 2020P00014$0THIS UNILATERAL MODIFICATION INCREASES THE LIMITATION ON COST FOR MODIFICATION NO. P00008 FROM $170,000 TO $775,000
Apr 1, 2020P00010$2.0MTHIS MODIFICATION DIRECTS THE CONTRACTOR TO DESIGN AND INSTALL A DEWATERING SYSTEM IN THE SOUTHWEST CORNER
Apr 1, 2020P00011$0THIS MODIFICATION INCORPORATES REVISIONS TO SPECIFICATIONS SECTION 31 24 15 - ZONE 4, BENTONITE-TREATED EARTHFILL
Feb 24, 2020P00007$170.0KTHIS MODIFICATION ALLOWS DIRECTS THE CONTRACTOR TO INSTALL A FILTER BERM IN THE EXCAVATED AREA THAT ENCOUNTERED SEEPAGE
Feb 24, 2020P00008$170.0KTHIS MODIFICATION DIRECTS THE CONTRACTOR TO INSTALL PIEZOMETERS AND PERFORM INVESTIGATIONS
Feb 24, 2020P00009$100.0KTHIS MODIFICATION INCREASES THE LIMITATION ON COST FOR UNILATERAL MODIFICATION NO. P00004
Sep 20, 2019P00006$650.0KTHIS MODIFICATION ALLOWS DIRECTS THE CONTRACTOR PERFORM DETWATERING AT THE SPILLWAY CREST
Jul 18, 2019P00005$0THIS MODIFICATION ALLOWS THE CONTRACTOR TO FILL THE DRILLED PHASE I TERMINAL SECANT PILES WITH GOVERNMENT FURNISHED BENTONITE PELLETS IN LIEU OF THE SPECIFIED ZONE 1A MATERIAL SHOWN IN DRAWING NO. 1236-D-25
Apr 28, 2019P00004$150.0KIGF::CT::IGF - THIS MODIFICATION INCORPORATES REVISED SHEET NO. 5, DRAWING NO. 1236-D-18 AND NEW SHEET 5A, 1236-D-60006
Apr 4, 2019P00003$0IGF::CT::IGF - THIS MODIFICATION INCORPORATES REVISIONS TO DRAWING NO. 1236-D-37
Mar 26, 2019P00002$0IGF::CT::IGF - THIS MODIFICATION INCORPORATES REVISIONS TO FOUR OF THE EXISTING DRAWINGS
Feb 28, 2019P00001$0IGF::CT::IGF - THIS MODIFICATION INCORPORATES A REVISED SPECIFICATION SECTION 01 33 00 - SUBMITTALS
Sep 20, 20180$44.6MIGF::CT::IGF - BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Gerri Voto-BraunSupervisory Contract Specialistgvotobraun@usbr.gov
(406) 247-7809
SourceNov 13, 2017
Gerri Voto-BraunSupervisory Contract Specialistgvotobraun@usbr.gov
(406) 247-7809
SourceNov 5, 2017
Gerri Voto-BraunSupervisory Contract Specialistgvotobraun@usbr.gov
(406) 247-7809
SourceOct 15, 2017
Gerri Voto-BraunSupervisory Contract Specialistgvotobraun@usbr.gov
(406) 247-7809
SourceSep 13, 2017
Gerri Voto-BraunSupervisory Contract Specialistgvotobraun@usbr.gov
(406) 247-7809
SourceAug 8, 2017
Gerri Voto-BraunSupervisory Contract Specialistgvotobraun@usbr.gov
(406) 247-7809
SourceJul 2, 2017
Gerri Voto-BraunSupervisory Contract Specialistgvotobraun@usbr.gov
(406) 247-7809
SourceJun 27, 2017