Federal contract award

140R6024C0015

LEADVILLE WATER TREATMENT PLANT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeGREAT PLAINS REGIONAL OFFICE
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCY1NE — CONSTRUCTION OF WATER SUPPLY FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$133.2M
Current contract value$133.2M
Potential contract value / ceiling$133.2M
Start dateSep 20, 2024
Current end dateOct 27, 2029
Potential end dateOct 27, 2029
Latest award activityAug 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 27, 2026P00008$1.2MTHE PURPOSE OF THIS MODIFICATION IS TO NEGOTIATE A SUPPLEMENTAL AGREEMENT FOR THE DEWATERING ACTIVITIES REQUIREMENT.
Jul 14, 2026P00007$138.8KEO 14398 - THE PURPOSE OF THIS MODIFICATION IS TO NEGOTIATE A SUPPLEMENTAL AGREEMENT FOR THE RSMC AND CONCRETE FLOOR HARDENER REQUIREMENTS, REVISED SPECIFICATION SECTIONS, UPDATE PERIOD OF PERFORMANCE FOR ALL CLINS, AND INCORPORATE FAR 52.222-90.
Jun 11, 2026P00006$-1.5KTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE GAS METER RELOCATION AND UPDATE CONTRACT END DATE.
Jan 26, 2026P00005$13.4KTHE PURPOSE OF THIS MODIFICATION IS TO REMOVE/INCORPORATE FAR CLAUSE DEVIATION UPDATES, INCORPORATE REVISED SURVEY DRAWING, INCORPORATE REVISED SPECIFICATION SECTION 31 23 02, UPDATE CONTRACT END DATE BASED ON NTP, AND PAY REMAINING WATER TAP FEES.
Aug 21, 2025P00004$0WATERLINE RE-ALIGNMENT (RIVER ROAD)
Jun 23, 2025P00003$62.0KPARKVILLE WATER DISTRICT TAP FEE
Apr 22, 2025P00002$40.0KLEADVILLE WATER TREATMENT PLANT - REVISE SPECIFICATIONS AND DRAWINGS TO RELOCATE NATURAL GAS METER & SERVICE LATERAL
Mar 27, 2025P00001$0LEADVILLE WATER TREATMENT PLANT - REVISE SPECIFICATIONS AND DRAWINGS
Sep 20, 20240$131.8MLEADVILLE WATER TREATMENT PLANT

Estimated positioning window

Oct 27, 2028 – Apr 27, 2029

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2029-10-27 (1091 days from calculation)
+15 points
5 historical awards in this buyer and category group
+15 points
9 recorded award transactions
+10 points
Latest award action: 2026-08-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Esplin, DwaneContactdesplin@usbr.gov
801-524-3743
SourceMay 26, 2024
Esplin, DwaneContactdesplin@usbr.gov
801-524-3743
SourceMay 14, 2024
Esplin, DwaneContactdesplin@usbr.gov
801-524-3743
SourceApr 25, 2024
Esplin, DwaneContactdesplin@usbr.gov
801-524-3743
SourceApr 4, 2024
Esplin, DwaneContactdesplin@usbr.gov
801-524-3743
SourceMar 11, 2024
Stone, StevenContactsstone@usbr.gov
0000000000
SourceDec 29, 2023

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.