Federal contract award

15F06721F0002767

HARDWARE: RACKMOUNT SERVERS WITH GPUS: INSPECT THE CONTENT OF VIDEO TO DYNAMICALLY DETERMINE THE SUITABLE COLLECTION RATE, AND DYNAMICALLY PRESENT TO EACH USER AN OPTIMIZED VIEWING STREAM BASED ON THE SIZE OF THE VIEW AND AVAILABLE BANDWIDTH. HARDWAR

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Justice
OfficeFBI-JEH
NAICS541519 — Other Computer Related Services
PSCR425 — Engineering and Technical Services
Parent award / vehicleNNG15SC59B
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$4.3M
Current contract value$4.3M
Potential contract value / ceiling$4.3M
Start dateSep 24, 2021
Current end dateSep 23, 2026
Potential end dateSep 23, 2026
Latest award activityApr 27, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 27, 2026P00001$89.7KHARDWARE: RACKMOUNT SERVERS WITH GPUS: INSPECT THE CONTENT OF VIDEO TO DYNAMICALLY DETERMINE THE SUITABLE COLLECTION RATE, AND DYNAMICALLY PRESENT TO EACH USER AN OPTIMIZED VIEWING STREAM BASED ON THE SIZE OF THE VIEW AND AVAILABLE BANDWIDTH. HARDWAR
Apr 27, 2026P00002$0HARDWARE: RACKMOUNT SERVERS WITH GPUS: INSPECT THE CONTENT OF VIDEO TO DYNAMICALLY DETERMINE THE SUITABLE COLLECTION RATE, AND DYNAMICALLY PRESENT TO EACH USER AN OPTIMIZED VIEWING STREAM BASED ON THE SIZE OF THE VIEW AND AVAILABLE BANDWIDTH. HARDWAR
Sep 24, 20210$4.2MHARDWARE: RACKMOUNT SERVERS WITH GPUS: INSPECT THE CONTENT OF VIDEO TO DYNAMICALLY DETERMINE THE SUITABLE COLLECTION RATE, AND DYNAMICALLY PRESENT TO EACH USER AN OPTIMIZED VIEWING STREAM BASED ON THE SIZE OF THE VIEW AND AVAILABLE BANDWIDTH. HARDWAR

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.