Federal contract award

1605AE24C0007

POTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR THIS SCOPE OF WORK (SOW) INCLUDES DESIGN-BUILD SERVICES NEEDED TO PROVIDE AND INSTALL IMPROVEMENTS TO THE POTOMAC JOB CORPS CENTER SWM

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Labor
OfficeDOL - JCAS - AEC
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$3.4M
Current contract value$3.4M
Potential contract value / ceiling$3.4M
Start dateJul 5, 2024
Current end dateOct 16, 2026
Potential end dateOct 16, 2026
Latest award activityAug 31, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 31, 2026P00006$0POTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR
Jul 9, 2026P00005$188.0KPOTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR
May 27, 2026P00004$0POTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR MOD 34 - NO COST TIME EXTENSION OF FIFTY-TWO (52) CALENDAR DAYS ADDED FOR WEATHER IMPACTS AND DELAYS ENCOUNTERED BETWEEN THE PERIOD OF
Jan 21, 2026P00003$0POTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR MOD 3 - NO COST TIME EXTENSION DUE TO PERMIT DELAYS.
Sep 25, 2025P00002$409.2KPOTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR MOD 2 - ADDITIONAL DESIGN AND CONSTRUCTION ADDRESSING THE STABILITY/INTEGRITY OF THE BRICK EXTERIOR WALL STRUCTURE
Jan 22, 2025P00001$0POTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR A) THIS MODIFICATION IS HEREBY ISSUED TO REMOVE H.56 ADVANCING EQUITY IN THE ENGAGEMENT OF WORKERS PERFORMING SERVICES UNDER THE CONT
Jul 5, 20240$2.8MPOTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR THIS SCOPE OF WORK (SOW) INCLUDES DESIGN-BUILD SERVICES NEEDED TO PROVIDE AND INSTALL IMPROVEMENTS TO THE POTOMAC JOB CORPS CENTER SWM

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.