Federal contract award

19AQMM21C0155

DESIGN BUILD CONSTRUCTION OF THE DOHA NEW EMBASSY COMPOUND

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of State
OfficeACQUISITIONS - AQM MOMENTUM
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AA — CONSTRUCTION OF OFFICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$241.6M
Current contract value$241.6M
Potential contract value / ceiling$241.6M
Start dateSep 3, 2021
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityAug 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 23 of 23 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 4, 2026P00022$422.3KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT TO REVISE THE CIRCUIT INTERRUPTER BREAKER AND REPLACE THE DOOR AND SECURE HARDWARE.
May 4, 2026P00021$132.4KTHE PURPOSE OF THIS MODIFICATION IS TO ADMINISTRATIVELY CHANGE THE INVOICING PROCEDURES TO ALLOW FOR THE CONTRACTOR TO SUBMIT INVOICES VIA THE IPP SYSTEM. THIS MODIFICATION DOES NOT CHANGE THE CONTRACT COMPLETION DATE. ALL TERMS AND CONDITIONS REMAI
Apr 27, 2026P00020$0THE PURPOSE OF THIS MODIFICATION IS TO ADMINISTRATIVELY CHANGE THE INVOICING PROCEDURES TO ALLOW FOR THE CONTRACTOR TO SUBMIT INVOICES VIA THE IPP SYSTEM. THIS MODIFICATION DOES NOT CHANGE THE CONTRACT COMPLETION DATE. ALL TERMS AND CONDITIONS REMAI
Apr 20, 2026P00019$24.7KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENTS FOR OFF-SITE CONDITIONED STORAGE FOR GFCI FURNITURE.
Feb 4, 2026P00018$1.0MTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENTS FOR WATER FEATURE CONSTRUCTION AND OUTDOOR CLIMATE CONTROLLED ENCLOSURES CHANGES.
Aug 12, 2025P00017$856.1KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENTS FOR SECURITY ADDITIONS AND TRANSFORMER SPECIFICATION CHANGES.
Jul 10, 2025P00016$344.8KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENTS FOR THE INFRASTRUCTURE FOR ARTWORK, ANTI-RAM WALL, AND CALL SERVER CHANGES.
Jun 13, 2025P00015$666.8KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT FOR THE WATER FEATURE AND ELECTRICAL DEMARC ROOM CHANGES.
Mar 31, 2025P00014$770.9KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT FOR THE WATER FEATURE AND ELECTRICAL DEMARC ROOM CHANGES.
Jan 22, 2025P00013$291.8KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT FOR ANTENNA CHANGES AND ADDITIONAL GALLERY AND AMERICAN CENTER AV SCOPE AND ADD KAHUA AS AN APPROVED SBU SYSTEM FOR USE WITH THE DOHA NEC PROJECT.
Dec 9, 2024P00012$93.9KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT FOR REVISED ELECTRICAL AND ADDITIONAL CONSULAR AV SCOPE.
Sep 3, 2024P00011$593.6KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT FOR IDR DESIGN CHANGES, UPDATE NON-SECURE HARDWARE, AND SEALING ADHERED STONE.
Aug 15, 2024P00010$372.0KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT FOR MISCELLANEOUS DESIGN CHANGES AND DOHA WIND SPEED RISK CATEGORY I FOR NOB FACADE STRUCTURE AND THE METAL CANOPY WIND LOAD CALCULATIONS.
May 6, 2024P00009$501.0KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT FOR THE OMC SERVER ROOM, CLAN SWITCHES, ADDITIONAL FCU, GSO REQUESTED CHANGES IN SPX, AND CHANGING WORKROOM 0701 TO FSNI OFFICE.
Feb 22, 2024P00008$4.4MTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFPS 016, 018, 025, 026 AND REA 002.
Jan 10, 2024P00007$367.5KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFPS RFPS 002, 013, AND 022.
Aug 31, 2023P00006$1.9MTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFPS 004, 005, 008, 009, AND 014 - 015.
Jun 3, 2023P00005$26.9KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFP 006.
Dec 7, 2022P00004$155.2KTHIS MODIFICATION IS WRITTEN TO INCORPORATE THE REVISED/CHANGED PERFORMANCE REQUIREMENT AS DESCRIBED IN RFPS 003 AND 007.
Jun 29, 2022P00003$119.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE DIVISION 1 SPEC SECTION 011006 PARTNERING AND ADD A NEW CLIN 004 FOR PARTNERING.
May 11, 2022P00002$0THE PURPOSE OF THIS MODIFICATION IS TO ADD REQUIREMENTS LANGUAGE TO DIVISION 1 SPECIFICATION SECTION 013550 CONSTRUCTION SECURITY PARAGRAPH 3.04.E.5.A.3.
Nov 22, 2021P00001$0THIS MOD IS TO CONVERT THIS CONTRACT TO IPP
Sep 3, 20210$228.5MDESIGN BUILD CONSTRUCTION OF THE DOHA NEW EMBASSY COMPOUND

Estimated positioning window

Oct 18, 2026 – Jan 16, 2027

Modeled likelihood: 80%. These are AcornBids estimates, not confirmed solicitation dates.

{
  "psc": "Y1AA",
  "naics": "236220",
  "agency": "Department of State",
  "office": "ACQUISITIONS - AQM MOMENTUM",
  "incumbent": "AMERICAN INTERNATIONAL CONTRACTORS (SPECIAL PROJECTS) INC.",
  "known_forecast": false,
  "option_end_date": "2026-12-31",
  "contract_end_date": "2026-12-31",
  "latest_action_date": "2026-08-04",
  "modification_count": 23,
  "previous_solicitation": "19AQMM20R0017",
  "historical_award_count": 276,
  "historical_cadence_days": 18
}

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.