Federal contract award
19GE5024F0478
RENOVATION DESIGN OF HANSAALLEE 127 -129 BUILDING, THE A&E CONTRACTOR SHALL PROPOSAL TO PERFORM A FULL DESIGN PACKAGE/ AS-BUILT SURVEY AND STUDY TO IDENTIFY DEFICIENCIES, HAZARDS, AND PROVIDE UPDATED ENGINEERING DRAWINGS FOR FUTURE BUILDING UPGRADE R
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of State |
| Office | ACQUISITIONS - RPSO FRANKFURT |
| NAICS | 541310 — Architectural Services |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | 19GE5022D0009 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $550.6K |
| Current contract value | $550.6K |
| Potential contract value / ceiling | $550.6K |
| Start date | Sep 30, 2024 |
| Current end date | May 29, 2026 |
| Potential end date | May 29, 2026 |
| Latest award activity | May 22, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 22, 2026 | P00002 | $0 | RENOVATION DESIGN OF HANSAALLEE 127 -129 BUILDING, THE A&E CONTRACTOR SHALL PROPOSAL TO PERFORM A FULL DESIGN PACKAGE/ AS-BUILT SURVEY AND STUDY TO IDENTIFY DEFICIENCIES, HAZARDS, AND PROVIDE UPDATED ENGINEERING DRAWINGS FOR FUTURE BUILDING UPGRADE R |
| Jan 22, 2026 | P00001 | $0 | RENOVATION DESIGN OF HANSAALLEE 127 -129 BUILDING, THE A&E CONTRACTOR SHALL PROPOSAL TO PERFORM A FULL DESIGN PACKAGE/ AS-BUILT SURVEY AND STUDY TO IDENTIFY DEFICIENCIES, HAZARDS, AND PROVIDE UPDATED ENGINEERING DRAWINGS FOR FUTURE BUILDING UPGRADE R |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.