Federal contract award
19LA9025P0337
NEW CONTROL SYSTEM CONSISTS OF A TOUCHSCREEN HMI (HUMAN MACHINE INTERFACE) AND PLC (PROGRAMMABLE LOGIC CONTROLLER) WITH 24 VDC UNINTERRUPTIBLE POWER SUPPLY (UPS) TO OPERATE THE THREE (3) PUMPS OF POTABLE WATER TREATMENT PLANT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of State |
| Office | U.S. EMBASSY VIENTIANE |
| NAICS | 237110 — Water and Sewer Line and Related Structures Construction |
| PSC | 6625 — Electrical and Electronic Properties Measuring and Testing Instruments |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $21.9K |
| Current contract value | $21.9K |
| Potential contract value / ceiling | $21.9K |
| Start date | Apr 22, 2025 |
| Current end date | Sep 11, 2025 |
| Potential end date | Sep 11, 2025 |
| Latest award activity | Jun 13, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 13, 2025 | P00002 | $0 | NEW CONTROL SYSTEM CONSISTS OF A TOUCHSCREEN HMI (HUMAN MACHINE INTERFACE) AND PLC (PROGRAMMABLE LOGIC CONTROLLER) WITH 24 VDC UNINTERRUPTIBLE POWER SUPPLY (UPS) TO OPERATE THE THREE (3) PUMPS OF POTABLE WATER TREATMENT PLANT. |
| Apr 28, 2025 | P00001 | $0 | NEW CONTROL SYSTEM CONSISTS OF A TOUCHSCREEN HMI (HUMAN MACHINE INTERFACE) AND PLC (PROGRAMMABLE LOGIC CONTROLLER) WITH 24 VDC UNINTERRUPTIBLE POWER SUPPLY (UPS) TO OPERATE THE THREE (3) PUMPS OF POTABLE WATER TREATMENT PLANT. |
| Apr 22, 2025 | 0 | $21.9K | NEW CONTROL SYSTEM CONSISTS OF A TOUCHSCREEN HMI (HUMAN MACHINE INTERFACE) AND PLC (PROGRAMMABLE LOGIC CONTROLLER) WITH 24 VDC UNINTERRUPTIBLE POWER SUPPLY (UPS) TO OPERATE THE THREE (3) PUMPS OF POTABLE WATER TREATMENT PLANT. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.